MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers in Midland, TX
2800 Moss Ave, Midland, TX, 79705
MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers is a renovation/alteration project at 2800 Moss Ave, Midland, in Midland County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2026). The project has an estimated value of $1.0M across about 63,069 sq ft.
- Estimated project value
- $1.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 63,069 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $17/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
30 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
129 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
119 days after the preceding date shown.
Source: TDLR filing
View source record
📰About MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers
Emerson Elementary School in Midland completed a significant renovation focused on safety infrastructure. The project involved the installation of sprinkler piping, utility connections, and ceiling replacement across 63,069 square feet of the facility located at 2800 Moss Ave. This work was part of a broader bond package for elementary schools in the district.
The estimated cost for this renovation was $1,044,150. This figure places the project above the median estimated cost for similar renovation and alteration filings in Midland County. The construction schedule spanned from May 2025 to September 2025, a duration of 129 days that is close to the county median build window for this type of work.
Project Details and Oversight
Midland Independent School District served as the owner of record for the project. Vandergriff Group Architects, P.C. was the design firm of record. Landy Perkins was the registered accessibility specialist responsible for the project's compliance with state standards. The work was funded through public funds, reflecting the district's commitment to maintaining safe school facilities.
The project was registered with TDLR in April 2025. The final inspection passed in April 2025, confirming that the renovation met all required standards. TDLR closed the project file in January 2026, which marks the end of the accessibility review process for this construction. This status confirms that all regulatory requirements have been satisfied and the project is officially complete.
Emerson Elementary School is one of several projects undertaken by Midland Independent School District in recent years. The district has other TDLR-registered projects in Midland, including work at Bush Elementary School and DeZavala Elementary School. These projects collectively represent a significant investment in the district's educational infrastructure.
The renovation aligns with broader efforts to improve safety and accessibility in Texas schools. By installing modern sprinkler systems and updating ceilings, the district enhances the safety of students and staff. The project also contributes to the overall maintenance and modernization of the school building, ensuring it meets contemporary standards for educational facilities.
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 79705 (Midland)
One email per change. Unsubscribe in one click. Privacy.
MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers is a Renovation/Alteration project located at 2800 Moss Ave, Midland, TX 79705 in Midland, Texas. The project has an estimated value of $1.0M covering 63,069 sq ft. Midland Independent School District is the property owner and Vandergriff Group Architects, P.C. is the design firm of record. The project was registered with TDLR on April 24, 2025.
Frequently Asked Questions
What work was done at Emerson Elementary School?
The renovation included installing sprinkler piping, performing utility work for connections, and replacing ceilings across 63,069 square feet of the building.
Who owned and designed the project?
Midland Independent School District was the owner of record, and Vandergriff Group Architects, P.C. served as the design firm of record.
When was the project completed?
The construction started in May 2025 and was scheduled for completion in September 2025. The final inspection passed in April 2025.
What is the current status of the TDLR file?
TDLR closed the project file in January 2026, indicating the accessibility review process is complete and the project is officially closed.
How much did the renovation cost?
The estimated cost for the project was $1,044,150, which is above the median cost for similar renovations in Midland County.
What is MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers?
MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers is a renovation/alteration project at 2800 Moss Ave in Midland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of sprinkler piping, utility work for connection & ceiling replacement 63,069sf
Is MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers open in Midland?
Construction on MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers is complete — TDLR records show the project passed its required accessibility inspection in Jan 2026. The building is finished and very likely open.
Where is MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers located?
MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers is located at 2800 Moss Ave, Midland, TX, 79705, in Midland County.
Who is the owner or developer of MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers?
Midland Independent School District is the property owner/developer of record for MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers, per its TDLR project registration.
Who is the architect or design firm for MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers?
Vandergriff Group Architects, P.C. is the design firm of record for MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers, according to its TDLR filing.
How much does MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers cost and how big is it?
MISD Bond - Pkg 3 - Elem Group A - Emerson Sprinklers has an estimated construction value of $1.0M and approximately 63,069 square feet (about $17/sqft), based on its TDLR filing.
Scope of Work
Installation of sprinkler piping, utility work for connection & ceiling replacement 63,069sf
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2800 Moss Ave, Midland, TX, 79705
Related Projects
Same Owner
$1.06B totalWatch all construction in 79705 (Midland)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Midland?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.