Project intelligenceTDLR TABS2025012943Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Greenwood High School CTE and Additionals & Renovations Phase 1 in Midland, TX

2700 FM 1379, Midland, TX, 79706

Construction complete · Oct 2026Inspection Complete

Greenwood High School CTE and Additionals & Renovations Phase 1 is a additions to existing building project at 2700 FM 1379, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $15.8M across about 34,500 sq ft.

Estimated project value
$15.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
34,500 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$458/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 6mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 27, 2025584 days across supplied datesOct 4, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    550 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About Greenwood High School CTE and Additionals & Renovations Phase 1

Project Overview and Scope

Greenwood High School in Midland, Texas, completed a significant expansion and renovation project at 2700 FM 1379. The filing, titled Greenwood High School CTE and Additionals & Renovations Phase 1, describes the work as additions to an existing building. The project involved constructing a 30,000 sq ft addition for Career and Technical Education (CTE) spaces and renovating approximately 4,500 sq ft of interior space for a Lifeskills area. The total square footage associated with this TDLR registration is 34,500 sq ft.

The estimated cost for this phase was $15,800,000, resulting in a computed cost of $458 per square foot. Greenwood ISD is the owner of record for this project. The design firm listed in the filings is Parkhill(Austin Moore)cg. The registered accessibility specialist for the project was Stephen D Macphie. The project utilized public funds and public land.

Timeline and Status

The project was registered with TDLR in February 2025, and plan review was completed in the same month. Construction began in April 2025. The scheduled completion date on the filing was October 2026. The building passed its final TDLR accessibility inspection in October 2026, confirming that construction is complete. The TDLR status is now listed as Inspection Complete.

The scheduled build window for this project was 550 days. This duration is longer than the county median of 227 days for similar additions to existing buildings in Midland County. The estimated cost of $15,800,000 is above the county median for this type of work, placing it in the top quarter of registered filings in the area over the last 24 months. The cost per square foot of $458 is also above the county median of $133.

Greenwood ISD has four other TDLR-registered projects in Midland, totaling $274,200,000. These include other phases of Greenwood High School and new construction projects. The site is located in ZIP code 79706, where the U.S. Census estimates the population at about 32,605 and the median household income at $110,988. Local landmarks near the site include J. M. King Memorial Stadium and Greenwood Baptist Church.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79706 (Midland)

One email per change. Unsubscribe in one click. Privacy.

Greenwood High School CTE and Additionals & Renovations Phase 1 is a Additions to Existing Building project located at 2700 FM 1379, Midland, TX 79706 in Midland, Texas. The project has an estimated value of $15.8M covering 34,500 sq ft. Greenwood ISD is the property owner and Parkhill(Austin Moore)cg is the design firm of record. The project was registered with TDLR on February 27, 2025.

Frequently Asked Questions

Is Greenwood High School open?

The construction project passed its final TDLR accessibility inspection in October 2026, indicating construction is complete. The TDLR record confirms the building is finished, but does not specify daily operational hours or current business status.

What is the address of the project?

The project is located at 2700 FM 1379, Midland, TX 79706, in Midland County. This is the site of Greenwood High School.

Who is the owner of the project?

Greenwood ISD is the owner of record for this project. The design firm of record is Parkhill(Austin Moore)cg.

What was the estimated cost?

The estimated cost for the project was $15,800,000. This figure is above the county median for similar additions to existing buildings in Midland County.

When was the project completed?

Construction was scheduled to be completed in October 2026. The final TDLR accessibility inspection was passed in October 2026, marking the completion of the work.

What is Greenwood High School CTE and Additionals & Renovations Phase 1?

Greenwood High School CTE and Additionals & Renovations Phase 1 is a additions to existing building project at 2700 FM 1379 in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Project consists of a 30,000 s.f addition for CTE spaces and interior renovation of approximately 4,500 s.f. for Lifeskills area.

Is Greenwood High School CTE and Additionals & Renovations Phase 1 open in Midland?

Construction on Greenwood High School CTE and Additionals & Renovations Phase 1 is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is Greenwood High School CTE and Additionals & Renovations Phase 1 located?

Greenwood High School CTE and Additionals & Renovations Phase 1 is located at 2700 FM 1379, Midland, TX, 79706, in Midland County.

Who is the owner or developer of Greenwood High School CTE and Additionals & Renovations Phase 1?

Greenwood ISD is the property owner/developer of record for Greenwood High School CTE and Additionals & Renovations Phase 1, per its TDLR project registration.

Who is the architect or design firm for Greenwood High School CTE and Additionals & Renovations Phase 1?

Parkhill(Austin Moore)cg is the design firm of record for Greenwood High School CTE and Additionals & Renovations Phase 1, according to its TDLR filing.

How much does Greenwood High School CTE and Additionals & Renovations Phase 1 cost and how big is it?

Greenwood High School CTE and Additionals & Renovations Phase 1 has an estimated construction value of $15.8M and approximately 34,500 square feet (about $458/sqft), based on its TDLR filing.

Scope of Work

Project consists of a 30,000 s.f addition for CTE spaces and interior renovation of approximately 4,500 s.f. for Lifeskills area.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2700 FM 1379, Midland, TX, 79706

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.