Project intelligenceTDLR TABS2027000140Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install in Austin, TX

12100 Samsung Blvd, Austin, TX, 78754

Opening ~Apr 2027Review Complete

SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install is a renovation/alteration project at 12100 Samsung Blvd, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Apr 2027. The project has an estimated value of $1.7M across about 800 sq ft.

Estimated project value
$1.7M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
800 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$2.13K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
6 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 2, 2026211 days across supplied datesApr 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    27 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    2 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    182 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install

Samsung Austin Semiconductor is undertaking a $1,700,000 renovation at 12100 Samsung Blvd in Austin, Texas. The project, filed as SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install, involves the installation of new gas cabinets and tools within the Fab 2 FSF East Bunker. The scope covers 800 square feet of work, resulting in a calculated cost of $2,125 per square foot. This figure is significantly above the Travis County median of $103 per square foot for similar renovation filings.

Scope and Design

The specific technical work includes adding two new WF6 Gas Cabinets to support a new Metals SNNR04 install. The project also accommodates four TEOS DTLRS, one TEOS LVMB, and new TIOR06 and TIOR10 tools. Fuse Architecture Studio is the design firm of record for this alteration. Mark S Robinson serves as the registered accessibility specialist. The work is privately funded and located on private land for private use.

Samsung Austin Semiconductor has six other TDLR-registered projects in Austin, totaling $7,642,000, all with review complete status. Fuse Architecture Studio has six other registered projects totaling $11,274,000, including work for Applied Materials Building 33 and Ambiq. The surrounding ZIP code 78754 has a median household income of $92,964 and a median owner-occupied home value of $318,900, according to U.S. Census estimates.

Timeline and Status

The project was registered with TDLR in September 2026. Plan review is pending. Construction is scheduled to begin in October 2026. The completion date on the filing is targeted for April 2027. This creates a scheduled build window of 182 days, which is longer than the Travis County median of 98 days for renovation and alteration projects. The TDLR status is listed as Project Registered.

City of Austin permit records show at least 25 permits on file at this street address. The 25 most recent were issued between August 2024 and March 2026. These include 9 electrical permits, 7 building permits, 5 plumbing permits, and 4 mechanical permits. Declared valuations on these permits total $9,995,575. Recent work at the address includes the replacement of steam to hot water heat exchanger skid systems and the construction of steel canopies over existing parking.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78754 (Austin)

One email per change. Unsubscribe in one click. Privacy.

SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install is a Renovation/Alteration project located at 12100 Samsung Blvd, Austin, TX 78754 in Austin, Texas. The project has an estimated value of $1.7M covering 800 sq ft. SAMSUNG AUSTIN SEMICONDUCTOR is the property owner and Fuse Architecture Studio is the design firm of record. The project was registered with TDLR on September 2, 2026.

Frequently Asked Questions

What is the estimated cost of this project?

The estimated cost for the Samsung Austin Semiconductor renovation is $1,700,000. This amount covers the installation of new gas cabinets and tools within the Fab 2 FSF East Bunker.

Who is the design firm for this project?

Fuse Architecture Studio is the design firm of record. Mark S Robinson is the registered accessibility specialist for the project.

When is the project targeted for completion?

The project is targeted for April 2027. Construction is scheduled to start in October 2026, following registration with TDLR in September 2026.

Is the business open to the public?

The TDLR record details construction status and does not indicate public access. The project is privately funded on private land for private use.

What is the square footage of the work?

The scope of work covers 800 square feet. This results in a cost of $2,125 per square foot, which is above the Travis County median.

What is SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install?

SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install is a renovation/alteration project at 12100 Samsung Blvd in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: QTY x2 new WF6 Gas Cabinets in the Fab 2 FSF East Bunker to support QTY x1 new Metals (SNNR04) Install QTY (4) TEOS DTLRS, QTY (1) TEOS LVMB for new TIOR06 + TIOR10 tools.

Is SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install open in Austin?

SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install is still under construction in Austin, TX, with an estimated completion of Apr 2027 according to its TDLR registration.

Where is SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install located?

SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install is located at 12100 Samsung Blvd, Austin, TX, 78754, in Travis County.

Who is the owner or developer of SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install?

SAMSUNG AUSTIN SEMICONDUCTOR is the property owner/developer of record for SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install, per its TDLR project registration.

Who is the architect or design firm for SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install?

Fuse Architecture Studio is the design firm of record for SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install, according to its TDLR filing.

How much does SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install cost and how big is it?

SAS GCS Capa-Up - SSNR04, TIOR06, & TIOR10 Install has an estimated construction value of $1.7M and approximately 800 square feet (about $2.13K/sqft), based on its TDLR filing.

Scope of Work

QTY x2 new WF6 Gas Cabinets in the Fab 2 FSF East Bunker to support QTY x1 new Metals (SNNR04) Install QTY (4) TEOS DTLRS, QTY (1) TEOS LVMB for new TIOR06 + TIOR10 tools.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

12100 Samsung Blvd, Austin, TX, 78754

Loading location map…
30.37563, -97.63712

Related City Permits

Building permits found at or near this location

12100 FENNEC WAY

Installation of a 134x9-0 in-ground concrete pool

ActivePlumbing PermitNewNov 2026
View Details
2026-131629 PP
Local Plumbing Service-DBA Crow's Plumbing Service
12100 FENNEC WAY

Installation of a 134x9-0 in-ground concrete pool

ActiveElectrical PermitNewNov 2026
View Details
2026-131629 EP
LED ES Electric
12100 RUSSO DR

ETJ Irrigation installation Ref: 2026-053796 W

FinalPlumbing PermitIrrigationOct 2026
View Details
2026-133145 PP
12100 FENNEC WAY

Installation of a 134x9-0 in-ground concrete pool

ActiveBuilding PermitNewOct 2026
View Details
2026-131629 BP
Austin Pool Builders
12100 SAMSUNG BLVD BLDG FAB1

Interior remodel existing light manufacturing facility - FAB1 TMAH Replacement - F126-CH01.

ActiveBuilding PermitRemodelSep 2026
View Details
2026-119503 BP
Samsung Engineering and Construction America

Watch all construction in 78754 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.