MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers in Midland, TX
2200 W Louisiana Ave, Midland, TX, 79701
MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers is a renovation/alteration project at 2200 W Louisiana Ave, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $2.4M across about 75,877 sq ft.
- Estimated project value
- $2.4M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 75,877 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $31/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
30 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
129 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
114 days after the preceding date shown.
Source: TDLR filing
View source record
📰About MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers
Midland Independent School District completed a $2,368,600 renovation at Houston Elementary School, located at 2200 W Louisiana Ave in Midland. The project involved the installation of sprinkler piping, utility connections, and ceiling replacement across 75,877 square feet of the facility. This work was part of the MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers filing.
The construction schedule ran from May 2025 to September 2025, a period of 129 days. This timeline is close to the 122-day median build window for similar renovation and alteration projects in Midland County. The estimated cost of $2,368,600 places the project in the top quarter of comparable filings in the county, which have a median cost of $250,000.
Vandergriff Group Architects, P.C. served as the design firm of record for this project. Landy Perkins was the registered accessibility specialist. The project utilized public funds and was registered with TDLR in April 2025. The final inspection passed in April 2025, confirming the completion of the required work.
Midland Independent School District has six other TDLR-registered projects totaling $64,100,000, including work at Bush Elementary School and DeZavala Elementary School. Vandergriff Group Architects, P.C. has also worked on six other projects totaling $5,628,855, including renovations at Emerson Elementary School and Parker Elementary School in Midland.
The TDLR record shows that the agency closed the project file in January 2026. This action marks the end of the accessibility review process for this construction. The project status is officially closed, indicating that all regulatory requirements for the renovation have been met.
Project Details
The scope included specific mechanical and structural updates to support safety and functionality. The $31 per square foot cost is below the county median of $80 for similar work. The location is in Midland County, where the unemployment rate was 3.3 percent in August 2026.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79701 (Midland)
One email per change. Unsubscribe in one click. Privacy.
MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers is a Renovation/Alteration project located at 2200 W Louisiana Ave, Midland, TX 79701 in Midland, Texas. The project has an estimated value of $2.4M covering 75,877 sq ft. Midland Independent School District is the property owner and Vandergriff Group Architects, P.C. is the design firm of record. The project was registered with TDLR on April 24, 2025.
Frequently Asked Questions
What work was done at Houston Elementary School?
The renovation included installing sprinkler piping, performing utility work for connections, and replacing ceilings across 75,877 square feet of the building.
Who is the owner of the project?
Midland Independent School District is the owner and developer of record for this renovation project at Houston Elementary School.
What is the current status of the TDLR file?
TDLR closed the project file in January 2026. This indicates the accessibility review process is complete and the project is officially closed.
How much did the renovation cost?
The estimated cost for the sprinkler and ceiling work was $2,368,600, which equates to $31 per square foot for the 75,877 square feet of space.
Is the school open?
The TDLR record confirms the construction project is closed. It does not provide information regarding the school's daily operational status or opening hours.
What is MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers?
MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers is a renovation/alteration project at 2200 W Louisiana Ave in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of sprinkler piping, utility work for connection & ceiling replacement 75,877sf
Is MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers open in Midland?
Construction on MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Where is MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers located?
MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers is located at 2200 W Louisiana Ave, Midland, TX, 79701, in Midland County.
Who is the owner or developer of MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers?
Midland Independent School District is the property owner/developer of record for MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers, per its TDLR project registration.
Who is the architect or design firm for MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers?
Vandergriff Group Architects, P.C. is the design firm of record for MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers, according to its TDLR filing.
How much does MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers cost and how big is it?
MISD Bond - Pkg 3 - Elem Group A - Houston Sprinklers has an estimated construction value of $2.4M and approximately 75,877 square feet (about $31/sqft), based on its TDLR filing.
Scope of Work
Installation of sprinkler piping, utility work for connection & ceiling replacement 75,877sf
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2200 W Louisiana Ave, Midland, TX, 79701
Related Projects
Same Owner
$1.06B totalWatch all construction in 79701 (Midland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Midland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.