Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Greenwood ISD - Student Special Events Center in Midland, TX
2700 FM 1379, Midland, TX, 79706
Greenwood ISD - Student Special Events Center is a additions to existing building project at 2700 FM 1379, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $65.2M across about 145,000 sq ft.
- Estimated project value
- $65.2M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 145,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $450/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 10mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
67 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
660 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Greenwood ISD - Student Special Events Center
Greenwood ISD is constructing a 145,000-square-foot addition to Greenwood High School at 2700 FM 1379 in Midland. The project, filed as the Student Special Events Center, includes a new competition gymnasium and a new auditorium that share a public lobby for pre-function gatherings and presentations. With an estimated cost of $65,200,000, the build is scheduled to finish in August 2027, with construction starting in October 2025.
The scope of work is classified as additions to an existing building. TDLR completed plan review in August 2025, and the status is marked as Review Complete. The registered accessibility specialist for this filing is Stephen D Macphie. Parkhill, with Aaron Rivera listed as a contact, is the design firm of record. The project involves public funds and public land.
Scale and Cost Context
This project is significantly larger and more expensive than typical additions in the area. Among 157 TDLR-registered additions to existing buildings in Midland County, the median estimated cost is $496,000, and the median size is 5,000 square feet. This project’s cost is in the top quarter for its type, and its $450 per square foot cost is above the county median of $133. The scheduled build window of 660 days is longer than the county median of 227 days.
Greenwood ISD has four other TDLR-registered projects in Midland, totaling $224,800,000. These include other additions to Greenwood High School and new construction projects. Nearby businesses include Heavenly Hair By Carmen, Greenwood Baptist Church, and J. M. King Memorial Stadium. According to U.S. Census ACS 2023 estimates for ZIP code 79706, the population is about 32,605, with a median household income of $110,988.
US News ranks Greenwood High School 1,031st within Texas, noting that students have the opportunity to take Advanced Placement coursework. The school is a public, co-educational 9-12 secondary school in the Greenwood area. Midland County’s unemployment rate was 3.4 percent in July 2026, according to FRED data.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79706 (Midland)
One email per change. Unsubscribe in one click. Privacy.
Greenwood ISD - Student Special Events Center is a Additions to Existing Building project located at 2700 FM 1379 in Midland, Texas. The project has an estimated value of $65.2M covering 145,000 sq ft. Greenwood ISD is the property owner and Parkhill (Aaron Rivera)EY is the design firm of record. The project was registered with TDLR on August 4, 2025.
Frequently Asked Questions
What is being built at Greenwood High School in Midland?
The project adds a new competition gymnasium and a new auditorium to the existing school building. These two functions will share a public lobby space for pre-function gathering and presentations.
When is the construction scheduled to finish?
Construction is scheduled to finish in August 2027. Work is set to start in October 2025, following the completion of plan review in August 2025.
Who is the owner and design firm for this project?
The owner of record is Greenwood ISD. The design firm of record is Parkhill, with Aaron Rivera listed as a contact. The registered accessibility specialist is Stephen D Macphie.
How much does this project cost and how large is it?
The estimated cost is $65,200,000 for 145,000 square feet of new space. This works out to approximately $450 per square foot, which is above the median for similar projects in Midland County.
Is the new gymnasium open to the public?
The project is under construction with a completion date in August 2027. The TDLR record only tracks construction status, so specific opening dates for public use are not listed in the filing.
What is Greenwood ISD - Student Special Events Center?
Greenwood ISD - Student Special Events Center is a additions to existing building project at 2700 FM 1379 in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project will consist of new competition gymnasium and new auditorium. The two functions will share a public lobby space for pre-function gathering and presentations.
Is Greenwood ISD - Student Special Events Center open in Midland?
Greenwood ISD - Student Special Events Center is still under construction in Midland, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Where is Greenwood ISD - Student Special Events Center located?
Greenwood ISD - Student Special Events Center is located at 2700 FM 1379, Midland, TX, 79706, in Midland County.
Who is the owner or developer of Greenwood ISD - Student Special Events Center?
Greenwood ISD is the property owner/developer of record for Greenwood ISD - Student Special Events Center, per its TDLR project registration.
Who is the architect or design firm for Greenwood ISD - Student Special Events Center?
Parkhill (Aaron Rivera)EY is the design firm of record for Greenwood ISD - Student Special Events Center, according to its TDLR filing.
How much does Greenwood ISD - Student Special Events Center cost and how big is it?
Greenwood ISD - Student Special Events Center has an estimated construction value of $65.2M and approximately 145,000 square feet (about $450/sqft), based on its TDLR filing.
Scope of Work
Project will consist of new competition gymnasium and new auditorium. The two functions will share a public lobby space for pre-function gathering and presentations.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2700 FM 1379, Midland, TX, 79706
Related Projects
Nearby Projects
Within 0.6 miWatch all construction in 79706 (Midland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Midland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.