Crownover Middle School 2025 Summer Project in Corinth, TX
1901 Creekside Dr, Corinth, TX, 76210
Crownover Middle School 2025 Summer Project is a renovation/alteration project at 1901 Creekside Dr, Corinth, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $6.2M across about 121,595 sq ft.
- Estimated project value
- $6.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 121,595 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $51/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 29 days
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
265 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
29 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Crownover Middle School 2025 Summer Project
Crownover Middle School at 1901 Creekside Dr in Corinth is the subject of a $6,247,558 renovation filed with the Texas Department of Licensing and Regulation. The project, registered in November 2024, targets the existing 121,595 sq ft facility for significant structural and mechanical updates. Denton Independent School District is the owner of record, with Corgan Associates, Inc. serving as the design firm.
The scope of work includes replacing the roof and HVAC controls, securing the vestibule, and renovating the fine arts wing. Specific tasks involve extending the stage, finishing the front drop, covering the floor with masonite, and replacing curtains. These alterations aim to modernize the school's infrastructure and performance spaces.
Project Status and Timeline
The filing lists a construction start of July 2025 and a completion date of August 2025. This scheduled build window of 29 days is shorter than the county median of 92 days for similar renovation projects. However, no plan review or inspection has been recorded since registration. Therefore, whether the work actually proceeded as scheduled is not confirmed in the public record.
Denton County renovation filings show a median estimated cost of $237,622. This project's cost is above the county median for its type, placing it in the top quarter of similar filings. The estimated cost per square foot is $51, which is below the county median of $81 per sq ft for renovation and alteration projects.
Denton Independent School District has six other TDLR-registered projects totaling $22,255,801, including work at Pecan Creek Elementary School and McMath Middle School. Corgan Associates, Inc. has six other registered projects totaling $138,875,000, including major work at DFW Terminal C. The project involves public funds and public land, consistent with its status as a school district facility.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76210 (Corinth)
One email per change. Unsubscribe in one click. Privacy.
Crownover Middle School 2025 Summer Project is a Renovation/Alteration project located at 1901 Creekside Dr, Corinth, TX 76210 in Corinth, Texas. The project has an estimated value of $6.2M covering 121,595 sq ft. Denton Independent School District is the property owner and Corgan Associates, Inc. is the design firm of record. The project was registered with TDLR on November 8, 2024.
Frequently Asked Questions
Who is renovating Crownover Middle School?
Denton Independent School District is the owner of record. Corgan Associates, Inc. is the design firm of record for the renovation project filed with TDLR.
What is the scope of the Crownover Middle School renovation?
The work includes replacing the roof and HVAC controls, securing the vestibule, and renovating the fine arts wing with stage extensions and new flooring.
Is the Crownover Middle School renovation complete?
The filing listed an August 2025 completion date. However, no plan review or inspection has been recorded, so completion is not confirmed in the public record.
How much does the Crownover Middle School renovation cost?
The estimated cost for the 121,595 sq ft renovation is $6,247,558. This places the project above the Denton County median cost for similar renovation filings.
Where is Crownover Middle School located?
The school is located at 1901 Creekside Dr, Corinth, TX 76210, in Denton County.
What is Crownover Middle School 2025 Summer Project?
Crownover Middle School 2025 Summer Project is a renovation/alteration project at 1901 Creekside Dr in Corinth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of existing 121,595 SF elementary school. Replace roof, replace HVAC controls, Secure Vestibule, fine arts renovation: extend stage, finish front drop, cover floor w/ masonite and replace curtains
Is Crownover Middle School 2025 Summer Project open in Corinth?
Crownover Middle School 2025 Summer Project was scheduled to finish construction in Aug 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Crownover Middle School 2025 Summer Project located?
Crownover Middle School 2025 Summer Project is located at 1901 Creekside Dr, Corinth, TX, 76210, in Denton County.
Who is the owner or developer of Crownover Middle School 2025 Summer Project?
Denton Independent School District is the property owner/developer of record for Crownover Middle School 2025 Summer Project, per its TDLR project registration.
Who is the architect or design firm for Crownover Middle School 2025 Summer Project?
Corgan Associates, Inc. is the design firm of record for Crownover Middle School 2025 Summer Project, according to its TDLR filing.
How much does Crownover Middle School 2025 Summer Project cost and how big is it?
Crownover Middle School 2025 Summer Project has an estimated construction value of $6.2M and approximately 121,595 square feet (about $51/sqft), based on its TDLR filing.
Scope of Work
Renovation of existing 121,595 SF elementary school. Replace roof, replace HVAC controls, Secure Vestibule, fine arts renovation: extend stage, finish front drop, cover floor w/ masonite and replace curtains
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1901 Creekside Dr, Corinth, TX, 76210
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$1.30B totalWatch all construction in 76210 (Corinth)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Corinth?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.