Project intelligenceTDLR TABS2025004502Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Mockingbird Elementry School in Dallas, TX

5828 Mockingbird Lane, Dallas, TX, 75206

Construction complete · Nov 2026Project Closed

Mockingbird Elementry School is a renovation/alteration project at 5828 Mockingbird Lane, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2026). The project has an estimated value of $2.5M across about 76,938 sq ft.

Estimated project value
$2.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
76,938 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$32/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 30, 2024753 days across supplied datesNov 22, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    214 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    287 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    25 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    227 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Mockingbird Elementry School

The renovation of Mockingbird Elementary School at 5828 Mockingbird Lane in Dallas is complete. The project passed its final TDLR accessibility inspection in April 2026, confirming that the construction work described in the filing has been finished. The building spans 76,938 sq ft and underwent a renovation/alteration process with an estimated cost of $2,473,340.

Dallas Independent School District is the owner of record for this project. The scope of work included minor interior renovations to create a new secure entry vestibule and a new staff lounge. A significant portion of the exterior work involved moving the main entrance to the East side of the building. This required replacing the existing sidewalk and ramp to ensure proper access at the new entry point.

Project Details and Context

Kline Hardin Architects served as the design firm of record for the renovation. Grady Gammons was the registered accessibility specialist associated with the project. The work was registered with TDLR in October 2024, and plan review was completed in the same month. Construction began in June 2025, with a scheduled completion date of March 2026. The final inspection passed in April 2026, marking the end of the construction phase.

The estimated cost of $2,473,340 places this project above the median estimated cost for renovation/alteration filings in Dallas County, which is $250,000. However, the cost per square foot of $32 is below the county median of $73 per square foot. The scheduled build window of 287 days was longer than the county median of 92 days for similar projects. This project is one of several undertaken by Dallas Independent School District, which has six other TDLR-registered projects totaling $37,642,928.

The project involved public funds and was located on public land. The area surrounding the school, ZIP code 75206, has a population of about 38,795 according to U.S. Census ACS 2023 five-year estimates. The median household income in the area is $88,464, and the median owner-occupied home value is $557,500. Housing in the area is predominantly renter-occupied. Dallas County unemployment rate was 3 percent in August 2026, lower than a year earlier.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75206 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

Mockingbird Elementry School is a Renovation/Alteration project located at 5828 Mockingbird Lane, Dallas, TX 75206 in Dallas, Texas. The project has an estimated value of $2.5M covering 76,938 sq ft. Dallas Independant School District is the property owner and Kline Hardin Architects is the design firm of record. The project was registered with TDLR on October 30, 2024.

Frequently Asked Questions

What was the scope of the renovation at Mockingbird Elementary School?

The project included minor interior renovations for a new secure entry vestibule and staff lounge. The main entrance was moved to the East side, requiring replacement of the existing sidewalk and ramp.

Who is the owner of Mockingbird Elementary School?

Dallas Independent School District is the owner of record for the building at 5828 Mockingbird Lane in Dallas, Texas.

When did the construction for the renovation end?

The project passed its final TDLR accessibility inspection in April 2026, indicating that the construction work was complete at that time.

What is the estimated cost of the renovation?

The estimated cost for the renovation/alteration project was $2,473,340, which is above the median cost for similar projects in Dallas County.

Is the school open for business?

The TDLR record confirms the construction is complete and the final inspection passed in April 2026. It does not provide information on the school's operational status or opening hours.

What is Mockingbird Elementry School?

Mockingbird Elementry School is a renovation/alteration project at 5828 Mockingbird Lane in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The Project includes minor interior renovations to provide a new secure entry vestibule and provide a new staff lounge. The main entrance to the building will be moved to the East entrance where the existing sidewalk and ramp will be rep…

Is Mockingbird Elementry School open in Dallas?

Construction on Mockingbird Elementry School is complete — TDLR records show the project passed its required accessibility inspection in Nov 2026. The building is finished and very likely open.

Where is Mockingbird Elementry School located?

Mockingbird Elementry School is located at 5828 Mockingbird Lane, Dallas, TX, 75206, in Dallas County.

Who is the owner or developer of Mockingbird Elementry School?

Dallas Independant School District is the property owner/developer of record for Mockingbird Elementry School, per its TDLR project registration.

Who is the architect or design firm for Mockingbird Elementry School?

Kline Hardin Architects is the design firm of record for Mockingbird Elementry School, according to its TDLR filing.

How much does Mockingbird Elementry School cost and how big is it?

Mockingbird Elementry School has an estimated construction value of $2.5M and approximately 76,938 square feet (about $32/sqft), based on its TDLR filing.

Scope of Work

The Project includes minor interior renovations to provide a new secure entry vestibule and provide a new staff lounge. The main entrance to the building will be moved to the East entrance where the existing sidewalk and ramp will be replaced. A po

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

5828 Mockingbird Lane, Dallas, TX, 75206

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75206 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.