Project intelligenceTDLR TABS2024024807New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

G-PISD Maintenance / Transportation Facility & Family Resource Center in Gregory, TX

502 N. Gregory Avenue, Gregory, TX, 78359

Construction complete · Sep 2026Inspection Complete

G-PISD Maintenance / Transportation Facility & Family Resource Center is a new construction project at 502 N. Gregory Avenue, Gregory, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $21.0M across about 37,777 sq ft.

Estimated project value
$21.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
37,777 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$556/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 6, 2024784 days across supplied datesSep 29, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    456 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    302 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About G-PISD Maintenance / Transportation Facility & Family Resource Center

The G-PISD Operations and Family Resource Center in Gregory, Texas, has passed its final TDLR accessibility inspection in September 2026, confirming that construction is complete. The project, filed under the name G-PISD Maintenance / Transportation Facility & Family Resource Center, is a new construction effort totaling 37,777 sq ft at 502 N. Gregory Avenue.

Developed by the Gregory-Portland Independent School District, the facility includes an addition to the existing bus barn, a new carport canopy for bus parking, a new shop, and a new maintenance facility. All four structures utilize Type IIB construction. The estimated cost for this development is $21,000,000, which works out to $556 per square foot.

Project Scope and Design

Turner-Ramirez Architects served as the design firm of record for this project. The scope of work focused on expanding the district's maintenance campus to support its transportation and operational needs. Jose Ricardo Guerrero is the registered accessibility specialist associated with the filing. The project was registered with TDLR in August 2024, with plan review completed in the same month.

Construction began in September 2024, with a scheduled completion date of December 2025. The final inspection was passed in September 2026, marking the end of the construction phase.

Local Context and Scale

This project is significantly larger than the median new construction filing in San Patricio County. The county median estimated cost is $1,100,000, and the median size is 7,652 sq ft. The scheduled build window for this project was 456 days, which is longer than the county median of 243 days. The cost per square foot of $556 is above the county median of $200.

The Gregory-Portland Independent School District has six other TDLR-registered projects totaling $14,630,464, including facilities in Portland. Local coverage from kiiitv.com reported that G-PISD broke ground on the family resource center, noting that a clothing closet and full food pantry will be available as part of the facility.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78359 (Gregory)

One email per change. Unsubscribe in one click. Privacy.

G-PISD Maintenance / Transportation Facility & Family Resource Center is a New Construction project located at 502 N. Gregory Avenue, Gregory, TX 78359 in Gregory, Texas. The project has an estimated value of $21.0M covering 37,777 sq ft. Gregory-Portland Independent School District is the property owner and Turner-Ramirez Architects is the design firm of record. The project was registered with TDLR on August 6, 2024.

Frequently Asked Questions

Is the G-PISD Operations and Family Resource Center open?

Construction is complete following the final TDLR accessibility inspection in September 2026. Local coverage reported that a clothing closet and full food pantry will be available, but the TDLR record does not specify a public opening date.

What is the total square footage of the new facility?

The project totals 37,777 sq ft. This includes an addition to the bus barn, a new carport canopy, a new shop, and a new maintenance facility.

Who is the owner of the project?

The owner of record is the Gregory-Portland Independent School District. Turner-Ramirez Architects is the design firm of record.

What is the estimated cost of the project?

The estimated cost is $21,000,000. This equates to $556 per square foot, which is above the San Patricio County median of $200 per square foot.

What is G-PISD Maintenance / Transportation Facility & Family Resource Center?

G-PISD Maintenance / Transportation Facility & Family Resource Center is a new construction project at 502 N. Gregory Avenue in Gregory, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THE EXISTING MAINTENANCE CAMPUS FOR G-PISD WILL HAVE THE ADDITION TO THE BUS BARN, A NEW CARPORT CANOPY FOR BUS PARKING, A NEW SHOP, AND THE NEW MAINTENANCE FACILITY. THE FOUR (4) NEW STRUCTURES WILL ALL BE TYPE IIB CONSTRUCTION.

Is G-PISD Maintenance / Transportation Facility & Family Resource Center open in Gregory?

Construction on G-PISD Maintenance / Transportation Facility & Family Resource Center is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.

Where is G-PISD Maintenance / Transportation Facility & Family Resource Center located?

G-PISD Maintenance / Transportation Facility & Family Resource Center is located at 502 N. Gregory Avenue, Gregory, TX, 78359, in San Patricio County.

Who is the owner or developer of G-PISD Maintenance / Transportation Facility & Family Resource Center?

Gregory-Portland Independent School District is the property owner/developer of record for G-PISD Maintenance / Transportation Facility & Family Resource Center, per its TDLR project registration.

Who is the architect or design firm for G-PISD Maintenance / Transportation Facility & Family Resource Center?

Turner-Ramirez Architects is the design firm of record for G-PISD Maintenance / Transportation Facility & Family Resource Center, according to its TDLR filing.

How much does G-PISD Maintenance / Transportation Facility & Family Resource Center cost and how big is it?

G-PISD Maintenance / Transportation Facility & Family Resource Center has an estimated construction value of $21.0M and approximately 37,777 square feet (about $556/sqft), based on its TDLR filing.

Scope of Work

THE EXISTING MAINTENANCE CAMPUS FOR G-PISD WILL HAVE THE ADDITION TO THE BUS BARN, A NEW CARPORT CANOPY FOR BUS PARKING, A NEW SHOP, AND THE NEW MAINTENANCE FACILITY. THE FOUR (4) NEW STRUCTURES WILL ALL BE TYPE IIB CONSTRUCTION.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

502 N. Gregory Avenue, Gregory, TX, 78359

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78359 (Gregory)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.