Construction complete · Oct 2026Inspection Complete

Gregory-Portland ISD H.S. Parking Lot Improvements is a new construction project at 4601 Wildcat Dr., Portland, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2026). The project has an estimated value of $4.5M across about 218,000 sq ft.

Estimated project value
$4.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
218,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$21/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 2, 2025330 days across supplied datesOct 28, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    9 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    25 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    238 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    58 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Gregory-Portland ISD H.S. Parking Lot Improvements

High School in Portland is a new construction project located at 4601 Wildcat Dr. The filing lists the project name as Gregory-Portland ISD H.S. Parking Lot Improvements. The Gregory-Portland Independent School District is the owner of record. The scope includes parking, walks, drives, storm infrastructure, bleachers, and a turf field. The total size is 218,000 square feet. The estimated cost is $4,500,000. This results in a cost per square foot of $21. This figure is below the county median of $200 per square foot for similar new construction filings in San Patricio County.

Construction Timeline and Status

Construction began in January 2026. The project was registered with TDLR in December 2025. Plan review was completed in December 2025. The building passed its final TDLR accessibility inspection in October 2026, so construction is complete. The TDLR status is Inspection Complete. The scheduled build window of 238 days is close to the county median of 244 days for comparable projects. The completion date on the filing was August 2026, which has passed.

Design and Professional Oversight

LaMarr Womack & Associates, LP served as the design firm of record. Steve R Zoerner is the registered accessibility specialist associated with the project. This design firm has worked on six other TDLR-registered projects totaling $5,736,000. The owner, Gregory-Portland Independent School District, has six other registered projects totaling $15,130,464. These include additions to existing buildings and new construction for other schools in Portland.

This project involves public funds and public land. It is located in ZIP code 78374. The U.S. Census ACS 2023 five-year estimates report a population of about 20,152. The median household income is $81,580. There are 8,426 housing units in the area. The median owner-occupied home value is $225,800. Housing in the ZIP code is mostly owner-occupied. San Patricio County unemployment rate (FRED, August 2026): 5.3 percent, lower than a year earlier. The site is near Ray Akins Wildcat Stadium, First United Methodist Church, and Methodist Day School.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78374 (Portland)

One email per change. Unsubscribe in one click. Privacy.

Gregory-Portland ISD H.S. Parking Lot Improvements is a New Construction project located at 4601 Wildcat Dr., Portland, TX 78374 in Portland, Texas. The project has an estimated value of $4.5M covering 218,000 sq ft. Gregory-Portland Independent School District is the property owner and LaMarr Womack & Associates, LP is the design firm of record. The project was registered with TDLR on December 2, 2025.

Frequently Asked Questions

What is the total cost of the High School project?

The estimated cost for the project is $4,500,000. This covers 218,000 square feet of new construction including parking, storm infrastructure, bleachers, and a turf field.

Who is the design firm for this Portland project?

LaMarr Womack & Associates, LP is the design firm of record. Steve R Zoerner is the registered accessibility specialist for the Gregory-Portland Independent School District project.

When did construction start and finish?

Construction started in January 2026. The project passed its final TDLR accessibility inspection in October 2026, marking the completion of the construction phase.

Is the facility open to the public?

The TDLR record covers construction only and does not record whether the business has started serving customers. The inspection is complete, but operational status is not in the filing.

How does this project compare to other San Patricio County new constructions?

The cost per square foot of $21 is below the county median of $200. The total cost of $4,500,000 is above the county median of $1,100,000 for its type.

What is Gregory-Portland ISD H.S. Parking Lot Improvements?

Gregory-Portland ISD H.S. Parking Lot Improvements is a new construction project at 4601 Wildcat Dr. in Portland, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Parking, walks, drives and storm, bleachers and turf field 218,000 SF

Is Gregory-Portland ISD H.S. Parking Lot Improvements open in Portland?

Construction on Gregory-Portland ISD H.S. Parking Lot Improvements is complete — TDLR records show the project passed its required accessibility inspection in Oct 2026. The building is finished and very likely open.

Where is Gregory-Portland ISD H.S. Parking Lot Improvements located?

Gregory-Portland ISD H.S. Parking Lot Improvements is located at 4601 Wildcat Dr., Portland, TX, 78374, in San Patricio County.

Who is the owner or developer of Gregory-Portland ISD H.S. Parking Lot Improvements?

Gregory-Portland Independent School District is the property owner/developer of record for Gregory-Portland ISD H.S. Parking Lot Improvements, per its TDLR project registration.

Who is the architect or design firm for Gregory-Portland ISD H.S. Parking Lot Improvements?

LaMarr Womack & Associates, LP is the design firm of record for Gregory-Portland ISD H.S. Parking Lot Improvements, according to its TDLR filing.

How much does Gregory-Portland ISD H.S. Parking Lot Improvements cost and how big is it?

Gregory-Portland ISD H.S. Parking Lot Improvements has an estimated construction value of $4.5M and approximately 218,000 square feet (about $21/sqft), based on its TDLR filing.

Scope of Work

Parking, walks, drives and storm, bleachers and turf field 218,000 SF

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

4601 Wildcat Dr., Portland, TX, 78374

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 78374 (Portland)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Portland?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.