Funding type
This project is privately funded, on private land for private use.
New Warehouse Building in Pittsburg, TX
110 Dickson Street, Pittsburg, TX, 45686
New Warehouse Building is a new construction project at 110 Dickson Street, Pittsburg, in Camp County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $954K across about 10,600 sq ft.
- Estimated project value
- $954K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 10,600 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $90/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 10 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
28 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
312 days after the preceding date shown.
Source: TDLR filing
View source record
📰About New Warehouse Building
Andritz Separation Inc. filed plans in February 2025 for a new 10,600-square-foot storage warehouse at 110 Dickson Street in Pittsburg. The project, registered with TDLR as a new construction effort, is estimated to cost $954,000. This facility is privately funded and located on private land for private use.
The design firm of record is Johnson & Pace Incorporated, while Misti Casandra Cunningham serves as the registered accessibility specialist. TDLR completed the plan review process in February 2025. The filing indicates construction was scheduled to begin in March 2025, with a completion date of January 2026. Although that scheduled end date has passed, the public record has not yet recorded a final inspection, meaning the current state of the site is not confirmed in the official database.
Project Cost and Scope
The estimated cost of $954,000 places this project above the median estimated cost of $750,000 for new construction filings in Camp County. The calculated cost per square foot is $90, which is below the county median of $151 per square foot. The scheduled build window of 312 days is close to the county median of 274 days for similar projects. The scope is strictly limited to a new storage warehouse, with no mention of retail or public-facing amenities in the filing.
Design Firm Context
Johnson & Pace Incorporated has registered six other projects with TDLR, totaling $14,450,000. These include the Marshall High School project in Marshall and facility renovations in Longview. All listed projects for this firm show a status of review complete. The firm’s work in the region includes significant public and commercial structures, such as the Women’s Dormitory in Longview valued at $7,000,000.
The site is located in ZIP code 45686, where the U.S. Census American Community Survey 2023 five-year estimates report a population of about 3,556 and a median household income of $53,212. The area includes existing businesses such as TM Studios, a beauty salon, and The Sausage Warehouse. Camp County unemployment was reported at 5.4 percent in August 2026 by FRED. The project remains in a status where the physical completion is not verified by a final inspection record.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 45686 (Pittsburg)
One email per change. Unsubscribe in one click. Privacy.
New Warehouse Building is a New Construction project located at 110 Dickson Street in Pittsburg, Texas. The project has an estimated value of $954K covering 10,600 sq ft. Andritz Separation Inc. is the property owner and Johnson & Pace Incorporated is the design firm of record. The project was registered with TDLR on February 10, 2025.
Frequently Asked Questions
Is the Andritz Separation warehouse open?
The TDLR record has not yet recorded a final inspection. Therefore, the public record does not confirm that the construction is complete or that the facility is open for operations.
Who is the owner of the new warehouse?
The owner of record listed in the TDLR filing is Andritz Separation Inc. The project is privately funded and located on private land for private use.
What is the estimated cost of the project?
The estimated cost for the new 10,600-square-foot warehouse is $954,000. This figure is above the median cost for new construction in Camp County but below the median cost per square foot.
When was the plan review completed?
TDLR completed the plan review in February 2025. Construction was scheduled to start in March 2025 and finish in January 2026, though a final inspection has not yet recorded a final inspection.
Who designed the building?
Johnson & Pace Incorporated is the design firm of record. Misti Casandra Cunningham is the registered accessibility specialist for the project.
What is New Warehouse Building?
New Warehouse Building is a new construction project at 110 Dickson Street in Pittsburg, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New storage warehouse
Is New Warehouse Building open in Pittsburg?
New Warehouse Building was scheduled to finish construction in Jan 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is New Warehouse Building located?
New Warehouse Building is located at 110 Dickson Street, Pittsburg, TX, 45686, in Camp County.
Who is the owner or developer of New Warehouse Building?
Andritz Separation Inc. is the property owner/developer of record for New Warehouse Building, per its TDLR project registration.
Who is the architect or design firm for New Warehouse Building?
Johnson & Pace Incorporated is the design firm of record for New Warehouse Building, according to its TDLR filing.
How much does New Warehouse Building cost and how big is it?
New Warehouse Building has an estimated construction value of $954K and approximately 10,600 square feet (about $90/sqft), based on its TDLR filing.
Scope of Work
New storage warehouse
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
110 Dickson Street, Pittsburg, TX, 45686
Related Projects
Same Design Firm
$488.8M totalWatch all construction in 45686 (Pittsburg)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Pittsburg?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.