HEB Trinity High School in Euless, TX
500 N Industrial Blvd, Euless, TX, 76039
HEB Trinity High School is a new construction project at 500 N Industrial Blvd, Euless, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jul 2030. The project has an estimated value of $293.0M across about 218,000 sq ft.
- Estimated project value
- $293.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 218,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.34K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5y 5mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
113 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
1,948 days after the preceding date shown.
Source: TDLR filing
View source record
📰About HEB Trinity High School
HEB Trinity High School is a new 218,000-square-foot facility being built by Hurst Euless Bedford Independent School District at 500 N Industrial Blvd in Euless. The project is valued at $293,000,000 and was registered with TDLR in November 2024. Corgan Architects Inc serves as the design firm of record for this significant educational development.
The construction scope for HEB Trinity High School includes the new high school and associated parking, developed in four distinct phases. Phase 1 covers 151,000 square feet from February 2025 to May 2026. Phase 2 adds 218,000 square feet from May 2026 to March 2028. Phase 3 involves 169,500 square feet from June 2028 to December 2029. The final phase consists of site work from August 2029 to July 2030.
The filing indicates a construction start date of March 2025, with the project targeted for July 2030. The estimated cost of $293,000,000 translates to $1,344 per square foot. This cost is above the Tarrant County median for new construction filings, which stands at $800,000. The scheduled build window of 1,948 days is significantly longer than the county median of 214 days.
Ronald L Davis is the registered accessibility specialist for this project. The funding involves public funds, public land, or is a Federally funded roadway project. The district has two other TDLR-registered projects totaling $10,609,000, including another Trinity High School project and L.D. Bell High School. Corgan Architects Inc has four other registered projects totaling $480,709,000, including DC01 in Burlington and Terminal B at DFW Airport.
The site is located in ZIP code 76039, where the U.S. Census estimates a population of about 40,664 and a median household income of $83,177. Nearby businesses include Brightstar Psychiatry, Euless Town Center, and Thai Papaya Garden. Tarrant County’s unemployment rate was 4.7 percent in June 2026, higher than a year earlier. The project status is Project Registered, with plan review pending.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76039 (Euless)
One email per change. Unsubscribe in one click. Privacy.
HEB Trinity High School is a New Construction project located at 500 N Industrial Blvd, Euless, TX 76039 in Euless, Texas. The project has an estimated value of $293.0M covering 218,000 sq ft. Hurst Euless Bedford Independent School District is the property owner and Corgan Architects Inc is the design firm of record. The project was registered with TDLR on November 8, 2024.
Frequently Asked Questions
When will the new HEB Trinity High School be completed?
The filing states the project is targeted for July 2030. Construction is scheduled to begin in March 2025, with the final phase of site work concluding in July 2030.
Who is the design firm for the new high school?
Corgan Architects Inc is the design firm of record for this project. They are also registered for other major projects, including DC01 in Burlington and Terminal B at DFW Airport.
What is the estimated cost of the new construction?
The estimated cost is $293,000,000. This figure is above the Tarrant County median for new construction filings, which is $800,000. The cost per square foot is $1,344.
Is the new high school open to the public?
The TDLR record shows the project is registered for new construction with plan review pending. It is not yet open, as the completion date is targeted for July 2030.
Who is the owner of the project?
Hurst Euless Bedford Independent School District is the owner/developer of record. They have two other TDLR-registered projects, including L.D. Bell High School in Hurst.
What is HEB Trinity High School?
HEB Trinity High School is a new construction project at 500 N Industrial Blvd in Euless, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New High School and associated parking built in (4) Phases. Schedule and SF by phase are 1: 02/25 - 05/26 151,000 SF, 2: 05/26 - 03/28 218,000 SF, 3: 06/28 - 12/29 169,500 SF, 4:08/29 - 07/30 Site Work.
Is HEB Trinity High School open in Euless?
HEB Trinity High School is still under construction in Euless, TX, with an estimated completion of Jul 2030 according to its TDLR registration.
Where is HEB Trinity High School located?
HEB Trinity High School is located at 500 N Industrial Blvd, Euless, TX, 76039, in Tarrant County.
Who is the owner or developer of HEB Trinity High School?
Hurst Euless Bedford Independent School District is the property owner/developer of record for HEB Trinity High School, per its TDLR project registration.
Who is the architect or design firm for HEB Trinity High School?
Corgan Architects Inc is the design firm of record for HEB Trinity High School, according to its TDLR filing.
How much does HEB Trinity High School cost and how big is it?
HEB Trinity High School has an estimated construction value of $293.0M and approximately 218,000 square feet (about $1.34K/sqft), based on its TDLR filing.
Scope of Work
New High School and associated parking built in (4) Phases. Schedule and SF by phase are 1: 02/25 - 05/26 151,000 SF, 2: 05/26 - 03/28 218,000 SF, 3: 06/28 - 12/29 169,500 SF, 4:08/29 - 07/30 Site Work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
500 N Industrial Blvd, Euless, TX, 76039
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$660.2M totalWatch all construction in 76039 (Euless)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Euless?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.