ECISD PR1&2 - Sam Houston ES

300 E 37th St, Odessa, TX, 79762

Construction complete · Oct 2026Inspection Complete

ECISD PR1&2 - Sam Houston ES is a renovation/alteration project at 300 E 37th St, Odessa, in Ector County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $1.7M across about 3,375 sq ft.

Estimated project value
$1.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,375 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$499/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 11, 2025325 days across supplied datesOct 2, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    34 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    3 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    141 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    147 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About ECISD PR1&2 - Sam Houston ES

Sam Houston Elementary School in Odessa, Texas, has completed its renovation work, passing its final TDLR accessibility inspection in October 2026. The project, filed as ECISD PR1&2 - Sam Houston ES, involved specific alterations to the exterior of the school located at 300 E 37th St in Ector County. This marks the conclusion of a construction phase that began in December 2025, with the building now fully inspected and compliant with state accessibility standards.

The scope of work focused on the replacement of above-grade sanitary waste and vent systems, alongside fixes for accessibility issues around the exterior portion of the school. The renovation covered 3,375 square feet of the facility. The estimated cost for these alterations was $1,683,487, resulting in a cost of $499 per square foot. This figure is above the county median of $72 per square foot for similar renovation and alteration filings in Ector County, placing the project in the top quarter of costs for this type of work.

Ector County Independent School District is the owner of record for this project. The design firm of record is Parkhill, which has registered six other projects with TDLR totaling $25,834,885. These other projects include facilities in Lubbock, Midland, and Abilene. The district has six other TDLR-registered projects in Odessa, with a combined value of $2,411,867. These include the Alternative Education Center, New Tech Odessa High School, and Bonham Middle School, among others.

The project utilized public funds, as indicated by the registration details. Julie Ericson Gereda served as the registered accessibility specialist for the filing. The timeline for construction was scheduled for 144 days, which is close to the county median build window of 121 days for renovation projects. Plan review was completed in December 2025, the same month construction started. The completion date listed on the filing was May 2026, but the final inspection did not pass until October 2026, confirming the project's finished status.

This renovation is part of a broader pattern of school infrastructure updates in the region. The area profile for ZIP code 79762 shows a population of about 40,141 residents and a median household income of $74,560. The housing market in this area is mostly owner-occupied, with a median home value of $218,900. The completion of this project adds to the existing educational infrastructure in Odessa, ensuring that the facility meets current accessibility requirements for students and staff.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79762 (Odessa)

One email per change. Unsubscribe in one click. Privacy.

ECISD PR1&2 - Sam Houston ES is a Renovation/Alteration project located at 300 E 37th St, Odessa, TX 79762 in Odessa, Texas. The project has an estimated value of $1.7M covering 3,375 sq ft. Ector County Independent School District is the property owner and Parkhill is the design firm of record. The project was registered with TDLR on November 11, 2025.

Frequently Asked Questions

Is the Sam Houston Elementary School renovation finished?

Yes, the project passed its final TDLR accessibility inspection in October 2026. The construction work, which included sanitary system replacements and exterior accessibility fixes, is complete.

What was the estimated cost of the project?

The estimated cost for the renovation and alteration work was $1,683,487. This amount covers the 3,375 square feet of work performed on the school.

Who is the owner of the school?

The owner of record is the Ector County Independent School District. The design firm of record for the project is Parkhill.

What specific work was done?

The scope included replacing above-grade sanitary waste and vent systems and fixing accessibility issues around the exterior portion of the school building.

When did construction start and finish?

Construction started in December 2025. The final TDLR accessibility inspection was passed in October 2026, marking the completion of the project.

What is ECISD PR1&2 - Sam Houston ES?

ECISD PR1&2 - Sam Houston ES is a renovation/alteration project at 300 E 37th St in Odessa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement of above grade sanitary waste and vent. Fixing accessibility issues around exterior portion of school. 3,375 SF

Is ECISD PR1&2 - Sam Houston ES open in Odessa?

Construction on ECISD PR1&2 - Sam Houston ES is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is ECISD PR1&2 - Sam Houston ES located?

ECISD PR1&2 - Sam Houston ES is located at 300 E 37th St, Odessa, TX, 79762, in Ector County.

Who is the owner or developer of ECISD PR1&2 - Sam Houston ES?

Ector County Independent School District is the property owner/developer of record for ECISD PR1&2 - Sam Houston ES, per its TDLR project registration.

Who is the architect or design firm for ECISD PR1&2 - Sam Houston ES?

Parkhill is the design firm of record for ECISD PR1&2 - Sam Houston ES, according to its TDLR filing.

How much does ECISD PR1&2 - Sam Houston ES cost and how big is it?

ECISD PR1&2 - Sam Houston ES has an estimated construction value of $1.7M and approximately 3,375 square feet (about $499/sqft), based on its TDLR filing.

Scope of Work

Replacement of above grade sanitary waste and vent. Fixing accessibility issues around exterior portion of school. 3,375 SF

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

300 E 37th St, Odessa, TX, 79762

Location by street address

Watch all construction in 79762 (Odessa)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.