Project intelligenceTDLR TABS2025026796New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Sidewalk additions Roanoke Rd

City of Keller Public Right of Way, Keller, TX, 76248

Construction complete · Jun 2026Project Closed

Sidewalk additions Roanoke Rd is a new construction project at City of Keller Public Right of Way, Keller, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2026). The project has an estimated value of $67K across about 1 sq ft.

Estimated project value
$67K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$67.00K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 27, 2025304 days across supplied datesJun 27, 2026

6 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    5 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    130 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    48 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    64 days after the preceding date shown.

    Source: TDLR filing

    View source record
  6. Project closed · TDLR filing

    The project record was closed in TDLR.

    57 days after the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76248 (Keller)

One email per change. Unsubscribe in one click. Privacy.

Sidewalk additions Roanoke Rd is a New Construction project located at City of Keller Public Right of Way, Keller, TX 76248 in Keller, Texas. The project has an estimated value of $67K covering 1 sq ft. City of Keller is the property owner and Neel-Schaffer Inc. is the design firm of record. The project was registered with TDLR on August 27, 2025.

Frequently Asked Questions

What is Sidewalk additions Roanoke Rd?

Sidewalk additions Roanoke Rd is a new construction project at City of Keller Public Right of Way in Keller, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of new sidewalk in the City of Keller Public Right of Way along Roanoke Rd from Overton Ridge Park to 1411

Is Sidewalk additions Roanoke Rd open in Keller?

Construction on Sidewalk additions Roanoke Rd is complete — TDLR records show the project passed its required accessibility inspection in Jun 2026. The building is finished and very likely open.

Where is Sidewalk additions Roanoke Rd located?

Sidewalk additions Roanoke Rd is located at City of Keller Public Right of Way, Keller, TX, 76248, in Tarrant County.

Who is the owner or developer of Sidewalk additions Roanoke Rd?

City of Keller is the property owner/developer of record for Sidewalk additions Roanoke Rd, per its TDLR project registration.

Who is the architect or design firm for Sidewalk additions Roanoke Rd?

Neel-Schaffer Inc. is the design firm of record for Sidewalk additions Roanoke Rd, according to its TDLR filing.

How much does Sidewalk additions Roanoke Rd cost and how big is it?

Sidewalk additions Roanoke Rd has an estimated construction value of $67K and approximately 1 square feet (about $67.00K/sqft), based on its TDLR filing.

Scope of Work

Installation of new sidewalk in the City of Keller Public Right of Way along Roanoke Rd from Overton Ridge Park to 1411

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 76248 (Keller)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Tarrant

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists