Project intelligenceTDLR TABS2025017420Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers in Midland, TX

3200 Kessler Ave, Midland, TX, 79701

Target date passed (Sep 2025)Review Complete

MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers is a renovation/alteration project at 3200 Kessler Ave, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Sep 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $2.8M across about 62,641 sq ft.

Estimated project value
$2.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
62,641 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$45/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 24, 2025159 days across supplied datesSep 30, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    129 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers

The Lamar Elementary School renovation in Midland involves the installation of sprinkler piping, utility connections, and ceiling replacement across 62,641 sq ft of existing space. This project is part of the MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers filing, with an estimated cost of $2,813,450. The work is classified as a Renovation/Alteration on public land for the Midland Independent School District.

Vandergriff Group Architects, P.C. serves as the design firm of record for this project, which is located at 3200 Kessler Ave in Midland County. Landy Perkins is the registered accessibility specialist associated with the filing. The project was registered with TDLR in April 2025, and plan review was completed in the same month. Construction was scheduled to begin in May 2025 with a completion date of September 2025.

The estimated cost of $2,813,450 places this project above the county median for renovation and alteration filings in Midland County, which stands at $250,000. The size of 62,641 sq ft is significantly larger than the median project size of 5,018 sq ft for similar filings in the area. The cost per square foot is estimated at $45, which is below the county median of $80 per square foot for comparable renovation projects.

The scheduled build window for this project is 129 days, a duration that is close to the county median of 122 days for renovation and alteration work. This timing aligns with the scale of the utility and ceiling work described in the scope of work. The project involves public funds and is situated in a residential area with a median household income of $57,679 according to U.S. Census estimates for ZIP 79701.

While the filing indicates a completion date of September 2025, TDLR has not yet recorded a final inspection. Therefore, the current state of the site is not confirmed in the public record. The Midland Independent School District has six other TDLR-registered projects totaling $64,100,000, indicating a broader pattern of infrastructure investment in the district. Vandergriff Group Architects, P.C. has also worked on five other projects totaling $6,953,305 in the region, including work at Houston Elementary School and Parker Elementary School.

The project is one of several registered works in the immediate area, which includes renovations at The Commons at North Park Shopping Center and the Midland Habitat ReStore. The labor market in Midland County remains stable, with an unemployment rate of 3.3 percent in August 2026. This renovation supports the existing educational infrastructure at Lamar Elementary School, ensuring that the facility meets current safety and accessibility standards through the specified scope of work.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79701 (Midland)

One email per change. Unsubscribe in one click. Privacy.

MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers is a Renovation/Alteration project located at 3200 Kessler Ave in Midland, Texas. The project has an estimated value of $2.8M covering 62,641 sq ft. Midland Independent School District is the property owner and Vandergriff Group Architects, P.C. is the design firm of record. The project was registered with TDLR on April 24, 2025.

Frequently Asked Questions

What is the scope of work for Lamar Elementary School?

The scope includes the installation of sprinkler piping, utility work for connection, and ceiling replacement across 62,641 sq ft of the building.

Who is the owner of the project?

The owner of record is the Midland Independent School District, which is responsible for the facility and the associated public funding.

Has the project been inspected?

TDLR has not yet recorded a final inspection, so the current state of the site is not confirmed in the public record despite the scheduled completion date.

Who is the design firm?

Vandergriff Group Architects, P.C. is the design firm of record for this renovation and alteration project in Midland.

What is the estimated cost per square foot?

The estimated cost is $45 per square foot, which is below the county median of $80 per square foot for similar renovation filings.

What is MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers?

MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers is a renovation/alteration project at 3200 Kessler Ave in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of sprinkler paping, utility work for connection & ceiling replacement 62,641sf

Is MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers open in Midland?

MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers was scheduled to finish construction in Sep 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers located?

MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers is located at 3200 Kessler Ave, Midland, TX, 79701, in Midland County.

Who is the owner or developer of MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers?

Midland Independent School District is the property owner/developer of record for MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers, per its TDLR project registration.

Who is the architect or design firm for MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers?

Vandergriff Group Architects, P.C. is the design firm of record for MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers, according to its TDLR filing.

How much does MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers cost and how big is it?

MISD Bond - Pkg 3 - Elem Group A - Lamar Sprinklers has an estimated construction value of $2.8M and approximately 62,641 square feet (about $45/sqft), based on its TDLR filing.

Scope of Work

Installation of sprinkler paping, utility work for connection & ceiling replacement 62,641sf

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3200 Kessler Ave, Midland, TX, 79701

Loading location map…
31.99219, -102.10805