Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Pittsburg ISD - 2024 Bond - Site Improvements - High School
300 N. Texas Street, Pittsburg, TX, 75686
Pittsburg ISD - 2024 Bond - Site Improvements - High School is a new construction project at 300 N. Texas Street, Pittsburg, in Camp County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $1.8M across about 11,000 sq ft.
- Estimated project value
- $1.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 11,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $164/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 5mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
55 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
882 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Pittsburg ISD - 2024 Bond - Site Improvements - High School
Pittsburg ISD is undertaking new construction at Pittsburg High School, located at 300 N. Texas Street in Pittsburg, Camp County. The project, filed as Pittsburg ISD - 2024 Bond - Site Improvements - High School, involves the creation of 11,000 sq ft of new space. The estimated cost for this phase is $1,800,000, resulting in a cost of $164 per square foot. Construction is scheduled to finish in August 2027, with work starting in March 2025.
Project Scope and Status
The current submittal covers site and utilities work only. Pavement scope will begin once building work commences. TDLR completed plan review in January 2025, and the project status is listed as Review Complete. The registered accessibility specialist for this filing is Marcela Abadi Rhoads. This project involves public funds and public land. The construction window spans from March 2025 to August 2027, a duration of 882 days.
In comparison to other TDLR-registered new construction filings in Camp County, this project's cost is above the county median of $750,000. The scheduled build window of 882 days is longer than the county median of 274 days. The cost per square foot of $164 is close to the county median of $151. Pittsburg ISD has two other TDLR-registered projects totaling $17,700,000, including Pittsburg Junior School and a new vehicle maintenance building. BWA Architects, the design firm of record, has six other TDLR-registered projects totaling $19,500,000 across various Texas locations.
Local Context
Pittsburg is located in Camp County, with a ZIP code 75686 population of about 13,427 according to U.S. Census ACS 2023 five-year estimates. The median household income in this area is $56,112, and the median owner-occupied home value is $158,900. Housing in this area is predominantly owner-occupied. The Camp County unemployment rate was 5.4 percent in August 2026, according to FRED data. Other registered projects in the same area include Andritz Separation and Same, indicating ongoing development activity in the region.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75686 (Pittsburg)
One email per change. Unsubscribe in one click. Privacy.
Pittsburg ISD - 2024 Bond - Site Improvements - High School is a New Construction project located at 300 N. Texas Street in Pittsburg, Texas. The project has an estimated value of $1.8M covering 11,000 sq ft. Pittsburg ISD is the property owner and BWA Architects is the design firm of record. The project was registered with TDLR on January 21, 2025.
Frequently Asked Questions
What is the estimated cost of the Pittsburg High School project?
The estimated cost for the site and utilities work phase is $1,800,000.
What is the scope of work for the current filing?
The current submittal covers site and utilities work only. Pavement scope will begin once building work begins.
Is the Pittsburg High School project open for use?
The project is under construction and not yet open. Work started in March 2025.
What is Pittsburg ISD - 2024 Bond - Site Improvements - High School?
Pittsburg ISD - 2024 Bond - Site Improvements - High School is a new construction project at 300 N. Texas Street in Pittsburg, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Current submittal is site and utilities work only. Pavement scope will begin once building work begins.
Is Pittsburg ISD - 2024 Bond - Site Improvements - High School open in Pittsburg?
Pittsburg ISD - 2024 Bond - Site Improvements - High School is still under construction in Pittsburg, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Where is Pittsburg ISD - 2024 Bond - Site Improvements - High School located?
Pittsburg ISD - 2024 Bond - Site Improvements - High School is located at 300 N. Texas Street, Pittsburg, TX, 75686, in Camp County.
Who is the owner or developer of Pittsburg ISD - 2024 Bond - Site Improvements - High School?
Pittsburg ISD is the property owner/developer of record for Pittsburg ISD - 2024 Bond - Site Improvements - High School, per its TDLR project registration.
Who is the architect or design firm for Pittsburg ISD - 2024 Bond - Site Improvements - High School?
BWA Architects is the design firm of record for Pittsburg ISD - 2024 Bond - Site Improvements - High School, according to its TDLR filing.
How much does Pittsburg ISD - 2024 Bond - Site Improvements - High School cost and how big is it?
Pittsburg ISD - 2024 Bond - Site Improvements - High School has an estimated construction value of $1.8M and approximately 11,000 square feet (about $164/sqft), based on its TDLR filing.
Scope of Work
Current submittal is site and utilities work only. Pavement scope will begin once building work begins.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
300 N. Texas Street, Pittsburg, TX, 75686
Related Projects
Same Owner
$27.3M totalWatch all construction in 75686 (Pittsburg)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Pittsburg?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.