Project intelligenceTDLR TABS2025022515New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements

Mourning Dove Drive & F.M. Highway 362, Katy, TX, 77423

Target date passed (Dec 2025)Review Complete

Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements is a new construction project at Mourning Dove Drive & F.M. Highway 362, Katy, in Waller County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.7M across about 355,000 sq ft.

Estimated project value
$1.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
355,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$5/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 1, 2025182 days across supplied datesDec 30, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    29 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    153 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77423 (Katy)

One email per change. Unsubscribe in one click. Privacy.

Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements is a New Construction project located at Mourning Dove Drive & F.M. Highway 362 in Katy, Texas. The project has an estimated value of $1.7M covering 355,000 sq ft. Brian Stidham is the property owner. The project was registered with TDLR on July 1, 2025.

Frequently Asked Questions

What is Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements?

Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements is a new construction project at Mourning Dove Drive & F.M. Highway 362 in Katy, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalks, river rock, planting, irrigation, moss boulders, bullrock swale, swale crossing, decomposed granite

Is Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements open in Katy?

Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements was scheduled to finish construction in Dec 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements located?

Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements is located at Mourning Dove Drive & F.M. Highway 362, Katy, TX, 77423, in Waller County.

Who is the owner or developer of Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements?

Brian Stidham is the property owner/developer of record for Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements, per its TDLR project registration.

How much does Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements cost and how big is it?

Sunterra Lakes Phase 1 Sections 1 & 3 Exterior Landscape Improvements has an estimated construction value of $1.7M and approximately 355,000 square feet (about $5/sqft), based on its TDLR filing.

Scope of Work

Sidewalks, river rock, planting, irrigation, moss boulders, bullrock swale, swale crossing, decomposed granite

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Mourning Dove Drive & F.M. Highway 362, Katy, TX, 77423

29.82025, -95.87558

Watch all construction in 77423 (Katy)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.