Timber Creek Trail Segment F in Lewisville, TX
Intersection of Misty Lane and Andrea Court, Lewisville, TX, 75067
Timber Creek Trail Segment F is a new construction project at Intersection of Misty Lane and Andrea Court, Lewisville, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $3.0M across about 140,000 sq ft.
- Estimated project value
- $3.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 140,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $21/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 1mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
165 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
760 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75067 (Lewisville)
One email per change. Unsubscribe in one click. Privacy.
Timber Creek Trail Segment F is a New Construction project located at Intersection of Misty Lane and Andrea Court, Lewisville, TX 75067 in Lewisville, Texas. The project has an estimated value of $3.0M covering 140,000 sq ft. City of Lewisville is the property owner and TBG Partners is the design firm of record. The project was registered with TDLR on December 19, 2023.
Frequently Asked Questions
What is Timber Creek Trail Segment F?
Timber Creek Trail Segment F is a new construction project at Intersection of Misty Lane and Andrea Court in Lewisville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Public Trail and sidewalk, 140,000 sf
Is Timber Creek Trail Segment F open in Lewisville?
Timber Creek Trail Segment F was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Timber Creek Trail Segment F located?
Timber Creek Trail Segment F is located at Intersection of Misty Lane and Andrea Court, Lewisville, TX, 75067, in Denton County.
Who is the owner or developer of Timber Creek Trail Segment F?
City of Lewisville is the property owner/developer of record for Timber Creek Trail Segment F, per its TDLR project registration.
Who is the architect or design firm for Timber Creek Trail Segment F?
TBG Partners is the design firm of record for Timber Creek Trail Segment F, according to its TDLR filing.
How much does Timber Creek Trail Segment F cost and how big is it?
Timber Creek Trail Segment F has an estimated construction value of $3.0M and approximately 140,000 square feet (about $21/sqft), based on its TDLR filing.
Scope of Work
Public Trail and sidewalk, 140,000 sf
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Intersection of Misty Lane and Andrea Court, Lewisville, TX, 75067
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$232.3M totalWatch all construction in 75067 (Lewisville)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Lewisville?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.