Project intelligenceTDLR TABS2025020650Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Uvalde Memorial Hospital PT/OT Renovation

1195 GARNER FIELD RD, Uvalde, TX, 78801

Opening ~Jan 2027Review Complete

Uvalde Memorial Hospital PT/OT Renovation is a renovation/alteration project at 1195 GARNER FIELD RD, Uvalde, in Uvalde County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jan 2027. The project has an estimated value of $4.8M across about 12,400 sq ft.

Estimated project value
$4.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
12,400 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$387/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 5, 2025603 days across supplied datesJan 29, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    422 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    181 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78801 (Uvalde)

One email per change. Unsubscribe in one click. Privacy.

Uvalde Memorial Hospital PT/OT Renovation is a Renovation/Alteration project located at 1195 GARNER FIELD RD in Uvalde, Texas. The project has an estimated value of $4.8M covering 12,400 sq ft. Uvalde County Hospital Authority is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on June 5, 2025.

Frequently Asked Questions

What is Uvalde Memorial Hospital PT/OT Renovation?

Uvalde Memorial Hospital PT/OT Renovation is a renovation/alteration project at 1195 GARNER FIELD RD in Uvalde, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation and alteration of existing clinic building for Physical Therapy services, to include walls, finishes, plumbing, electrical and HVAC work

Is Uvalde Memorial Hospital PT/OT Renovation open in Uvalde?

Uvalde Memorial Hospital PT/OT Renovation is still under construction in Uvalde, TX, with an estimated completion of Jan 2027 according to its TDLR registration.

Where is Uvalde Memorial Hospital PT/OT Renovation located?

Uvalde Memorial Hospital PT/OT Renovation is located at 1195 GARNER FIELD RD, Uvalde, TX, 78801, in Uvalde County.

Who is the owner or developer of Uvalde Memorial Hospital PT/OT Renovation?

Uvalde County Hospital Authority is the property owner/developer of record for Uvalde Memorial Hospital PT/OT Renovation, per its TDLR project registration.

Who is the architect or design firm for Uvalde Memorial Hospital PT/OT Renovation?

O'Connell Robertson is the design firm of record for Uvalde Memorial Hospital PT/OT Renovation, according to its TDLR filing.

How much does Uvalde Memorial Hospital PT/OT Renovation cost and how big is it?

Uvalde Memorial Hospital PT/OT Renovation has an estimated construction value of $4.8M and approximately 12,400 square feet (about $387/sqft), based on its TDLR filing.

Scope of Work

Renovation and alteration of existing clinic building for Physical Therapy services, to include walls, finishes, plumbing, electrical and HVAC work

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1195 GARNER FIELD RD, Uvalde, TX, 78801

29.21604, -99.76589

Watch all construction in 78801 (Uvalde)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.