Go Dog
Go Dog is a renovation/alteration project at 6406 N Interstate 35 Frontage Rd., Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $2.5M across about 11,700 sq ft.
๐Project Metrics
TDLR #TABS2024020899Review Complete
Design review complete, construction may proceed
Go Dog is a Renovation/Alteration project located at 6406 N Interstate 35 Frontage Rd., Austin, TX 78752 in Austin, Texas. The project has an estimated value of $2.5M covering 11,700 sq ft. Austin Renaissance Limited is the property owner and DXU Architects is the design firm of record. The project was registered with TDLR on June 14, 2024.
โFrequently Asked Questions
What is Go Dog?
Go Dog is a renovation/alteration project at 6406 N Interstate 35 Frontage Rd. in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: interior build out of a dog daycare and boarding facility. Work includes carpentry, electrical, plumbing and HVAC disciplines
Is Go Dog open in Austin?
Go Dog is currently under construction in Austin, TX. Its current TDLR status is "Review Complete".
Where is Go Dog located?
Go Dog is located at 6406 N Interstate 35 Frontage Rd., Austin, TX, 78752, in Travis County.
Who is the owner or developer of Go Dog?
Austin Renaissance Limited is the property owner/developer of record for Go Dog, per its TDLR project registration.
Who is the architect or design firm for Go Dog?
DXU Architects is the design firm of record for Go Dog, according to its TDLR filing.
How much does Go Dog cost and how big is it?
Go Dog has an estimated construction value of $2.5M and approximately 11,700 square feet (about $214/sqft), based on its TDLR filing.
๐Scope of Work
interior build out of a dog daycare and boarding facility. Work includes carpentry, electrical, plumbing and HVAC disciplines
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jun 14, 2024
Review Complete
Jun 14, 2024
Inspection Complete
Closed
๐Related Projects
๐คSame Owner
$9.8M total๐Related City Permits
Building permits found at or near this location
Express: Remove and replace 16 windows (like for like)
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA
REMODEL EXISTING THEATRE SPACE ADD SLOPE FLOOR FOR ELEVATED SEATING AND NEW PARTITION FOR GREEN ROOM.
REMODEL EXISTING THEATRE SPACE ADD SLOPE FLOOR FOR ELEVATED SEATING AND NEW PARTITION FOR GREEN ROOM.
7 DAY - Existing ceiling panels will be removed. exposed ductwork will be installed in conditioned space. new lighting will be installed. volume of space will increase - OVA