Project intelligenceTDLR TABS2026001049Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Phase 15B - Street Reconstruction

Adams Drive, Hawse Drive and Pemberton Lane, The Colony, TX, 75056

Opening ~Jun 2027Review Complete

Phase 15B - Street Reconstruction is a renovation/alteration project at Adams Drive, Hawse Drive and Pemberton Lane, The Colony, in Denton County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $397K across about 75,000 sq ft.

Estimated project value
$397K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
75,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$5/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 8mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 16, 2025633 days across supplied datesJun 11, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    48 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    585 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Phase 15B - Street Reconstruction

Phase 15B - Street Reconstruction is a $397,000 renovation and alteration project covering Adams Drive, Hawse Drive, and Pemberton Lane in The Colony, TX 75056. The City of The Colony owns the project, which spans 75,000 square feet of infrastructure. The scope includes 14,031 square feet of 6-inch concrete pavement, 26,933 square feet of reinforced concrete driveways, and 37,589 square feet of 4-inch reinforced concrete. This work involves public funds and land, and the project is registered with TDLR.

Halff is the design firm of record, and Blair Baker serves as the registered accessibility specialist. TDLR completed plan review in September 2025, with the status listed as Review Complete. Construction is scheduled to begin in November 2025. The filing indicates the project is scheduled to finish in June 2027.

Project Scale and Cost

The estimated cost of $397,000 is above the Denton County median of $235,000 for similar renovation and alteration filings. The total area of 75,000 square feet exceeds the county median of 3,388 square feet for this work type. The computed cost per square foot is $5, which is below the county median of $80. The scheduled build window of 585 days is longer than the county median of 92 days for comparable projects.

The City of The Colony has four other TDLR-registered projects totaling $11,905,000. Halff has designed six other TDLR-registered projects totaling $23,410,000, including trail connections in Garland and greenways in Houston. Phase 15B - Street Reconstruction fits within this broader portfolio of municipal infrastructure work.

Local Context

ZIP code 75056 has a population of about 67,978 and a median household income of $116,806, according to U.S. Census ACS 2023 five-year estimates. The median owner-occupied home value is $414,600. Housing in the area is mostly owner-occupied, with 28,102 housing units. The Denton County unemployment rate was 4.3 percent in July 2026, higher than a year earlier. This street reconstruction supports the infrastructure needs of this established residential community.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75056 (The Colony)

One email per change. Unsubscribe in one click. Privacy.

Phase 15B - Street Reconstruction is a Renovation/Alteration project located at Adams Drive, Hawse Drive and Pemberton Lane, The Colony, TX 75056 in The Colony, Texas. The project has an estimated value of $397K covering 75,000 sq ft. The City of The Colony is the property owner and Halff is the design firm of record. The project was registered with TDLR on September 16, 2025.

Frequently Asked Questions

When will Phase 15B - Street Reconstruction be finished?

The project is scheduled to finish in June 2027. Construction is set to start in November 2025, following plan review completion in September 2025.

Who is building Phase 15B - Street Reconstruction?

The City of The Colony is the owner of record. Halff is the design firm, and Blair Baker is the registered accessibility specialist.

How much does Phase 15B - Street Reconstruction cost?

The estimated cost is $397,000. This amount is above the Denton County median for renovation and alteration projects, which is $235,000.

What streets are included in Phase 15B - Street Reconstruction?

The project covers Adams Drive, Hawse Drive, and Pemberton Lane in The Colony, TX 75056. It includes concrete pavement and driveway improvements.

Is Phase 15B - Street Reconstruction funded by public money?

Yes, the filing states the project involves public funds, public land, or is a Federally funded roadway project.

What is Phase 15B - Street Reconstruction?

Phase 15B - Street Reconstruction is a renovation/alteration project at Adams Drive, Hawse Drive and Pemberton Lane in The Colony, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Infrastructure improvements, streets reconstruction for Adams Drive, Hawse Drive and Pemberton Lane. The entire project consist of 14,031 SF of 6-inch concrete pavement, 26,933 SF of reinforced concrete driveways and 37,589 SF of 4-inch…

Is Phase 15B - Street Reconstruction open in The Colony?

Phase 15B - Street Reconstruction is still under construction in The Colony, TX, with an estimated completion of Jun 2027 according to its TDLR registration.

Where is Phase 15B - Street Reconstruction located?

Phase 15B - Street Reconstruction is located at Adams Drive, Hawse Drive and Pemberton Lane, The Colony, TX, 75056, in Denton County.

Who is the owner or developer of Phase 15B - Street Reconstruction?

The City of The Colony is the property owner/developer of record for Phase 15B - Street Reconstruction, per its TDLR project registration.

Who is the architect or design firm for Phase 15B - Street Reconstruction?

Halff is the design firm of record for Phase 15B - Street Reconstruction, according to its TDLR filing.

How much does Phase 15B - Street Reconstruction cost and how big is it?

Phase 15B - Street Reconstruction has an estimated construction value of $397K and approximately 75,000 square feet (about $5/sqft), based on its TDLR filing.

Scope of Work

Infrastructure improvements, streets reconstruction for Adams Drive, Hawse Drive and Pemberton Lane. The entire project consist of 14,031 SF of 6-inch concrete pavement, 26,933 SF of reinforced concrete driveways and 37,589 SF of 4-inch reinforced co

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Adams Drive, Hawse Drive and Pemberton Lane, The Colony, TX, 75056

Location by street address

Watch all construction in 75056 (The Colony)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in The Colony?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.