Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road) in Frisco, TX
Teel Parkway (Fields Parkway to Olive Branch Road), Frisco, TX, 75034
Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road) is a new construction project at Teel Parkway (Fields Parkway to Olive Branch Road), Frisco, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $2.3M across about 100,000 sq ft.
- Estimated project value
- $2.3M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 100,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $23/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
89 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
364 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road)
The Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road) is a new construction project in Frisco, Texas, spanning 100,000 square feet with an estimated cost of $2,261,000. The City of Frisco is the owner of record, and Halff serves as the design firm. The scope includes grading, drainage, roadway pavement, bridge sidewalks, a hike/bike trail, signing, markings, illumination, median landscaping, and irrigation. Construction is scheduled to finish in December 2026, with work starting in December 2025.
TDLR completed plan review in September 2025, establishing the regulatory status for this Federally funded roadway project. Blair Baker is the registered accessibility specialist listed in the filing. The project involves public funds and public land, ensuring compliance with accessibility standards for the new infrastructure.
Project Scale and Cost Context
The estimated cost of $2,261,000 is above the median estimated cost of $900,000 for new construction filings in Denton County. The project size of 100,000 square feet is significantly larger than the county median of 8,040 square feet. However, the cost per square foot of $23 is below the county median of $121 per square foot. The scheduled build window of 364 days is longer than the county median of 219 days for similar projects.
The City of Frisco has six other TDLR-registered projects totaling $123,209,243, including Grand Park Phase 1A and the Frisco Heritage Center. Halff has six other registered projects totaling $22,406,932, such as the Lockhart Aquatics Facility and Buffalo Bayou Greenway. A post by hoodline.com described cranes moving materials past the bridge bottleneck on Teel Parkway, referencing the project’s listing in the Texas Department of Licensing and Regulation registry.
U.S. Census ACS 2023 five-year estimates for ZIP 75034 indicate a population of about 51,059 and a median household income of $107,945. The area includes 23,836 housing units, with housing mostly renter-occupied. Denton County unemployment was 4.3 percent in July 2026, higher than a year earlier. These demographic and economic factors provide context for the community served by the new Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road) infrastructure.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75034 (Frisco)
One email per change. Unsubscribe in one click. Privacy.
Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road) is a New Construction project located at Teel Parkway (Fields Parkway to Olive Branch Road), Frisco, TX 75034 in Frisco, Texas. The project has an estimated value of $2.3M covering 100,000 sq ft. City of Frisco is the property owner and Halff is the design firm of record. The project was registered with TDLR on September 10, 2025.
Frequently Asked Questions
When will the Teel Parkway bridge construction be finished?
Construction is scheduled to finish in December 2026. Work is set to start in December 2025, following the completion of plan review in September 2025.
Who is designing the Teel Parkway NB Bridge project?
Halff is the design firm of record for this project. Blair Baker is the registered accessibility specialist listed in the TDLR filing.
What is included in the scope of work for this bridge?
The scope includes grading, drainage, roadway pavement, bridge sidewalks, a hike/bike trail, signing, markings, illumination, median landscaping, and irrigation for Teel Parkway.
Is the Teel Parkway bridge open to traffic?
The TDLR record indicates construction is scheduled to finish in December 2026. The filing does not state that the bridge is open or operating.
How does this project's cost compare to other Frisco projects?
The estimated cost of $2,261,000 is above the Denton County median for new construction. The City of Frisco has six other registered projects totaling over $123 million.
What is Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road)?
Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road) is a new construction project at Teel Parkway (Fields Parkway to Olive Branch Road) in Frisco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of grading, drainage, roadway pavement, bridge sidewalks, hike/bike trail, signing, markings, illumination, median landscaping and irrigation for Teel Parkway
Is Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road) open in Frisco?
Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road) is still under construction in Frisco, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road) located?
Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road) is located at Teel Parkway (Fields Parkway to Olive Branch Road), Frisco, TX, 75034, in Denton County.
Who is the owner or developer of Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road)?
City of Frisco is the property owner/developer of record for Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road), per its TDLR project registration.
Who is the architect or design firm for Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road)?
Halff is the design firm of record for Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road), according to its TDLR filing.
How much does Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road) cost and how big is it?
Teel Parkway NB Bridge (Fields Parkway to Olive Branch Road) has an estimated construction value of $2.3M and approximately 100,000 square feet (about $23/sqft), based on its TDLR filing.
Scope of Work
Construction of grading, drainage, roadway pavement, bridge sidewalks, hike/bike trail, signing, markings, illumination, median landscaping and irrigation for Teel Parkway
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Teel Parkway (Fields Parkway to Olive Branch Road), Frisco, TX, 75034
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$734.2M totalWatch all construction in 75034 (Frisco)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Frisco?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.