Uvalde Memorial Hospital Site Improvements

1195 GARNER FIELD RD, Uvalde, TX, 78801

Target date passed (Jan 2026)Review Complete

Uvalde Memorial Hospital Site Improvements is a new construction project at 1195 GARNER FIELD RD, Uvalde, in Uvalde County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.7M across about 7,000 sq ft.

Estimated project value
$2.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
7,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$386/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 5, 2025238 days across supplied datesJan 29, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    57 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    181 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78801 (Uvalde)

One email per change. Unsubscribe in one click. Privacy.

Uvalde Memorial Hospital Site Improvements is a New Construction project located at 1195 GARNER FIELD RD in Uvalde, Texas. The project has an estimated value of $2.7M covering 7,000 sq ft. Uvalde County Hospital Authority is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on June 5, 2025.

Frequently Asked Questions

What is Uvalde Memorial Hospital Site Improvements?

Uvalde Memorial Hospital Site Improvements is a new construction project at 1195 GARNER FIELD RD in Uvalde, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new 7,000 SF open air pavilion including a public restrooms and storage building, associated walking trails and sports field areas.

Is Uvalde Memorial Hospital Site Improvements open in Uvalde?

Uvalde Memorial Hospital Site Improvements was scheduled to finish construction in Jan 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Uvalde Memorial Hospital Site Improvements located?

Uvalde Memorial Hospital Site Improvements is located at 1195 GARNER FIELD RD, Uvalde, TX, 78801, in Uvalde County.

Who is the owner or developer of Uvalde Memorial Hospital Site Improvements?

Uvalde County Hospital Authority is the property owner/developer of record for Uvalde Memorial Hospital Site Improvements, per its TDLR project registration.

Who is the architect or design firm for Uvalde Memorial Hospital Site Improvements?

O'Connell Robertson is the design firm of record for Uvalde Memorial Hospital Site Improvements, according to its TDLR filing.

How much does Uvalde Memorial Hospital Site Improvements cost and how big is it?

Uvalde Memorial Hospital Site Improvements has an estimated construction value of $2.7M and approximately 7,000 square feet (about $386/sqft), based on its TDLR filing.

Scope of Work

Construction of a new 7,000 SF open air pavilion including a public restrooms and storage building, associated walking trails and sports field areas.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1195 GARNER FIELD RD, Uvalde, TX, 78801

29.21604, -99.76589

Watch all construction in 78801 (Uvalde)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.