Project intelligenceTDLR TABS2025006266Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018 in Houston, TX

East of Crosby Freeway and North of Wallisville Rd, Houston, TX, 77049

Opening ~Feb 2027Review Complete

Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018 is a renovation/alteration project at East of Crosby Freeway and North of Wallisville Rd, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2027. The project has an estimated value of $2.7M across about 3,600 sq ft.

Estimated project value
$2.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,600 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$760/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 1mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 22, 2024801 days across supplied datesFeb 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    45 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    756 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018

Harris County is leading a renovation project in the Pine Trails Subdivision, located east of Crosby Freeway and north of Wallisville Road in Houston. The filing identifies the work as drainage improvements for Sections 1, 2, 5, and 6, with an estimated cost of $2,735,900. The scope covers approximately 36,000 square feet of sidewalk and over 200 ramps, a scale that significantly exceeds the county median for similar renovation filings.

The project is registered with TDLR under the name Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018. CobbFendley serves as the design firm of record, while Jeromy G Murphy is the registered accessibility specialist. The TDLR status is Review Complete, indicating that plan review finished in November 2024. Construction is scheduled to finish in February 2027, with work starting in January 2025.

Project Scale and Cost

At $2,735,900, this project sits in the top quarter of estimated costs for renovation and alteration filings in Harris County. The median estimated cost for these projects is $250,000, with the middle half ranging from $126,000 to $600,000. The project’s $760 per square foot is above the county median of $80 per square foot for this work type. This reflects the specialized nature of the drainage and accessibility improvements required for the subdivision infrastructure.

The scheduled build window is 756 days, which is longer than the county median of 92 days for similar projects. This extended timeline allows for the detailed construction of the extensive sidewalk network and ramp installations. The use of public funds and public land underscores the project’s importance to community infrastructure in the Houston area.

Local Context and Ownership

Harris County has six other TDLR-registered projects totaling $36,259,820, including 1019 Congress Plaza and Gloger Street. CobbFendley has designed six other projects totaling $15,126,525, such as the Spencerview Pedestrian Bridge in Deer Park. The project is situated in ZIP code 77049, where the U.S. Census estimates a population of about 40,373 and a median household income of $70,514. The area is mostly owner-occupied, with a median home value of $207,900.

This project represents a significant investment in accessibility and drainage for the Pine Trails Subdivision. The combination of a large scope, high cost, and extended timeline highlights the complexity of the work. The TDLR registration ensures that the project meets state accessibility standards, providing a clear record of its progress and completion.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77049 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018 is a Renovation/Alteration project located at East of Crosby Freeway and North of Wallisville Rd, Houston, TX 77049 in Houston, Texas. The project has an estimated value of $2.7M covering 3,600 sq ft. Harris County is the property owner and CobbFendley is the design firm of record. The project was registered with TDLR on November 22, 2024.

Frequently Asked Questions

What is the estimated cost of the Pine Trails Subdivision project?

The estimated cost is $2,735,900. This figure is above the Harris County median for renovation and alteration projects, which is $250,000.

When is the construction scheduled to finish?

Construction is scheduled to finish in February 2027. Work started in January 2025, following the completion of plan review in November 2024.

Who is the owner of the Pine Trails Subdivision project?

Harris County is the owner of record. The project involves public funds and public land, reflecting its status as a county-led infrastructure improvement.

What is the scope of work for this project?

The scope includes approximately 36,000 square feet of sidewalk and over 200 ramps. This work is part of drainage improvements for Sections 1, 2, 5, and 6 of the subdivision.

Is the project currently open to the public?

The project is under construction and is scheduled to finish in February 2027. It is not an operating business, so it is not open for public use during the construction phase.

What is Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018?

Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018 is a renovation/alteration project at East of Crosby Freeway and North of Wallisville Rd in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Approximately 36,000 SF of sidewalk and over 200 ramps.

Is Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018 open in Houston?

Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018 is still under construction in Houston, TX, with an estimated completion of Feb 2027 according to its TDLR registration.

Where is Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018 located?

Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018 is located at East of Crosby Freeway and North of Wallisville Rd, Houston, TX, 77049, in Harris County.

Who is the owner or developer of Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018?

Harris County is the property owner/developer of record for Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018, per its TDLR project registration.

Who is the architect or design firm for Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018?

CobbFendley is the design firm of record for Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018, according to its TDLR filing.

How much does Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018 cost and how big is it?

Pine Trails Subdivision Drainage Improvements (Sections 1-2-5-6) - 2018 has an estimated construction value of $2.7M and approximately 3,600 square feet (about $760/sqft), based on its TDLR filing.

Scope of Work

Approximately 36,000 SF of sidewalk and over 200 ramps.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

East of Crosby Freeway and North of Wallisville Rd, Houston, TX, 77049

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.