Project intelligenceTDLR TABS2025017073Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Linear Accelerator and CT Equipment Replacement in Uvalde, TX

1195 Gerner Field Rd, Uvalde, TX, 78801

Construction complete · Apr 2025Inspection Complete

Linear Accelerator and CT Equipment Replacement is a renovation/alteration project at 1195 Gerner Field Rd, Uvalde, in Uvalde County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2025). The project has an estimated value of $1.2M across about 2,350 sq ft.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,350 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$511/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 21, 2025133 days across supplied datesSep 1, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    42 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    91 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Linear Accelerator and CT Equipment Replacement

The Kate Marmion Regional Care Center in Uvalde completed a renovation focused on medical equipment and interior finishes. The project, filed as a Linear Accelerator and CT Equipment Replacement, involved work on 2,350 square feet of space at 1195 Gerner Field Rd. The estimated cost for this renovation and alteration was $1,200,000. This investment covers the replacement of key diagnostic and treatment machinery along with the updating of interior finishes to support clinical operations.

Construction on the project began in June 2025, with a scheduled completion date of September 2025. The building passed its final TDLR accessibility inspection in April 2025, confirming that the construction phase is complete. The TDLR status for this filing is listed as Inspection Complete. The project was registered with the Texas Department of Licensing and Regulation in April 2025, establishing the official record for this specific scope of work.

The owner of record is the Uvalde County Hospital Authority. The design work was handled by Oconnell Robertson, a firm with other registered projects in the region, including work at Resolute Baptist Hospital and Marion High School. Jessica Trevino Hamm served as the registered accessibility specialist for this filing. The project is privately funded and located on private land for private use, ensuring direct control over the facility's infrastructure upgrades.

Cost and Scale Context

At $1,200,000, the estimated cost is above the median for renovation and alteration projects in Uvalde County, which stands at $265,000. The cost per square foot for this project is $511, which is higher than the county median of $100 per square foot. The scheduled build window was 91 days, shorter than the county median of 153 days for similar work. This efficiency reflects a focused scope targeting specific equipment replacement rather than broad structural changes.

The surrounding area includes other healthcare and service businesses, such as Uvalde Memorial Hospital and Risinger Orthodontics. Census estimates for the 78801 ZIP code indicate a population of about 21,487 and a median household income of $58,028. The project sits within a community that supports regional healthcare needs through established local institutions and service providers.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78801 (Uvalde)

One email per change. Unsubscribe in one click. Privacy.

Linear Accelerator and CT Equipment Replacement is a Renovation/Alteration project located at 1195 Gerner Field Rd in Uvalde, Texas. The project has an estimated value of $1.2M covering 2,350 sq ft. UVALDE COUNTY HOSPITAL AUTHORITY is the property owner and Oconnell Robertson is the design firm of record. The project was registered with TDLR on April 21, 2025.

Frequently Asked Questions

Is the Kate Marmion Regional Care Center renovation complete?

Yes, the building passed its final TDLR accessibility inspection in April 2025. The TDLR status is listed as Inspection Complete, indicating the construction work is finished.

What was the estimated cost of the project?

The estimated cost for the Linear Accelerator and CT Equipment Replacement was $1,200,000. This covers the replacement of medical equipment and the renovation of finishes.

Who is the owner of the facility?

The owner of record is the Uvalde County Hospital Authority. The project is privately funded and located on private land for private use.

What is the size of the renovated area?

The project involved work on 2,350 square feet of space. The estimated cost per square foot is $511.

When did construction start and finish?

Construction started in June 2025. The final TDLR accessibility inspection was passed in April 2025, marking the completion of the construction phase.

What is Linear Accelerator and CT Equipment Replacement?

Linear Accelerator and CT Equipment Replacement is a renovation/alteration project at 1195 Gerner Field Rd in Uvalde, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The replacement of a linear accelerator and CT equipment along with replacing finishes.

Is Linear Accelerator and CT Equipment Replacement open in Uvalde?

Construction on Linear Accelerator and CT Equipment Replacement is complete — TDLR records show the project passed its required accessibility inspection in Apr 2025. The building is finished and very likely open.

Where is Linear Accelerator and CT Equipment Replacement located?

Linear Accelerator and CT Equipment Replacement is located at 1195 Gerner Field Rd, Uvalde, TX, 78801, in Uvalde County.

Who is the owner or developer of Linear Accelerator and CT Equipment Replacement?

UVALDE COUNTY HOSPITAL AUTHORITY is the property owner/developer of record for Linear Accelerator and CT Equipment Replacement, per its TDLR project registration.

Who is the architect or design firm for Linear Accelerator and CT Equipment Replacement?

Oconnell Robertson is the design firm of record for Linear Accelerator and CT Equipment Replacement, according to its TDLR filing.

How much does Linear Accelerator and CT Equipment Replacement cost and how big is it?

Linear Accelerator and CT Equipment Replacement has an estimated construction value of $1.2M and approximately 2,350 square feet (about $511/sqft), based on its TDLR filing.

Scope of Work

The replacement of a linear accelerator and CT equipment along with replacing finishes.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1195 Gerner Field Rd, Uvalde, TX, 78801

Loading location map…
29.21497, -99.76682

Watch all construction in 78801 (Uvalde)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.