Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Manvel High School Servery Renovations - Phase 1
19601 Hwy 6, Manvel, TX, 77578
Manvel High School Servery Renovations - Phase 1 is a renovation/alteration project at 19601 Hwy 6, Manvel, in Brazoria County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2024). The project has an estimated value of $1.2M across about 6,000 sq ft.
- Estimated project value
- $1.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 6,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $200/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
67 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
74 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77578 (Manvel)
One email per change. Unsubscribe in one click. Privacy.
Manvel High School Servery Renovations - Phase 1 is a Renovation/Alteration project located at 19601 Hwy 6, Manvel, TX 77578 in Manvel, Texas. The project has an estimated value of $1.2M covering 6,000 sq ft. Alvin Independent School District is the property owner and JMB2 Architecture Cooperative is the design firm of record. The project was registered with TDLR on March 21, 2024.
Frequently Asked Questions
What is Manvel High School Servery Renovations - Phase 1?
Manvel High School Servery Renovations - Phase 1 is a renovation/alteration project at 19601 Hwy 6 in Manvel, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 6000 sf +/- renovation of existing servery area
Is Manvel High School Servery Renovations - Phase 1 open in Manvel?
Construction on Manvel High School Servery Renovations - Phase 1 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2024. The building is finished and very likely open.
Where is Manvel High School Servery Renovations - Phase 1 located?
Manvel High School Servery Renovations - Phase 1 is located at 19601 Hwy 6, Manvel, TX, 77578, in Brazoria County.
Who is the owner or developer of Manvel High School Servery Renovations - Phase 1?
Alvin Independent School District is the property owner/developer of record for Manvel High School Servery Renovations - Phase 1, per its TDLR project registration.
Who is the architect or design firm for Manvel High School Servery Renovations - Phase 1?
JMB2 Architecture Cooperative is the design firm of record for Manvel High School Servery Renovations - Phase 1, according to its TDLR filing.
How much does Manvel High School Servery Renovations - Phase 1 cost and how big is it?
Manvel High School Servery Renovations - Phase 1 has an estimated construction value of $1.2M and approximately 6,000 square feet (about $200/sqft), based on its TDLR filing.
Scope of Work
6000 sf +/- renovation of existing servery area
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
19601 Hwy 6, Manvel, TX, 77578
Related Projects
Same Owner
$608.6M totalSame Design Firm
$7.7M totalWatch all construction in 77578 (Manvel)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Manvel?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.