Project intelligenceTDLR TABS2026004622Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Project

19801 Gulf Freeway, Suite 110, Webster, TX, 77598

Target date passed (Jun 2026)Review Complete

Project is a renovation/alteration project at 19801 Gulf Freeway, Suite 110, Webster, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $16.5M across about 93,035 sq ft.

Estimated project value
$16.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
93,035 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$177/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 30, 2025334 days across supplied datesSep 29, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    67 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    170 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    97 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Project

The Center at Baybrook in Webster is undergoing a $16,500,000 renovation of 93,035 square feet of interior space. Located at 19801 Gulf Freeway, Suite 110, the project is registered with the Texas Department of Licensing and Regulation (TDLR) under the filing name Project Webster. The work involves significant interior improvements, including minor demolition, new partitions, and updated ceiling and lighting systems for new workrooms.

Ware Malcomb is the design firm of record for this alteration. The scope of work includes the installation of new plumbing fixtures and a reconfigured showroom layout with dedicated display and storage areas. A kitchen featuring a sitting and serving area is also part of the renovation. This project is privately funded on private land for private use, with Price/Baybrook LTD. c/o Kimco Realty listed as the owner of record.

Timeline and Status

Construction was scheduled to begin in January 2026, with a planned completion date of June 2026. TDLR completed the plan review process in September 2026. However, the agency has not yet recorded a final inspection. Consequently, the current physical state of the site is not confirmed in the public record, and the project's operational status remains unverified by the licensing body.

The estimated cost of $177 per square foot is above the Harris County median of $80 per square foot for similar renovation and alteration filings. The scheduled build window of 170 days is longer than the county median of 92 days. This project is one of several registered renovations in the immediate area, which includes other commercial alterations in the Webster and Clear Lake vicinity.

Kimco Realty’s website describes the Center at Baybrook as a 363,830-square-foot shopping center fronting I-45. The City of Webster’s official site notes the property is strategically located within the city’s vibrant retail and medical service area. These third-party descriptions provide context for the location, though they do not confirm the specific status of this interior renovation.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77598 (Webster)

One email per change. Unsubscribe in one click. Privacy.

Project is a Renovation/Alteration project located at 19801 Gulf Freeway, Suite 110, Webster, TX 77598 in Webster, Texas. The project has an estimated value of $16.5M covering 93,035 sq ft. Price/Baybrook LTD. c/o Kimco Realty is the property owner and Ware Malcomb is the design firm of record. The project was registered with TDLR on October 30, 2025.

Frequently Asked Questions

Is the Center at Baybrook renovation finished?

TDLR completed plan review in September 2026 but has not yet recorded a final inspection. The scheduled completion date was June 2026, but the public record does not confirm the site's current physical state.

Who is designing the new interior?

Ware Malcomb is the design firm of record for the Project Webster filing. They are responsible for the architectural and interior design aspects of the 93,035-square-foot renovation.

What is the total cost of the project?

The estimated cost for the renovation is $16,500,000. This equates to approximately $177 per square foot for the 93,035 square feet of interior improvement work.

What specific work is included in the scope?

The scope includes minor demolition, new partitions, new ceiling and lighting, new plumbing fixtures, and a new showroom layout with display and storage areas, plus a kitchen with a serving area.

What is Project?

Project is a renovation/alteration project at 19801 Gulf Freeway, Suite 110 in Webster, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 93035 of interior improvement. Renovation includes minor demolition work, new partitions, new ceiling and lighting at new workrooms, new plumbing fixtures and new showroom layout display and storage area. Kitchen with sitting and serving…

Is Project open in Webster?

Project was scheduled to finish construction in Jun 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Project located?

Project is located at 19801 Gulf Freeway, Suite 110, Webster, TX, 77598, in Harris County.

Who is the owner or developer of Project?

Price/Baybrook LTD. c/o Kimco Realty is the property owner/developer of record for Project, per its TDLR project registration.

Who is the architect or design firm for Project?

Ware Malcomb is the design firm of record for Project, according to its TDLR filing.

How much does Project cost and how big is it?

Project has an estimated construction value of $16.5M and approximately 93,035 square feet (about $177/sqft), based on its TDLR filing.

Scope of Work

93035 of interior improvement. Renovation includes minor demolition work, new partitions, new ceiling and lighting at new workrooms, new plumbing fixtures and new showroom layout display and storage area. Kitchen with sitting and serving area

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

19801 Gulf Freeway, Suite 110, Webster, TX, 77598

Location by street address

Watch all construction in 77598 (Webster)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.