Playground resurfacing project in West Lake Hills, TX
1203 S. Capital of Texas Hwy, West Lake Hills, TX, 78746
Playground resurfacing project is a renovation/alteration project at 1203 S. Capital of Texas Hwy, West Lake Hills, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $350K across about 6,000 sq ft.
- Estimated project value
- $350K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 6,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $58/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
36 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
122 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
463 days after the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78746 (West Lake Hills)
One email per change. Unsubscribe in one click. Privacy.
Playground resurfacing project is a Renovation/Alteration project located at 1203 S. Capital of Texas Hwy, West Lake Hills, TX 78746 in West Lake Hills, Texas. The project has an estimated value of $350K covering 6,000 sq ft. Eanes Independent School District is the property owner and CasaBella Architects is the design firm of record. The project was registered with TDLR on April 26, 2024.
Frequently Asked Questions
What is Playground resurfacing project?
Playground resurfacing project is a renovation/alteration project at 1203 S. Capital of Texas Hwy in West Lake Hills, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Resurfacing an existing playground from artificial turf to poured-in-place rubber. 6000SF
Is Playground resurfacing project open in West Lake Hills?
Construction on Playground resurfacing project is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Where is Playground resurfacing project located?
Playground resurfacing project is located at 1203 S. Capital of Texas Hwy, West Lake Hills, TX, 78746, in Travis County.
Who is the owner or developer of Playground resurfacing project?
Eanes Independent School District is the property owner/developer of record for Playground resurfacing project, per its TDLR project registration.
Who is the architect or design firm for Playground resurfacing project?
CasaBella Architects is the design firm of record for Playground resurfacing project, according to its TDLR filing.
How much does Playground resurfacing project cost and how big is it?
Playground resurfacing project has an estimated construction value of $350K and approximately 6,000 square feet (about $58/sqft), based on its TDLR filing.
Scope of Work
Resurfacing an existing playground from artificial turf to poured-in-place rubber. 6000SF
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1203 S. Capital of Texas Hwy, West Lake Hills, TX, 78746
Related Projects
Same Owner
$35.8M totalRelated City Permits
Building permits found at or near this location
ETJ - RUN WATER YARD LINE
Express: replace existing wet space with new walk in shower including new valve and prefabricated acrylic walls Like for like.
Express: replace existing wet space with new walk in shower including new valve and prefabricated acrylic walls Like for like.
Replacement of complete existing central heat and air system with or without duct work
ETJ - This is to obtain temporary power for construction of a new home.
Watch all construction in 78746 (West Lake Hills)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in West Lake Hills?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.