Spec Suite 275
Spec Suite 275 is a renovation/alteration project at 9191 Pinecroft Dr. Suite 275, The Woodlands, in Montgomery County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $245K across about 2,043 sq ft.
๐Project Metrics
TDLR #TABS2025025304Review Complete
Design review complete, construction may proceed
Spec Suite 275 is a Renovation/Alteration project located at 9191 Pinecroft Dr. Suite 275 in The Woodlands, Texas. The project has an estimated value of $245K covering 2,043 sq ft. Healthcare Realty Trust is the property owner. The project was registered with TDLR on August 6, 2025.
โFrequently Asked Questions
What is Spec Suite 275?
Spec Suite 275 is a renovation/alteration project at 9191 Pinecroft Dr. Suite 275 in The Woodlands, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: A 2,043 sq. ft. tenant renovation finish out in Pinecroft Medical Plaza within The Woodlands.
Is Spec Suite 275 open in The Woodlands?
Spec Suite 275 is currently under construction in The Woodlands, TX. Its current TDLR status is "Review Complete".
Where is Spec Suite 275 located?
Spec Suite 275 is located at 9191 Pinecroft Dr. Suite 275, The Woodlands, TX, 77380, in Montgomery County.
Who is the owner or developer of Spec Suite 275?
Healthcare Realty Trust is the property owner/developer of record for Spec Suite 275, per its TDLR project registration.
How much does Spec Suite 275 cost and how big is it?
Spec Suite 275 has an estimated construction value of $245K and approximately 2,043 square feet (about $120/sqft), based on its TDLR filing.
๐Scope of Work
A 2,043 sq. ft. tenant renovation finish out in Pinecroft Medical Plaza within The Woodlands.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Aug 6, 2025
Review Complete
Aug 6, 2025
Inspection Complete
Closed