Camp County, TX Construction Projects

2 Cities · 55 Projects

55
Projects
$127.0M
Total Value
33
New Builds
22
Renovations
2
Cities
386K
Sq Ft

What is being built in Camp County, Texas?

Camp County, Texas has 55 construction and development projects on file worth $127.0M — 33 new construction and 22 renovations or remodels, spread across 2 cities and towns. Each record is a real filing from Texas public construction records and names the project, its declared value and the date it was registered.

Which cities in Camp County have the most construction?

The most active cities for construction in Camp County are Pittsburg (50 projects), Mount Pleasant (1 project). Counts reflect the filings on this page, so a city with a single large development can carry more value than one with more projects.

What new developments are coming to Camp County?

The most recently filed new-construction projects in Camp County are Region 8 Interior Renvoations ($15.0M), Fair Park Improvements - Contract No 2 ($607K), Fair Park Improvements - Contract No 1 ($546K), New Warehouse Building ($954K). A new-construction filing is the earliest public signal that something new is being built, usually well before it opens.

Camp County Map

Project locations across the county

Camp County Economy

Federal Reserve Economic Data (FRED)

5.4%→
Unemployment Rate
5K
Labor Force
Available workers
+1.9%
Unemployment YoY
Rising
Camp County economy: 5.4% unemployment with 5K labor force supporting 55 construction projects worth $127.0M.
1 New Projects in Last 6 Months
$15.0M in new investment
4
Inspection Complete
9
Review Complete
38
Closed
Zabalist / visual intelligence

See the shape of development

Compare project scale, registration dates, and locations across 55 loaded TDLR filings. This is the loaded selection, not a measure of every project in the market.

Camp County
Estimated construction value$127MSum of 54 shown records with value
Records in view55 / 55Ready to inspect and compare
Largest record’s share24.8%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect1 without reported value · Smaller records grouped
Camp County

Comparisons use only these 55 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

All Projects

55 TDLR · 0 Site Plans

Showing 20 of 55 listed TDLR filings

Inspection Complete
$512K

AutoZone #11047

113 N Greer Blvd Suite 101, Pittsburg, TX 75686

7,860 sqftFeb 5, 2026
Registered
$3.4M

Pittsburg Kubota

481 N. Hwy 271, Mount Pleasant, TX 75686

14,000 sqftNov 11, 2024
Inspection Complete
$424K

Victory Church

706 S Greer Blvd, Pittsburg, TX 75686

2,742 sqftOct 23, 2024
Review Complete
$749K

Pizza Hut Pittsburg

406 Daingerfield St, Pittsburg, TX 75686

2,222 sqftJul 16, 2024
Closed
$1.5M

Victory Church

706 South Greer P.O. Box 1005 Pittsburg, TX, Pittsburg, TX 75686

9,000 sqftMar 8, 2024
Closed
$2.0M

Work Trailers

307 Greer Street, Pittsburg, TX 75686

15,384 sqftJul 11, 2022

Camp County construction: common questions

How many construction projects are in Camp County, Texas?
Camp County has 55 registered construction projects worth $127.0M, covering 385,555 square feet of development. The average project is valued at $2.3M.
What kind of construction is happening in Camp County?
Camp County has 33 new construction projects (60%) and 22 renovation or remodel projects (40%) on file. Work spans commercial, residential, public and mixed-use development.
Who is building in Camp County?
The property owners with the highest declared value on file in Camp County are City of Pittsburg, Pittsburg ISD, Region 8 ESC. The architecture and design firms appearing most often on Camp County filings are Hayes Engineering, Inc., BWA Architects, BWA Arhcitects.
Where does this Camp County construction data come from?
Every project on this page is a TDLR-registered construction filing from Texas public records, not an estimate or a listing. Each entry keeps the project name, declared value, owner and registration date exactly as filed, which is why a project can appear here months before any visible work starts on site.