Funding type
This project is privately funded, on private land for private use.
Costco Wylie, TX - Fuel Center
2002 W Kirby St, Wylie, TX, 75098
Costco Wylie, TX - Fuel Center is a new construction project at 2002 W Kirby St, Wylie, in Collin County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $2.1M across about 165,000 sq ft.
- Estimated project value
- $2.1M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 165,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $13/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 10 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
33 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
298 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Costco Wylie, TX - Fuel Center
A new Costco warehouse is under construction at 2002 W Kirby St in Wylie, Texas. The project involves the new construction of a steel structure retail store with a footprint of 165,000 square feet. This development is part of a larger filing described as the Costco Wylie, TX - Fuel Center, though the specific work covered here is the warehouse building itself.
The owner of record for this project is the Wylie Economic Development Corporation. Ware Malcomb serves as the design firm of record, overseeing the architectural and engineering aspects of the build. The estimated cost for this specific phase of construction is $2,076,020, which calculates to approximately $13 per square foot. This cost figure is below the Collin County median of $120 per square foot for similar new construction filings, though the total project scale is significantly larger than the county median size of 7,048 square feet.
Project Status and Timeline
The project was registered with TDLR in September 2026. According to the filing, plan review is pending, and construction is targeted for August 2027. The scheduled build window is 298 days, which is longer than the Collin County median scheduled build window of 212 days for new construction projects.
David C Deming is the registered accessibility specialist for this project. The funding source is private, situated on private land for private use. The Wylie Economic Development Corporation has other TDLR-registered projects, including a separate Costco entry in Wylie valued at $40,186,744, which is also in project registered status. Ware Malcomb has designed six other TDLR-registered projects, ranging from industrial buildings in Del Valle to residential developments in Plano.
Local Context
Wylie is located in Collin County, a region with a population of approximately 67,513 residents in the 75098 ZIP code area. The median household income in this area is estimated at $115,587, and the median owner-occupied home value is $362,900. The Collin County unemployment rate was 4.6 percent in July 2026, which is higher than the rate recorded a year earlier. This development represents a significant retail addition to the Wylie commercial landscape, with the warehouse structure forming the core of the new facility.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75098 (Wylie)
One email per change. Unsubscribe in one click. Privacy.
Costco Wylie, TX - Fuel Center is a New Construction project located at 2002 W Kirby St, Wylie, TX 75098 in Wylie, Texas. The project has an estimated value of $2.1M covering 165,000 sq ft. WYLIE ECONOMIC DEVELOPMENT CORPORATION is the property owner and Ware Malcomb is the design firm of record. The project was registered with TDLR on September 9, 2026.
Frequently Asked Questions
Is the Costco in Wylie open?
No, the store is not open. The TDLR record shows the project is in the construction phase, with plan review pending and completion targeted for August 2027.
How big is the new Costco warehouse?
The new Costco warehouse in Wylie is 165,000 square feet. This is significantly larger than the median new construction size in Collin County, which is 7,048 square feet.
Who is building the Costco in Wylie?
The owner of record is the Wylie Economic Development Corporation. The design firm of record is Ware Malcomb. David C Deming is the registered accessibility specialist.
What is the estimated cost of the project?
The estimated cost for the warehouse construction is $2,076,020. This translates to approximately $13 per square foot, which is below the Collin County median of $120 per square foot.
When will the construction be finished?
The project was registered with TDLR in September 2026, and the completion date on the filing is targeted for August 2027.
What is Costco Wylie, TX - Fuel Center?
Costco Wylie, TX - Fuel Center is a new construction project at 2002 W Kirby St in Wylie, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New Costco Warehouse (the retail store) steel structure, roughly 165,000 sf
Is Costco Wylie, TX - Fuel Center open in Wylie?
Costco Wylie, TX - Fuel Center is still under construction in Wylie, TX, with an estimated completion of Aug 2027 according to its TDLR registration.
Where is Costco Wylie, TX - Fuel Center located?
Costco Wylie, TX - Fuel Center is located at 2002 W Kirby St, Wylie, TX, 75098, in Collin County.
Who is the owner or developer of Costco Wylie, TX - Fuel Center?
WYLIE ECONOMIC DEVELOPMENT CORPORATION is the property owner/developer of record for Costco Wylie, TX - Fuel Center, per its TDLR project registration.
Who is the architect or design firm for Costco Wylie, TX - Fuel Center?
Ware Malcomb is the design firm of record for Costco Wylie, TX - Fuel Center, according to its TDLR filing.
How much does Costco Wylie, TX - Fuel Center cost and how big is it?
Costco Wylie, TX - Fuel Center has an estimated construction value of $2.1M and approximately 165,000 square feet (about $13/sqft), based on its TDLR filing.
Scope of Work
New Costco Warehouse (the retail store) steel structure, roughly 165,000 sf
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2002 W Kirby St, Wylie, TX, 75098
Related Projects
Same Owner
$42.8M totalWatch all construction in 75098 (Wylie)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Wylie?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.