Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Andress HS Campus Vestibules Region 1 and 2 in El Paso, TX
5400 Sun Valley Dr., El Paso, TX, 79924
Andress HS Campus Vestibules Region 1 and 2 is a renovation/alteration project at 5400 Sun Valley Dr., El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $131K across about 524 sq ft.
- Estimated project value
- $131K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 524 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $250/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
48 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
172 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Andress HS Campus Vestibules Region 1 and 2
El Paso Independent School District is renovating Andress High School at 5400 Sun Valley Dr., El Paso, to install new secure entrance vestibules for Regions 1 and 2. The project, registered with the Texas Department of Licensing and Regulation (TDLR) in January 2025, includes the renovation of reception and office areas within a total scope of 524 square feet.
Project Scope and Cost
The estimated cost for this renovation and alteration is $131,000, which computes to $250 per square foot. This figure is above the county median of $66 per square foot for similar TDLR-registered renovation and alteration filings in El Paso County. The total project cost is below the county median of $204,000 for this work type. ASA Architects, P.C. serves as the design firm of record, while Tommy Fan is the registered accessibility specialist associated with the filing.
Construction was scheduled to begin in March 2025, with a planned completion date of August 2025. The scheduled build window of 172 days is longer than the county median of 120 days for comparable projects. The project involves public funds and public land. TDLR completed the plan review in January 2025, marking the start of the construction phase according to the public record.
Current Status and Context
Although the scheduled completion date of August 2025 has passed, TDLR has not yet recorded a final inspection. Therefore, the current state of the site is not confirmed in the public record. The status is listed as Review Complete, indicating that the regulatory review phase is finished, but the final inspection step required to close the project file has not been logged.
El Paso Independent School District has six other TDLR-registered projects totaling $16,321,000, including work at El Paso High School and Coronado High School. ASA Architects, P.C. has six other registered projects totaling $17,357,305, with recent work in El Paso and Van Horn. Other registered projects in the immediate area include Charles Middle School and Harmony School of Innovation Elementary, reflecting a broader pattern of educational infrastructure updates in the Sun Valley neighborhood.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79924 (El Paso)
One email per change. Unsubscribe in one click. Privacy.
Andress HS Campus Vestibules Region 1 and 2 is a Renovation/Alteration project located at 5400 Sun Valley Dr., El Paso, TX 79924 in El Paso, Texas. The project has an estimated value of $131K covering 524 sq ft. El Paso Independent School District is the property owner and ASA Architects, P.C. is the design firm of record. The project was registered with TDLR on January 14, 2025.
Frequently Asked Questions
Is Andress High School renovation finished?
TDLR has not yet recorded a final inspection. While the scheduled completion date was August 2025, the public record does not confirm the final state of the site.
Who is building the new vestibules at Andress High School?
El Paso Independent School District is the owner of record. ASA Architects, P.C. is the design firm, and Tommy Fan is the registered accessibility specialist.
What is the estimated cost of the Andress High School project?
The estimated cost is $131,000. This is below the El Paso County median for renovation projects but has a higher cost per square foot than the county median.
What work is being done at 5400 Sun Valley Dr.?
The scope includes new entrance secure vestibules for Regions 1 and 2, along with renovation of the reception and office areas.
When did the Andress High School project start?
Construction was scheduled to start in March 2025. TDLR completed the plan review in January 2025.
What is Andress HS Campus Vestibules Region 1 and 2?
Andress HS Campus Vestibules Region 1 and 2 is a renovation/alteration project at 5400 Sun Valley Dr. in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New entrance secure vestibules including Reception and office area renovation.
Is Andress HS Campus Vestibules Region 1 and 2 open in El Paso?
Andress HS Campus Vestibules Region 1 and 2 was scheduled to finish construction in Aug 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Andress HS Campus Vestibules Region 1 and 2 located?
Andress HS Campus Vestibules Region 1 and 2 is located at 5400 Sun Valley Dr., El Paso, TX, 79924, in El Paso County.
Who is the owner or developer of Andress HS Campus Vestibules Region 1 and 2?
El Paso Independent School District is the property owner/developer of record for Andress HS Campus Vestibules Region 1 and 2, per its TDLR project registration.
Who is the architect or design firm for Andress HS Campus Vestibules Region 1 and 2?
ASA Architects, P.C. is the design firm of record for Andress HS Campus Vestibules Region 1 and 2, according to its TDLR filing.
How much does Andress HS Campus Vestibules Region 1 and 2 cost and how big is it?
Andress HS Campus Vestibules Region 1 and 2 has an estimated construction value of $131K and approximately 524 square feet (about $250/sqft), based on its TDLR filing.
Scope of Work
New entrance secure vestibules including Reception and office area renovation.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
5400 Sun Valley Dr., El Paso, TX, 79924
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$509.7M totalWatch all construction in 79924 (El Paso)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in El Paso?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.