Funding type
This project is privately funded, on private land for private use.
SAS FAB2 SiF4 Distribution in Austin, TX
12100 Samsung Blvd, Austin, TX, 78754
SAS FAB2 SiF4 Distribution is a renovation/alteration project at 12100 Samsung Blvd, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2026). The project has an estimated value of $3.8M across about 3,207 sq ft.
- Estimated project value
- $3.8M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 3,207 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.17K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
5 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
20 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
11 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
28 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
123 days after the preceding date shown.
Source: TDLR filing
View source record
📰About SAS FAB2 SiF4 Distribution
Samsung Austin Semiconductor completed a $3,750,000 renovation at 12100 Samsung Blvd, Austin, Texas, on December 12, 2025. The project, registered with TDLR as "SAS FAB2 SiF4 Distribution," involved specific upgrades to the FAB2 facility. Construction is fully complete, with the building passing its final TDLR accessibility inspection in February 2026.
The scope of work focused on precision gas handling and distribution within the semiconductor manufacturing environment. The filing specifies the installation of a new SiF4 Gas Cabinet within the FAB2 Corrosive/Oxidizer Room. Additionally, a new VMB was installed within the FAB2 CSF area. These alterations covered 3,207 sq ft of the facility, resulting in a cost of $1,169 per square foot.
Project Context and Costs
This renovation represents a significant investment relative to typical local projects. Among 14,967 TDLR-registered renovation filings in Travis County, the median estimated cost is $297,000. This project's cost sits in the top quarter of that range. The scheduled build window of 151 days was longer than the county median of 98 days, reflecting the specialized nature of the work. The per-square-foot cost of $1,169 is substantially above the county median of $103.
Samsung Austin Semiconductor is the owner and developer of record for this project. Fuse Architecture Studio served as the design firm, while Mark S Robinson acted as the registered accessibility specialist. The project is privately funded on private land for private use. This is one of at least six other TDLR-registered projects associated with Samsung Austin Semiconductor, which collectively total $8,942,000 in estimated costs.
City of Austin permit records show at least 25 permits on file at this street address. The 25 most recent permits were issued between August 2024 and March 2026, with declared valuations totaling $9,995,575. These permits include electrical, building, plumbing, and mechanical work. The TDLR record confirms that plan review was completed in January 2026, and construction started in January 2026, concluding with the final inspection in February 2026.
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78754 (Austin)
One email per change. Unsubscribe in one click. Privacy.
SAS FAB2 SiF4 Distribution is a Renovation/Alteration project located at 12100 Samsung Blvd, Austin, TX 78754 in Austin, Texas. The project has an estimated value of $3.8M covering 3,207 sq ft. SAMSUNG AUSTIN SEMICONDUCTOR is the property owner and Fuse Architecture Studio is the design firm of record. The project was registered with TDLR on December 15, 2025.
Frequently Asked Questions
Is the Samsung Austin Semiconductor renovation complete?
Yes, construction is complete. The project passed its final TDLR accessibility inspection in February 2026, and the TDLR status is listed as Inspection Complete.
What specific work was done in the FAB2 area?
The installation of a new SiF4 Gas Cabinet in the Corrosive/Oxidizer Room and a new VMB in the CSF area were completed.
Who designed the Samsung Austin Semiconductor renovation?
Fuse Architecture Studio is the design firm of record for this project, which was registered with TDLR in December 2025.
How much did the renovation cost?
The estimated cost for the renovation was $3,750,000, covering 3,207 square feet of the facility.
What is SAS FAB2 SiF4 Distribution?
SAS FAB2 SiF4 Distribution is a renovation/alteration project at 12100 Samsung Blvd in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of (1) new SiF4 Gas Cabinet within the FAB2 Corrosive/Oxidizer Room and (1) new VMB within the FAB2 CSF area.
Is SAS FAB2 SiF4 Distribution open in Austin?
Construction on SAS FAB2 SiF4 Distribution is complete — TDLR records show the project passed its required accessibility inspection in Feb 2026. The building is finished and very likely open.
Where is SAS FAB2 SiF4 Distribution located?
SAS FAB2 SiF4 Distribution is located at 12100 Samsung Blvd, Austin, TX, 78754, in Travis County.
Who is the owner or developer of SAS FAB2 SiF4 Distribution?
SAMSUNG AUSTIN SEMICONDUCTOR is the property owner/developer of record for SAS FAB2 SiF4 Distribution, per its TDLR project registration.
Who is the architect or design firm for SAS FAB2 SiF4 Distribution?
Fuse Architecture Studio is the design firm of record for SAS FAB2 SiF4 Distribution, according to its TDLR filing.
How much does SAS FAB2 SiF4 Distribution cost and how big is it?
SAS FAB2 SiF4 Distribution has an estimated construction value of $3.8M and approximately 3,207 square feet (about $1.17K/sqft), based on its TDLR filing.
Scope of Work
Installation of (1) new SiF4 Gas Cabinet within the FAB2 Corrosive/Oxidizer Room and (1) new VMB within the FAB2 CSF area.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
12100 Samsung Blvd, Austin, TX, 78754
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$1.60B totalRelated City Permits
Building permits found at or near this location
ETJ Irrigation installation Ref: 2026-053796 W
Installation of a 134x9-0 in-ground concrete pool
Interior remodel existing light manufacturing facility - FAB1 TMAH Replacement - F126-CH01.
Replacement of complete existing central heat and air system with or without duct work hvac change out
Replacement of complete existing central heat and air system with or without duct work HVAC change out is in the hallway of the 4th floor of the main office building. No unit number.
Watch all construction in 78754 (Austin)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Austin?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.