Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Student Success Center / Student Union in Richardson, TX
800 W. Campbell Road, Richardson, TX, 75080
Student Success Center / Student Union is a new construction project at 800 W. Campbell Road, Richardson, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $238.0M across about 381,433 sq ft.
- Estimated project value
- $238.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 381,433 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $624/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 6mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
317 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
595 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Student Success Center / Student Union
The UTD Student Success Center/ Student Union is a new construction project located at 800 W. Campbell Road in Richardson. The filing describes a 4-story building with a basement, totaling 381,433 square feet. This Type I-B structure is designed to include classrooms, offices, sporting facilities, storage, and assembly spaces. The estimated cost for this development is $238,000,000, which calculates to $624 per square foot.
Project Scope and Design
Perkins & Will is the design firm of record for the UTD Student Success Center/ Student Union. The University of Texas System, acting through UTD, is the owner and developer. The scope of work involves creating a comprehensive student hub that integrates academic and social functions into a single large-scale facility. The project is registered with TDLR and involves public funds and public land. The construction start date listed in the filing is April 2024, with a scheduled completion date of October 2026.
TDLR completed the plan review process in February 2025. The registered accessibility specialist for this project is Marcela Abadi Rhoads. The status of the project in the public record shows that TDLR has not yet recorded a final inspection. Therefore, the current state of the site and whether construction is fully finished cannot be confirmed through the public filing. The registered status is marked as Review Complete.
Context and Comparison
This project is significantly larger than the median new construction filing in Collin County. The median estimated cost for such filings is $800,000, and the median size is 7,066 square feet. At 381,433 square feet, the UTD Student Success Center/ Student Union exceeds the median size by a substantial margin. The cost per square foot of $624 is also above the county median of $121 per square foot. The scheduled build window of 912 days is longer than the county median of 212 days.
Perkins & Will has been involved in six other TDLR-registered projects totaling $154,737,070. These include Galleria North Tower I in Dallas and 811 Main in Houston. The University of Texas at Dallas is located in Richardson, a city with a population of about 52,746 according to U.S. Census estimates. The median household income in the 75080 ZIP code is $89,773. Nearby businesses include Prestonwood Pregnancy Center and Chocolate Angel Cafe & Tea Room. The Collin County unemployment rate was 4.4 percent in August 2026.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75080 (Richardson)
One email per change. Unsubscribe in one click. Privacy.
Student Success Center / Student Union is a New Construction project located at 800 W. Campbell Road, Richardson, TX 75080 in Richardson, Texas. The project has an estimated value of $238.0M covering 381,433 sq ft. The University of Texas System c/o UTD is the property owner and Perkins & Will is the design firm of record. The project was registered with TDLR on February 13, 2025.
Frequently Asked Questions
Is the UTD Student Success Center open to the public?
The TDLR record shows the project has not yet recorded a final inspection. Therefore, the public record does not confirm that the facility is open or operating. Construction was scheduled to finish in October 2026.
Who is the design firm for this project?
Perkins & Will is the design firm of record for the UTD Student Success Center/ Student Union. They are responsible for the architectural and design aspects of this new construction project.
What is the total square footage of the building?
The project filing lists the total square footage as 381,433 sq ft. This includes the four main stories and the basement level of the Type I-B building.
When did TDLR complete the plan review?
TDLR completed the plan review in February 2025. The project was registered with TDLR in the same month. The status is listed as Review Complete.
What is the estimated cost per square foot?
The estimated cost per square foot is $624. This is calculated by dividing the total estimated cost of $238,000,000 by the 381,433 square feet of the building.
What is Student Success Center / Student Union?
Student Success Center / Student Union is a new construction project at 800 W. Campbell Road in Richardson, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Student Union Success Center for UTD; 4-story + basement, type I-B building, 381,433 SF, consisting of classrooms, offices, sporting, storage and assembly spaces
Is Student Success Center / Student Union open in Richardson?
Student Success Center / Student Union was scheduled to finish construction in Oct 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Student Success Center / Student Union located?
Student Success Center / Student Union is located at 800 W. Campbell Road, Richardson, TX, 75080, in Collin County.
Who is the owner or developer of Student Success Center / Student Union?
The University of Texas System c/o UTD is the property owner/developer of record for Student Success Center / Student Union, per its TDLR project registration.
Who is the architect or design firm for Student Success Center / Student Union?
Perkins & Will is the design firm of record for Student Success Center / Student Union, according to its TDLR filing.
How much does Student Success Center / Student Union cost and how big is it?
Student Success Center / Student Union has an estimated construction value of $238.0M and approximately 381,433 square feet (about $624/sqft), based on its TDLR filing.
Scope of Work
New Student Union Success Center for UTD; 4-story + basement, type I-B building, 381,433 SF, consisting of classrooms, offices, sporting, storage and assembly spaces
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
800 W. Campbell Road, Richardson, TX, 75080
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 75080 (Richardson)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Richardson?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.