GE Aerospace in Dfw Airport, TX
3001 West Airfield Drive Suite 100, Dfw Airport, TX, 75261
GE Aerospace is a renovation/alteration project at 3001 West Airfield Drive Suite 100, Dfw Airport, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2025 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $165K across about 20,000 sq ft.
- Estimated project value
- $165K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 20,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $8/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
21 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
53 days after the preceding date shown.
Source: TDLR filing
View source record
📰About GE Aerospace
GE Aerospace is undergoing a renovation at 3001 West Airfield Drive Suite 100 in Dfw Airport, Tarrant County. The project involves the installation of high-pile racking within a 20,000 sq ft space. LIT Industrial is the owner of record, and the work is privately funded for private use. The specific scope is limited to this racking installation, which is a common alteration for logistics and storage operations.
The estimated cost for this alteration is $165,000, which calculates to $8 per square foot. This figure is below the county median of $79 per square foot for similar renovation filings in Tarrant County. The total estimated cost is also below the county median of $250,000 for this type of work. These figures place the project in the lower range of costs for comparable industrial renovations in the area.
Design and Construction Timeline
Seizmic Inc. serves as the design firm of record for this project. The scheduled build window is 74 days, which is close to the county median of 92 days for renovation projects. Construction was scheduled to begin in October 2025, following the completion of plan review in the same month. The filing listed a completion date of December 2025. This timeline suggests a focused, rapid installation process typical for racking systems.
Blair Baker is the registered accessibility specialist associated with this filing. The project was registered with TDLR in October 2025. While the planned completion date has passed, TDLR has not yet recorded a final inspection. Therefore, the current state of the site is not confirmed in the public record. Readers should note that the absence of a final inspection means the work may still be in progress or pending verification.
Seizmic Inc. has other TDLR-registered projects in Texas, including work for Pactiv in Temple and Post Oak Logistics in Houston. This GE Aerospace project is one of several recent filings by the firm. The local labor market in Tarrant County shows an unemployment rate of 4.6 percent . This context helps situate the project within the broader economic activity of the region.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75261 (Dfw Airport)
One email per change. Unsubscribe in one click. Privacy.
GE Aerospace is a Renovation/Alteration project located at 3001 West Airfield Drive Suite 100, Dfw Airport, TX 75261 in Dfw Airport, Texas. The project has an estimated value of $165K covering 20,000 sq ft. LIT Industrial is the property owner and Seizmic Inc. is the design firm of record. The project was registered with TDLR on October 27, 2025.
Frequently Asked Questions
What is the scope of work for this project?
The filing specifies the installation of high-pile racking. It is classified as a renovation or alteration project.
Who is the owner of the property?
LIT Industrial is the owner of record for this project at 3001 West Airfield Drive Suite 100.
Is the renovation complete?
TDLR has not yet recorded a final inspection. The scheduled completion date was December 2025, but the current status is unconfirmed in the public record.
How much did this project cost?
The estimated cost is $165,000. This equates to $8 per square foot for the 20,000 sq ft space.
Who designed this project?
Seizmic Inc. is the design firm of record for this renovation at Dfw Airport.
What is GE Aerospace?
GE Aerospace is a renovation/alteration project at 3001 West Airfield Drive Suite 100 in Dfw Airport, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of high-pile racking
Is GE Aerospace open in Dfw Airport?
GE Aerospace was scheduled to finish construction in Dec 2025 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is GE Aerospace located?
GE Aerospace is located at 3001 West Airfield Drive Suite 100, Dfw Airport, TX, 75261, in Tarrant County.
Who is the owner or developer of GE Aerospace?
LIT Industrial is the property owner/developer of record for GE Aerospace, per its TDLR project registration.
Who is the architect or design firm for GE Aerospace?
Seizmic Inc. is the design firm of record for GE Aerospace, according to its TDLR filing.
How much does GE Aerospace cost and how big is it?
GE Aerospace has an estimated construction value of $165K and approximately 20,000 square feet (about $8/sqft), based on its TDLR filing.
Scope of Work
Installation of high-pile racking
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
3001 West Airfield Drive Suite 100, Dfw Airport, TX, 75261
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Watch all construction in 75261 (Dfw Airport)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Dfw Airport?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.