Funding type
This project is privately funded, on private land for private use.
Logistics Center 12 Pavement Improvements in Irving, TX
2900 State Highway 161, Irving, TX, 75261
Logistics Center 12 Pavement Improvements is a renovation/alteration project at 2900 State Highway 161, Irving, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $400K across about 15,000 sq ft.
- Estimated project value
- $400K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 15,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $27/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 6 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
31 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
194 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Logistics Center 12 Pavement Improvements
Logistics Center 12 Pavement Improvements is a 15,000 sq ft renovation project located at 2900 State Highway 161, Irving, TX 75261. The work involves removing existing paving, repaving according to a proposed grading plan, and reconnecting elevations at the sawcut. DFW Park 161 ILP, LLC. is the owner of record for this facility, which is part of the DFW Park 161 development in Dallas County.
The project is privately funded and situated on private land for private use. Westwood serves as the design firm of record, while Jeffery L Kelley is the registered accessibility specialist. The estimated cost for this renovation/alteration work is $400,000, which computes to $27 per sq ft. This cost is above the Dallas County median for similar renovation filings, while the per-square-foot cost is below the county median.
Project Status and Timeline
TDLR completed plan review in March 2025, and construction was scheduled to begin in April 2025 with a completion date of October 2025. The scheduled build window of 194 days is longer than the Dallas County median of 92 days for similar projects. Although the completion date has passed, TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record.
DFW Park 161 ILP, LLC. has two other TDLR-registered projects totaling $973,000, including DFW Park 161 - Building 9 and Logistics Center 10, both of which are closed. Westwood has six other registered projects totaling $7,772,992, ranging from retail improvements in Mansfield to trail work in Anna. Nearby registered projects in Irving include the Irving Towne Center and QuikTrip # 995, both undergoing renovation or alteration work.
Dallas County unemployment was 3 percent in August 2026, lower than a year earlier. This project represents a significant infrastructure update for the logistics center, focusing on pavement durability and grading compliance within the broader DFW Park 161 industrial complex.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75261 (Irving)
One email per change. Unsubscribe in one click. Privacy.
Logistics Center 12 Pavement Improvements is a Renovation/Alteration project located at 2900 State Highway 161, Irving, TX 75261 in Irving, Texas. The project has an estimated value of $400K covering 15,000 sq ft. DFW Park 161 ILP, LLC. is the property owner and Westwood is the design firm of record. The project was registered with TDLR on March 14, 2025.
Frequently Asked Questions
Is the pavement renovation complete?
TDLR has not yet recorded a final inspection. While the scheduled completion date was October 2025, the public record does not confirm the site's current status.
Who is the owner of Logistics Center 12?
DFW Park 161 ILP, LLC. is the owner of record for this facility located at 2900 State Highway 161 in Irving, Texas.
What is the scope of work for this project?
The scope includes removing existing paving, repaving according to the proposed grading plan, and reconnecting to elevations at the sawcut across 15,000 sq ft.
What is the estimated cost of the project?
The estimated cost is $400,000, which equates to $27 per square foot for the 15,000 sq ft renovation.
Is the business open to the public?
The facts provided cover construction status only. TDLR has not yet recorded a final inspection, so operational status is not confirmed in the public record.
What is Logistics Center 12 Pavement Improvements?
Logistics Center 12 Pavement Improvements is a renovation/alteration project at 2900 State Highway 161 in Irving, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: s Removing the existing paving, repaving according to the proposed grading plan, and reconnecting to the elevations at the sawcut (15,000 sf)
Is Logistics Center 12 Pavement Improvements open in Irving?
Logistics Center 12 Pavement Improvements was scheduled to finish construction in Oct 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Logistics Center 12 Pavement Improvements located?
Logistics Center 12 Pavement Improvements is located at 2900 State Highway 161, Irving, TX, 75261, in Dallas County.
Who is the owner or developer of Logistics Center 12 Pavement Improvements?
DFW Park 161 ILP, LLC. is the property owner/developer of record for Logistics Center 12 Pavement Improvements, per its TDLR project registration.
Who is the architect or design firm for Logistics Center 12 Pavement Improvements?
Westwood is the design firm of record for Logistics Center 12 Pavement Improvements, according to its TDLR filing.
How much does Logistics Center 12 Pavement Improvements cost and how big is it?
Logistics Center 12 Pavement Improvements has an estimated construction value of $400K and approximately 15,000 square feet (about $27/sqft), based on its TDLR filing.
Scope of Work
s Removing the existing paving, repaving according to the proposed grading plan, and reconnecting to the elevations at the sawcut (15,000 sf)
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2900 State Highway 161, Irving, TX, 75261
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$2.6M totalWatch all construction in 75261 (Irving)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.