Project intelligenceTDLR TABS2025025639Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Forest Park Middle School Solar in Longview, TX

1644 North Eastman, Longview, TX, 75601

Target date passed (Oct 2025)Project Registered

Forest Park Middle School Solar is a renovation/alteration project at 1644 North Eastman, Longview, in Gregg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $345K across about 50,000 sq ft.

Estimated project value
$345K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
50,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$7/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 12, 202580 days across supplied datesOct 31, 2025

3 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    27 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    53 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Forest Park Middle School Solar

Forest Park Middle School in Longview is the site of a renovation project focused on solar energy infrastructure. The filing, titled Forest Park Middle School Solar, describes the installation of racking and modules required for the Solar PV Project. The work is classified as a renovation or alteration with an estimated cost of $345,000. The project is associated with a square footage of 50,000 sq ft, resulting in a computed cost of $7 per square foot.

The owner of record for this work is Longview ISD. The project is located at 1644 North Eastman in Gregg County. It was registered with the Texas Department of Licensing and Regulation in August 2025. The filing lists a construction start date of September 2025 and a target completion date of October 2025. This project involves public funds, public land, or is a Federally funded roadway project.

Project Status and Record

The TDLR status for this filing is Project Registered. The target completion date of October 2025 has passed. However, no plan review or inspection has been recorded. This means that whether the project proceeded to completion is not confirmed in the public record. The absence of recorded inspections indicates that the final state of the construction is not verified by the state licensing database.

Longview ISD has six other TDLR-registered projects totaling $57,058,083. These include the Longview ISD Transportation Center, Longview High School, and the Longview High School Natatorium. This project fits within a broader pattern of district-funded renovations and new construction in the area. The estimated cost of $345,000 is above the county median for renovation and alteration filings in Gregg County, which stands at $250,000. The scheduled build window of 53 days is shorter than the county median of 92 days.

Local Context

The project is situated in ZIP code 75601. U.S. Census American Community Survey five-year estimates for this area indicate a population of about 15,653. The median household income is estimated at $63,279, and the median owner-occupied home value is $193,800. Housing in this area is mostly owner-occupied. Other registered projects in the vicinity include the CHRISTUS Good Shepherd Hospital, the Gregg County Courthouse, and the Longview Museum of Fine Arts. These filings reflect ongoing construction and renovation activity across Gregg County.

Project Registered

Project has been registered with TDLR and is in pre-construction phase

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75601 (Longview)

One email per change. Unsubscribe in one click. Privacy.

Forest Park Middle School Solar is a Renovation/Alteration project located at 1644 North Eastman, Longview, TX 75601 in Longview, Texas. The project has an estimated value of $345K covering 50,000 sq ft. Longview ISD is the property owner. The project was registered with TDLR on August 12, 2025.

Frequently Asked Questions

What is the specific scope of work for Forest Park Middle School?

The scope involves installing racking and modules required for the Solar PV Project. This is classified as a renovation or alteration with an estimated cost of $345,000.

Who is the owner or developer of record for this project?

The owner of record is Longview ISD. The project is registered under the name Forest Park Middle School Solar.

What is the current status of the construction?

The project was registered in August 2025 with a target completion of October 2025. No plan review or inspection has been recorded, so completion is not confirmed in the public record.

How does the cost compare to other projects in Gregg County?

The estimated cost of $345,000 is above the county median of $250,000 for renovation and alteration filings. The $7 per square foot cost is below the county median of $70.

What is Forest Park Middle School Solar?

Forest Park Middle School Solar is a renovation/alteration project at 1644 North Eastman in Longview, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: install racking and modules required for the Solar PV Project

Is Forest Park Middle School Solar open in Longview?

Forest Park Middle School Solar was scheduled to finish construction in Oct 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Forest Park Middle School Solar located?

Forest Park Middle School Solar is located at 1644 North Eastman, Longview, TX, 75601, in Gregg County.

Who is the owner or developer of Forest Park Middle School Solar?

Longview ISD is the property owner/developer of record for Forest Park Middle School Solar, per its TDLR project registration.

How much does Forest Park Middle School Solar cost and how big is it?

Forest Park Middle School Solar has an estimated construction value of $345K and approximately 50,000 square feet (about $7/sqft), based on its TDLR filing.

Scope of Work

install racking and modules required for the Solar PV Project

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1644 North Eastman, Longview, TX, 75601

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75601 (Longview)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Longview?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.