Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
DISD JL Long Middle School in Dallas, TX
6116 Reiger Ave, Dallas, TX, 75214
DISD JL Long Middle School is a renovation/alteration project at 6116 Reiger Ave, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $4.9M across about 5,574 sq ft.
- Estimated project value
- $4.9M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,574 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $874/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 6mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
138 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
549 days after the preceding date shown.
Source: TDLR filing
View source record
📰About DISD JL Long Middle School
DISD JL Long Middle School at 6116 Reiger Ave in Dallas is the subject of a $4,870,720 renovation project registered with TDLR in October 2024. The filing specifies a scope that includes providing a secure front vestibule, replacing the fire alarm system, and updating mechanical equipment in the auditorium. The estimated size of the work is 5,574 sq ft, resulting in a computed cost of $874 per sq ft.
Dallas ISD is the owner of record for this alteration project. The design firm of record is DLR Group in of Texas. The registered accessibility specialist listed on the filing is Garry Don Headrick. The project involves public funds and public land. The construction start date per the filing is March 2025, with a target completion date of September 2026.
Project Scale and Context
The estimated cost of the DISD JL Long Middle School renovation is above the county median for renovation and alteration filings in Dallas County. The median estimated cost for comparable projects is $250,000. The scheduled build window for this project is 549 days, which is longer than the county median of 92 days. The cost per square foot of $874 is also above the county median of $73 per sq ft.
Dallas ISD has six other TDLR-registered projects totaling $2,861,365. These include Victor H Hexter Elementary School, Personalized LA at Highland Meadows, and Jerry R Junkins ES. DLR Group in of Texas has six other TDLR-registered projects totaling $32,270,300, including Texas Health Dallas PB4 and FWISD Daggett Montessori School.
The project was registered with TDLR in October 2024 with a target completion of September 2026; no plan review or inspection has been recorded since, so whether it proceeded is not confirmed in the public record. The TDLR status remains Project Registered.
ZIP code 75214 has a population of about 35,006 and a median household income of $128,917. The median owner-occupied home value is $707,400. Dallas County unemployment rate was 3 percent in August 2026, lower than a year earlier.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75214 (Dallas)
One email per change. Unsubscribe in one click. Privacy.
DISD JL Long Middle School is a Renovation/Alteration project located at 6116 Reiger Ave, Dallas, TX 75214 in Dallas, Texas. The project has an estimated value of $4.9M covering 5,574 sq ft. Dallas ISD is the property owner and DLR Group in of Texas is the design firm of record. The project was registered with TDLR on October 14, 2024.
Frequently Asked Questions
What is the status of the JL Long Middle School renovation?
The project is registered with TDLR. No plan review or inspection has been recorded, so the current construction status is not confirmed in the public record.
Who is the owner and designer of the project?
Dallas ISD is the owner of record. DLR Group in of Texas is the design firm of record for this renovation project.
What is the estimated cost of the work?
The estimated cost for the renovation of JL Long Middle School is $4,870,720. This is above the median cost for similar projects in Dallas County.
What specific improvements are included in the scope?
The scope includes a secure front vestibule, new fire alarm system, RPZ replacement, exterior lighting updates, auditorium mechanical equipment, and a gym divider curtain.
Is the school open for business?
The construction status and business opening are different things. The facts only cover construction. No plan review or inspection has been recorded to confirm completion or opening.
What is DISD JL Long Middle School?
DISD JL Long Middle School is a renovation/alteration project at 6116 Reiger Ave in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Provide secure front vestibule, replace fire alarm system, replace RPZ, update exterior lighting in certain locations, update mechanical equipment in auditorium, and install gym divider curtain
Is DISD JL Long Middle School open in Dallas?
DISD JL Long Middle School was scheduled to finish construction in Sep 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is DISD JL Long Middle School located?
DISD JL Long Middle School is located at 6116 Reiger Ave, Dallas, TX, 75214, in Dallas County.
Who is the owner or developer of DISD JL Long Middle School?
Dallas ISD is the property owner/developer of record for DISD JL Long Middle School, per its TDLR project registration.
Who is the architect or design firm for DISD JL Long Middle School?
DLR Group in of Texas is the design firm of record for DISD JL Long Middle School, according to its TDLR filing.
How much does DISD JL Long Middle School cost and how big is it?
DISD JL Long Middle School has an estimated construction value of $4.9M and approximately 5,574 square feet (about $874/sqft), based on its TDLR filing.
Scope of Work
Provide secure front vestibule, replace fire alarm system, replace RPZ, update exterior lighting in certain locations, update mechanical equipment in auditorium, and install gym divider curtain
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
6116 Reiger Ave, Dallas, TX, 75214
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$3.17B totalWatch all construction in 75214 (Dallas)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dallas?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.