Project intelligenceTDLR TABS2025005578New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

FM 3391 (CSJ: 3372-01-010) in Burleson, TX

From: IH 35W TO: East of CR 602, Burleson, TX, 76028

Opening ~Jun 2030Review Complete

FM 3391 (CSJ: 3372-01-010) is a new construction project at From: IH 35W TO: East of CR 602, Burleson, in Johnson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2030. The project has an estimated value of $80.6M across about 201,653 sq ft.

Estimated project value
$80.6M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
201,653 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$400/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 5mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 14, 20242,042 days across supplied datesJun 18, 2030

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    1,177 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    865 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About FM 3391 (CSJ: 3372-01-010)

TxDOT District: Fort Worth is preparing to widen Farm to Market Road 3391 in Burleson, a project estimated at $80,585,878. The construction involves expanding the roadway from two to six lanes between Interstate 35 West and South Hurst Avenue, and from two to four lanes between South Hurst Avenue and County Road 602. The total project length is 2.83 miles, with a recorded area of 201,653 square feet.

Project Scope and Timeline

The filing identifies the work as new construction with a specific scope: widening the existing two-lane road to accommodate increased traffic volume. The project is registered with TDLR under the name FM 3391 (Csj: 3372-01-010). Plan review was completed in November 2024, and the TDLR status is Review Complete. Construction is scheduled to begin in February 2028 and is scheduled to finish in June 2030. This build window spans approximately 865 days, which is longer than the 220-day median for similar new construction filings in Johnson County.

Kimley-Horn serves as the design firm of record for this infrastructure improvement. The project utilizes public funds and involves public land, consistent with Federally funded roadway projects. The estimated cost per square foot is $400, a figure above the $132 per square foot median for new construction projects in the county.

Burleson is situated in Johnson County, a region with a population of about 78,699 according to U.S. Census ACS 2023 five-year estimates for ZIP 76028. The median household income in this area is $100,125, and the median owner-occupied home value is $294,500. Housing in the area is predominantly owner-occupied, with approximately 27,928 housing units. The Johnson County unemployment rate was 4.1 percent in August 2026, lower than a year earlier.

TxDOT District: Fort Worth has six other TDLR-registered projects totaling $3,529,565, all located in Fort Worth. Kimley-Horn has six other TDLR-registered projects totaling $166,910,286 across various Texas locations, including Plano, Argyle, El Paso, Taylor, and Terrell. Nearby registered projects in the same area include Elliott Electric Supply, MCD Lonestar & 287, and Costco Wholesale Warehouse, all classified as new construction.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76028 (Burleson)

One email per change. Unsubscribe in one click. Privacy.

FM 3391 (CSJ: 3372-01-010) is a New Construction project located at From: IH 35W TO: East of CR 602, Burleson, TX 76028 in Burleson, Texas. The project has an estimated value of $80.6M covering 201,653 sq ft. TxDOT District: Fort Worth is the property owner and Kimley-Horn is the design firm of record. The project was registered with TDLR on November 14, 2024.

Frequently Asked Questions

When will construction start and finish?

Construction is scheduled to start in February 2028 and is scheduled to finish in June 2030, following the completion of plan review in November 2024.

Who is the owner of this project?

The owner of record for this TDLR-registered project is TxDOT District: Fort Worth, which is also responsible for the overall management of the widening effort.

What is the estimated cost of the widening?

The estimated cost for the 2.83-mile widening of FM 3391 in Burleson is $80,585,878, which is above the county median for similar new construction filings.

What is FM 3391 (CSJ: 3372-01-010)?

FM 3391 (CSJ: 3372-01-010) is a new construction project at From: IH 35W TO: East of CR 602 in Burleson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 2.83 miles on FM 3391 widening IH 35 W to S. Hurst Ave. from 2 to 6 lanes and from S. Hurst Ave. to CR 602 widen from 2 to 4 lanes.

Is FM 3391 (CSJ: 3372-01-010) open in Burleson?

FM 3391 (CSJ: 3372-01-010) is still under construction in Burleson, TX, with an estimated completion of Jun 2030 according to its TDLR registration.

Where is FM 3391 (CSJ: 3372-01-010) located?

FM 3391 (CSJ: 3372-01-010) is located at From: IH 35W TO: East of CR 602, Burleson, TX, 76028, in Johnson County.

Who is the owner or developer of FM 3391 (CSJ: 3372-01-010)?

TxDOT District: Fort Worth is the property owner/developer of record for FM 3391 (CSJ: 3372-01-010), per its TDLR project registration.

Who is the architect or design firm for FM 3391 (CSJ: 3372-01-010)?

Kimley-Horn is the design firm of record for FM 3391 (CSJ: 3372-01-010), according to its TDLR filing.

How much does FM 3391 (CSJ: 3372-01-010) cost and how big is it?

FM 3391 (CSJ: 3372-01-010) has an estimated construction value of $80.6M and approximately 201,653 square feet (about $400/sqft), based on its TDLR filing.

Scope of Work

2.83 miles on FM 3391 widening IH 35 W to S. Hurst Ave. from 2 to 6 lanes and from S. Hurst Ave. to CR 602 widen from 2 to 4 lanes.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

From: IH 35W TO: East of CR 602, Burleson, TX, 76028

Loading location map…
32.37661, -97.35686

Watch all construction in 76028 (Burleson)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Burleson?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.