DFW Park 161 Phase III - Logistics Center 14 in Dfw Airport, TX
4215 Mobility Street, Dfw Airport, TX, 75261
DFW Park 161 Phase III - Logistics Center 14 is a new construction project at 4215 Mobility Street, Dfw Airport, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $16.0M across about 407,110 sq ft.
- Estimated project value
- $16.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 407,110 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $39/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
82 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
365 days after the preceding date shown.
Source: TDLR filing
View source record
📰About DFW Park 161 Phase III - Logistics Center 14
Perot Development is constructing Logistics Center 14, a new 407,110 sq ft shell warehouse, at 4215 Mobility Street in Dfw Airport, Texas. The project, filed with the Texas Department of Licensing and Regulation as DFW Park 161 Phase III, represents a significant addition to the logistics infrastructure in Dallas County. With an estimated cost of $16,006,659, the development is privately funded on private land for private use.
The scope of work includes the construction of a new shell building along with a small speculative tenant improvement. Downs Design Solutions, LLC serves as the design firm of record for this new construction project. The registered accessibility specialist is Marcela Abadi Rhoads, ensuring the facility meets state standards during the build-out phase.
Construction Timeline and Status
TDLR completed the plan review process in July 2025. According to the filing, construction work started in October 2025. The project is scheduled to finish in October 2026. This one-year build window is longer than the 243-day median scheduled build window for new construction projects in Dallas County, reflecting the scale of the 400,000-plus square foot facility.
The estimated cost of $16,006,659 places this project in the top quarter of estimated costs for new construction filings in the county, where the median is $950,000. However, the cost per square foot is $39, which is below the county median of $125 per square foot. This efficiency is typical for large-scale shell warehouse developments where bulk construction drives down unit costs.
Perot Development has five other TDLR-registered projects in the region, totaling $95,748,011. These include Logistics Center 13 in Dallas and Logistics Center 11 in Dfw Airport. The Dallas County unemployment rate was 3.3 percent in July 2026, higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75261 (Dfw Airport)
One email per change. Unsubscribe in one click. Privacy.
DFW Park 161 Phase III - Logistics Center 14 is a New Construction project located at 4215 Mobility Street, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $16.0M covering 407,110 sq ft. Perot Development is the property owner and Downs Design Solutions, LLC is the design firm of record. The project was registered with TDLR on July 11, 2025.
Frequently Asked Questions
Where is Logistics Center 14 located?
The project is at 4215 Mobility Street, Dfw Airport, TX 75261. It is situated in Dallas County, Texas, near the Dallas Fort Worth International Airport.
Who is developing this warehouse?
Perot Development is the owner and developer of record. Downs Design Solutions, LLC is the registered design firm for the project.
How large is the building?
Logistics Center 14 is a new construction project with a total size of 407,110 sq ft. It is a shell warehouse with a small speculative tenant improvement.
What is the estimated cost?
The estimated cost for Logistics Center 14 is $16,006,659. This figure is above the median estimated cost for new construction in Dallas County.
Is the project open for business?
No, the project is under construction. TDLR status shows Review Complete, and construction is scheduled to finish in October 2026.
What is DFW Park 161 Phase III - Logistics Center 14?
DFW Park 161 Phase III - Logistics Center 14 is a new construction project at 4215 Mobility Street in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a new shell warehouse building, with a small speculative tenant improvement
Is DFW Park 161 Phase III - Logistics Center 14 open in Dfw Airport?
DFW Park 161 Phase III - Logistics Center 14 was scheduled to finish construction in Oct 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is DFW Park 161 Phase III - Logistics Center 14 located?
DFW Park 161 Phase III - Logistics Center 14 is located at 4215 Mobility Street, Dfw Airport, TX, 75261, in Dallas County.
Who is the owner or developer of DFW Park 161 Phase III - Logistics Center 14?
Perot Development is the property owner/developer of record for DFW Park 161 Phase III - Logistics Center 14, per its TDLR project registration.
Who is the architect or design firm for DFW Park 161 Phase III - Logistics Center 14?
Downs Design Solutions, LLC is the design firm of record for DFW Park 161 Phase III - Logistics Center 14, according to its TDLR filing.
How much does DFW Park 161 Phase III - Logistics Center 14 cost and how big is it?
DFW Park 161 Phase III - Logistics Center 14 has an estimated construction value of $16.0M and approximately 407,110 square feet (about $39/sqft), based on its TDLR filing.
Scope of Work
Construction of a new shell warehouse building, with a small speculative tenant improvement
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
4215 Mobility Street, Dfw Airport, TX, 75261
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$198.5M totalWatch all construction in 75261 (Dfw Airport)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dfw Airport?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.