Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements
Mourning Dove Drive & F.M. Highway 362, Katy, TX, 77423
Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements is a new construction project at Mourning Dove Drive & F.M. Highway 362, Katy, in Waller County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.7M across about 355,000 sq ft.
- Estimated project value
- $1.7M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 355,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $5/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
29 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
153 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77423 (Katy)
One email per change. Unsubscribe in one click. Privacy.
Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements is a New Construction project located at Mourning Dove Drive & F.M. Highway 362 in Katy, Texas. The project has an estimated value of $1.7M covering 355,000 sq ft. Brian Stidham is the property owner. The project was registered with TDLR on July 1, 2025.
Frequently Asked Questions
What is Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements?
Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements is a new construction project at Mourning Dove Drive & F.M. Highway 362 in Katy, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalks, river rock, planting, irrigation, moss boulders, bullrock swale, swale crossing, decomposed granite
Is Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements open in Katy?
Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements was scheduled to finish construction in Dec 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements located?
Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements is located at Mourning Dove Drive & F.M. Highway 362, Katy, TX, 77423, in Waller County.
Who is the owner or developer of Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements?
Brian Stidham is the property owner/developer of record for Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements, per its TDLR project registration.
How much does Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements cost and how big is it?
Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements has an estimated construction value of $1.7M and approximately 355,000 square feet (about $5/sqft), based on its TDLR filing.
Scope of Work
Sidewalks, river rock, planting, irrigation, moss boulders, bullrock swale, swale crossing, decomposed granite
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Mourning Dove Drive & F.M. Highway 362, Katy, TX, 77423
Related Projects
Watch all construction in 77423 (Katy)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Katy?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.