Project intelligenceTDLR TABS2024022608New Construction
Funding type

This project is privately funded, on private land for private use.

Starbucks Shell Building in Gladewater, TX

Hwy 80 and Money St, Gladewater, TX, 75647

Target date passed (Dec 2024)Review Complete

Starbucks Shell Building is a new construction project at Hwy 80 and Money St, Gladewater, in Gregg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.0M across about 2,300 sq ft.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,300 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$435/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 9, 2024145 days across supplied datesDec 1, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    54 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    91 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75647 (Gladewater)

One email per change. Unsubscribe in one click. Privacy.

Starbucks Shell Building is a New Construction project located at Hwy 80 and Money St, Gladewater, TX 75647 in Gladewater, Texas. The project has an estimated value of $1.0M covering 2,300 sq ft. Asher Development is the property owner and Thomas A Pirtle, III is the design firm of record. The project was registered with TDLR on July 9, 2024.

Frequently Asked Questions

What is Starbucks Shell Building?

Starbucks Shell Building is a new construction project at Hwy 80 and Money St in Gladewater, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Construction of Shell building

Is Starbucks Shell Building open in Gladewater?

Starbucks Shell Building was scheduled to finish construction in Dec 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Starbucks Shell Building located?

Starbucks Shell Building is located at Hwy 80 and Money St, Gladewater, TX, 75647, in Gregg County.

Who is the owner or developer of Starbucks Shell Building?

Asher Development is the property owner/developer of record for Starbucks Shell Building, per its TDLR project registration.

Who is the architect or design firm for Starbucks Shell Building?

Thomas A Pirtle, III is the design firm of record for Starbucks Shell Building, according to its TDLR filing.

How much does Starbucks Shell Building cost and how big is it?

Starbucks Shell Building has an estimated construction value of $1.0M and approximately 2,300 square feet (about $435/sqft), based on its TDLR filing.

Scope of Work

New Construction of Shell building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Hwy 80 and Money St, Gladewater, TX, 75647

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75647 (Gladewater)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Gladewater?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.