Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Greenwood ISD - New Elementary in Midland, TX
2700 FM 1379, Midland, TX, 79706
Greenwood ISD - New Elementary is a new construction project at 2700 FM 1379, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $123.0M across about 281,000 sq ft.
- Estimated project value
- $123.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 281,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $438/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 10mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
62 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
654 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Greenwood ISD - New Elementary
Greenwood ISD is constructing a new elementary school at 2700 FM 1379 in Midland, Texas. The filing lists the project as Greenwood ISD - New Elementary. The scope includes basic site development for a total of 136,455sf, though the estimated square footage is 281,000 sq ft. The project is adjacent to an intermediate campus. Parkhill serves as the design firm of record. Stephen D Macphie is the registered accessibility specialist. The estimated cost is $123,000,000.
Project Timeline and Status
TDLR completed plan review in November 2024 and construction is scheduled to finish in October 2026, with work starting January 2025. The TDLR status is Review Complete. This project involves public funds, public land, or is a Federally funded roadway project. The owner/developer of record is Greenwood ISD. The registered accessibility specialist filed in November 2024.
Cost and Scale
The cost per sq ft is $438. This figure is above the county median of $169. The scheduled build window of 654 days is longer than the county median of 243 days. The cost is above the county median for its type (in the top quarter). Greenwood ISD has four other TDLR-registered projects totaling $167,000,000. These include Greenwood High School additions and other new construction projects in Midland.
Parkhill has six other TDLR-registered projects totaling $15,590,000. These include work in Coppell, Mexia, Fort Worth, and Lubbock. Other registered projects in the same area include Greenwood High School additions and a multipurpose facility. Businesses near this site include Heavenly Hair By Carmen, Greenwood Baptist Church, J. M. King Memorial Stadium, ALON Gas Station, Greenwood Internet Service, and Natty Gas Lab. The U.S. Census ACS 2023 five-year estimates for ZIP 79706 show a population about 32,605. The median household income is $110,988. There are 12,368 housing units. The median owner-occupied home value is $280,500. Housing is predominantly owner-occupied.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79706 (Midland)
One email per change. Unsubscribe in one click. Privacy.
Greenwood ISD - New Elementary is a New Construction project located at 2700 FM 1379, Midland, TX 79706 in Midland, Texas. The project has an estimated value of $123.0M covering 281,000 sq ft. Greenwood ISD is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on November 14, 2024.
Frequently Asked Questions
What is the address of the Greenwood ISD new elementary school?
The project is located at 2700 FM 1379, Midland, TX 79706. It is situated adjacent to the existing intermediate campus in Midland County.
Who is the design firm for this project?
Parkhill is the design firm of record for the Greenwood ISD new elementary school project in Midland.
When does construction start and finish?
Construction is scheduled to finish in October 2026, with work starting January 2025. Plan review was completed in November 2024.
What is the estimated cost of the project?
The estimated cost is $123,000,000. The square footage is 281,000 sq ft, resulting in a cost per sq ft of $438.
Is the school open for students yet?
The TDLR record covers construction only and does not record whether the business has started serving customers. The project is scheduled to finish in October 2026.
What is Greenwood ISD - New Elementary?
Greenwood ISD - New Elementary is a new construction project at 2700 FM 1379 in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New elementary school on a new site, adjacent to intermediate; basic site development. total of 136,455sf
Is Greenwood ISD - New Elementary open in Midland?
Greenwood ISD - New Elementary was scheduled to finish construction in Oct 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Greenwood ISD - New Elementary located?
Greenwood ISD - New Elementary is located at 2700 FM 1379, Midland, TX, 79706, in Midland County.
Who is the owner or developer of Greenwood ISD - New Elementary?
Greenwood ISD is the property owner/developer of record for Greenwood ISD - New Elementary, per its TDLR project registration.
Who is the architect or design firm for Greenwood ISD - New Elementary?
Parkhill is the design firm of record for Greenwood ISD - New Elementary, according to its TDLR filing.
How much does Greenwood ISD - New Elementary cost and how big is it?
Greenwood ISD - New Elementary has an estimated construction value of $123.0M and approximately 281,000 square feet (about $438/sqft), based on its TDLR filing.
Scope of Work
New elementary school on a new site, adjacent to intermediate; basic site development. total of 136,455sf
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2700 FM 1379, Midland, TX, 79706
Related Projects
Same Owner
$306.6M totalNearby Projects
Within 0.6 miWatch all construction in 79706 (Midland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Midland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.