Project intelligenceTDLR TABS2024013828Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

HEB Trinity High School - Early Package 1

500 N Industrial Blvd, Euless, TX, 76039

Target date passed (Aug 2024)Project Registered

HEB Trinity High School - Early Package 1 is a renovation/alteration project at 500 N Industrial Blvd, Euless, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $3.6M across about 20,000 sq ft.

Estimated project value
$3.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
20,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$180/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 14, 2024169 days across supplied datesAug 30, 2024

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    48 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    121 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76039 (Euless)

One email per change. Unsubscribe in one click. Privacy.

HEB Trinity High School - Early Package 1 is a Renovation/Alteration project located at 500 N Industrial Blvd, Euless, TX 76039 in Euless, Texas. The project has an estimated value of $3.6M covering 20,000 sq ft. Hurst Euless Bedford Independent School District is the property owner and Corgan Architects Inc is the design firm of record. The project was registered with TDLR on March 14, 2024.

Frequently Asked Questions

What is HEB Trinity High School - Early Package 1?

HEB Trinity High School - Early Package 1 is a renovation/alteration project at 500 N Industrial Blvd in Euless, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Relocation of Portables

Is HEB Trinity High School - Early Package 1 open in Euless?

HEB Trinity High School - Early Package 1 was scheduled to finish construction in Aug 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is HEB Trinity High School - Early Package 1 located?

HEB Trinity High School - Early Package 1 is located at 500 N Industrial Blvd, Euless, TX, 76039, in Tarrant County.

Who is the owner or developer of HEB Trinity High School - Early Package 1?

Hurst Euless Bedford Independent School District is the property owner/developer of record for HEB Trinity High School - Early Package 1, per its TDLR project registration.

Who is the architect or design firm for HEB Trinity High School - Early Package 1?

Corgan Architects Inc is the design firm of record for HEB Trinity High School - Early Package 1, according to its TDLR filing.

How much does HEB Trinity High School - Early Package 1 cost and how big is it?

HEB Trinity High School - Early Package 1 has an estimated construction value of $3.6M and approximately 20,000 square feet (about $180/sqft), based on its TDLR filing.

Scope of Work

Relocation of Portables

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

500 N Industrial Blvd, Euless, TX, 76039

Location by street address

Watch all construction in 76039 (Euless)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.