Project intelligenceTDLR TABS2024024415New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

New Azle Junior High School

201 School Street, Azle, TX, 76020

Target date passed (Jul 2026)Review Complete

New Azle Junior High School is a new construction project at 201 School Street, Azle, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jul 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $90.0M across about 180,383 sq ft.

Estimated project value
$90.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
180,383 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$499/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 11mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 31, 2024730 days across supplied datesJul 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    32 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    698 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76020 (Azle)

One email per change. Unsubscribe in one click. Privacy.

New Azle Junior High School is a New Construction project located at 201 School Street, Azle, TX 76020 in Azle, Texas. The project has an estimated value of $90.0M covering 180,383 sq ft. Azle ISD is the property owner and VLK Architects, Inc. is the design firm of record. The project was registered with TDLR on July 31, 2024.

Frequently Asked Questions

What is New Azle Junior High School?

New Azle Junior High School is a new construction project at 201 School Street in Azle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement school on existing campus and site work, demolish existing school.

Is New Azle Junior High School open in Azle?

New Azle Junior High School was scheduled to finish construction in Jul 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is New Azle Junior High School located?

New Azle Junior High School is located at 201 School Street, Azle, TX, 76020, in Tarrant County.

Who is the owner or developer of New Azle Junior High School?

Azle ISD is the property owner/developer of record for New Azle Junior High School, per its TDLR project registration.

Who is the architect or design firm for New Azle Junior High School?

VLK Architects, Inc. is the design firm of record for New Azle Junior High School, according to its TDLR filing.

How much does New Azle Junior High School cost and how big is it?

New Azle Junior High School has an estimated construction value of $90.0M and approximately 180,383 square feet (about $499/sqft), based on its TDLR filing.

Scope of Work

Replacement school on existing campus and site work, demolish existing school.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

201 School Street, Azle, TX, 76020

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76020 (Azle)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.