Project intelligenceTDLR TABS2025014014Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

IISD Cardwell Multi-campus Renovations in Irving, TX

101 E Union Bower Rd, Irving, TX, 75061

Construction complete · Oct 2026Inspection Complete

IISD Cardwell Multi-campus Renovations is a renovation/alteration project at 101 E Union Bower Rd, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $110K across about 2,775 sq ft.

Estimated project value
$110K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,775 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$40/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 12, 2025574 days across supplied datesOct 7, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    82 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    67 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    425 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About IISD Cardwell Multi-campus Renovations

The Cardwell Career Preparatory Center in Irving completed its renovation work in October 2026. The project, filed with the Texas Department of Licensing and Regulation as the IISD Cardwell Multi-campus Renovations, underwent a final TDLR accessibility inspection that confirmed the building met all required standards. This status marks the end of the construction phase for this specific campus update.

Located at 101 E Union Bower Rd in Dallas County, the work focused on the renovation of finishes within the cafeteria area. The project covered 2,775 sq ft of space. Irving Independent School District served as the owner of record, while BRW Architects was the design firm responsible for the project plans. Marcela Abadi Rhoads was the registered accessibility specialist associated with the filing.

The estimated cost for this renovation was $109,780. This figure places the project below the median estimated cost for similar renovation and alteration filings in Dallas County. The scheduled build window was 67 days, which is shorter than the county median of 92 days for comparable projects. The cost per square foot was $40, also below the county median of $73 per sq ft. These metrics indicate an efficient allocation of resources for the scope of work defined in the filing.

Construction was scheduled to begin in June 2025, following the completion of plan review in March 2025. The project was registered with TDLR in March 2025. The filing noted that the project involves public funds or public land. The completion date listed on the filing was August 2025, but the final inspection did not pass until October 2026. This timeline reflects the actual duration from start to final verification.

Irving Independent School District has other registered projects in the area, including renovations at Travis Middle School and MacArthur High School. BRW Architects has designed several other large-scale projects across Texas, such as the Rio Bank Jackson facility in McAllen. The Cardwell Career Preparatory Center renovation is one of multiple updates the district has undertaken to improve its educational facilities. The final TDLR accessibility inspection ensures that the renovated space is accessible and compliant with state regulations.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75061 (Irving)

One email per change. Unsubscribe in one click. Privacy.

IISD Cardwell Multi-campus Renovations is a Renovation/Alteration project located at 101 E Union Bower Rd, Irving, TX 75061 in Irving, Texas. The project has an estimated value of $110K covering 2,775 sq ft. Irving Independent School District is the property owner and BRW Architects is the design firm of record. The project was registered with TDLR on March 12, 2025.

Frequently Asked Questions

Is the Cardwell Career Preparatory Center open?

The construction is complete, and the building passed its final TDLR accessibility inspection in October 2026. The TDLR record confirms the renovation is finished, but it does not provide specific details about daily operating hours or current business status.

What was the scope of the renovation?

The work involved the renovation of finishes at the cafeteria. The project covered 2,775 sq ft of space within the Cardwell Career Preparatory Center building in Irving, Texas.

Who was the design firm for the project?

BRW Architects was the design firm of record for the IISD Cardwell Multi-campus Renovations project. They were responsible for the architectural plans and design oversight during the renovation process.

How much did the renovation cost?

The estimated cost for the project was $109,780. This amount is below the median cost for similar renovation projects in Dallas County, reflecting a focused scope of work on interior finishes.

When did the project pass inspection?

The project passed its final TDLR accessibility inspection in October 2026. This date marks the official completion of the construction and compliance verification process for the renovated cafeteria.

What is IISD Cardwell Multi-campus Renovations?

IISD Cardwell Multi-campus Renovations is a renovation/alteration project at 101 E Union Bower Rd in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of finishes at Cafeteria

Is IISD Cardwell Multi-campus Renovations open in Irving?

Construction on IISD Cardwell Multi-campus Renovations is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is IISD Cardwell Multi-campus Renovations located?

IISD Cardwell Multi-campus Renovations is located at 101 E Union Bower Rd, Irving, TX, 75061, in Dallas County.

Who is the owner or developer of IISD Cardwell Multi-campus Renovations?

Irving Independent School District is the property owner/developer of record for IISD Cardwell Multi-campus Renovations, per its TDLR project registration.

Who is the architect or design firm for IISD Cardwell Multi-campus Renovations?

BRW Architects is the design firm of record for IISD Cardwell Multi-campus Renovations, according to its TDLR filing.

How much does IISD Cardwell Multi-campus Renovations cost and how big is it?

IISD Cardwell Multi-campus Renovations has an estimated construction value of $110K and approximately 2,775 square feet (about $40/sqft), based on its TDLR filing.

Scope of Work

Renovation of finishes at Cafeteria

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

101 E Union Bower Rd, Irving, TX, 75061

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75061 (Irving)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.