Project intelligenceTDLR TABS2025011236New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

MISD Alamo Junior High School Weight Room

3800 W. Storey Ave, Midland, TX, 79703

Construction complete · Jun 2026Inspection Complete

MISD Alamo Junior High School Weight Room is a new construction project at 3800 W. Storey Ave, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $1.0M across about 4,000 sq ft.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
4,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$260/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Feb 6, 2025507 days across supplied datesJun 28, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    25 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    162 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    320 days after the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79703 (Midland)

One email per change. Unsubscribe in one click. Privacy.

MISD Alamo Junior High School Weight Room is a New Construction project located at 3800 W. Storey Ave, Midland, TX 79703 in Midland, Texas. The project has an estimated value of $1.0M covering 4,000 sq ft. Midland Independent School District is the property owner and MWM Architects is the design firm of record. The project was registered with TDLR on February 6, 2025.

Frequently Asked Questions

What is MISD Alamo Junior High School Weight Room?

MISD Alamo Junior High School Weight Room is a new construction project at 3800 W. Storey Ave in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Stand-alone weight room facility of 4,000sf. Pre-Engineered Metal Building

Is MISD Alamo Junior High School Weight Room open in Midland?

Construction on MISD Alamo Junior High School Weight Room is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is MISD Alamo Junior High School Weight Room located?

MISD Alamo Junior High School Weight Room is located at 3800 W. Storey Ave, Midland, TX, 79703, in Midland County.

Who is the owner or developer of MISD Alamo Junior High School Weight Room?

Midland Independent School District is the property owner/developer of record for MISD Alamo Junior High School Weight Room, per its TDLR project registration.

Who is the architect or design firm for MISD Alamo Junior High School Weight Room?

MWM Architects is the design firm of record for MISD Alamo Junior High School Weight Room, according to its TDLR filing.

How much does MISD Alamo Junior High School Weight Room cost and how big is it?

MISD Alamo Junior High School Weight Room has an estimated construction value of $1.0M and approximately 4,000 square feet (about $260/sqft), based on its TDLR filing.

Scope of Work

Stand-alone weight room facility of 4,000sf. Pre-Engineered Metal Building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3800 W. Storey Ave, Midland, TX, 79703

Location by street address

Watch all construction in 79703 (Midland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.