Project intelligenceTDLR TABS2026001912Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

RMP3 DFW - Gate A18 Restroom Renovations in Dfw Airport, TX

2024 S. International Parkway, Dfw Airport, TX, 75261

Construction complete · Sep 2026Inspection Complete

RMP3 DFW - Gate A18 Restroom Renovations is a renovation/alteration project at 2024 S. International Parkway, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2026). The project has an estimated value of $4.0M across about 3,000 sq ft.

Estimated project value
$4.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1.33K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 26, 2025348 days across supplied datesSep 9, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    78 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    2 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    136 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    132 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About RMP3 DFW - Gate A18 Restroom Renovations

The restroom renovation in Terminal A at DFW International Airport is complete. The project, filed as RMP3 DFW - Gate A18 Restroom Renovations, involved the renovation and alteration of 3,000 square feet of public restroom space within the terminal. The work was registered with the Texas Department of Licensing and Regulation (TDLR) in September 2025, and the record now shows that the building passed its final TDLR accessibility inspection in September 2026.

DFW Airport, the owner of record, invested an estimated $4,000,000 in this specific upgrade. This cost translates to $1,333 per square foot, a figure that places the project well above the Tarrant County median of $79 per square foot for similar renovation filings. The total investment also exceeds the county median estimated cost of $250,000 for renovation and alteration projects, situating this work in the top quarter of financial scale for its type in the region.

Design and Construction Details

Cannon Design, Inc. served as the design firm of record for the project. The registered accessibility specialist was Christopher R Hinkle. Construction began in December 2025, following the completion of plan review in the same month. The scheduled build window was 136 days, which is longer than the Tarrant County median of 92 days for comparable projects. The final inspection was successfully passed in September 2026, confirming that the physical work met the required standards.

This project is part of a larger portfolio of infrastructure work at the airport. DFW Airport has six other TDLR-registered projects totaling $113,630,000, including significant renovations to Terminal C and Terminal E. Cannon Design, Inc. has also handled four other registered projects totaling $13,550,000, including renovations at Terminals D, A, and E, as well as a project at 3100 McKinnon Street in Dallas.

The location is at 2024 S. International Parkway in the DFW Airport area of Tarrant County. The project involved public funds and public land, consistent with the airport's operational status. Nearby businesses include the Hyatt Regency DFW International Airport, the Grand Hyatt DFW, and the American Airlines Priority Parcel Facility. The completion of this renovation marks the end of the construction phase for this specific scope of work at Gate A18.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75261 (Dfw Airport)

One email per change. Unsubscribe in one click. Privacy.

RMP3 DFW - Gate A18 Restroom Renovations is a Renovation/Alteration project located at 2024 S. International Parkway, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $4.0M covering 3,000 sq ft. DFW Airport is the property owner and Cannon Design, Inc. is the design firm of record. The project was registered with TDLR on September 26, 2025.

Frequently Asked Questions

Is the restroom renovation finished?

Yes, the project is complete. The TDLR record indicates that the building passed its final TDLR accessibility inspection in September 2026, confirming that construction has concluded.

How much did the Terminal A restroom renovation cost?

The estimated cost for the 3,000 square foot renovation was $4,000,000. This equates to $1,333 per square foot, which is significantly higher than the Tarrant County median for similar projects.

Who designed the Gate A18 restroom renovations?

Cannon Design, Inc. was the design firm of record. Christopher R Hinkle served as the registered accessibility specialist for the project, which was owned by DFW Airport.

When did construction start and end?

Construction began in December 2025. The project passed its final TDLR accessibility inspection in September 2026, marking the completion of the work.

What is RMP3 DFW - Gate A18 Restroom Renovations?

RMP3 DFW - Gate A18 Restroom Renovations is a renovation/alteration project at 2024 S. International Parkway in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Terminal A public restroom renovations and upgrades - 3,000 SF

Is RMP3 DFW - Gate A18 Restroom Renovations open in Dfw Airport?

Construction on RMP3 DFW - Gate A18 Restroom Renovations is complete — TDLR records show the project passed its required accessibility inspection in Sep 2026. The building is finished and very likely open.

Where is RMP3 DFW - Gate A18 Restroom Renovations located?

RMP3 DFW - Gate A18 Restroom Renovations is located at 2024 S. International Parkway, Dfw Airport, TX, 75261, in Tarrant County.

Who is the owner or developer of RMP3 DFW - Gate A18 Restroom Renovations?

DFW Airport is the property owner/developer of record for RMP3 DFW - Gate A18 Restroom Renovations, per its TDLR project registration.

Who is the architect or design firm for RMP3 DFW - Gate A18 Restroom Renovations?

Cannon Design, Inc. is the design firm of record for RMP3 DFW - Gate A18 Restroom Renovations, according to its TDLR filing.

How much does RMP3 DFW - Gate A18 Restroom Renovations cost and how big is it?

RMP3 DFW - Gate A18 Restroom Renovations has an estimated construction value of $4.0M and approximately 3,000 square feet (about $1.33K/sqft), based on its TDLR filing.

Scope of Work

Terminal A public restroom renovations and upgrades - 3,000 SF

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2024 S. International Parkway, Dfw Airport, TX, 75261

Location by street address

Watch all construction in 75261 (Dfw Airport)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Dfw Airport?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.