Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Kitchen Replacement Project in Cedar Park, TX
2900 El Salido Pkwy, Cedar Park, TX, 78613
Kitchen Replacement Project is a renovation/alteration project at 2900 El Salido Pkwy, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $484K across about 1,100 sq ft.
- Estimated project value
- $484K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,100 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $440/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 year
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
27 days after the preceding date shown.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
7 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
344 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Kitchen Replacement Project
Cypress Elementary School in Cedar Park is undergoing a targeted renovation focused on food service infrastructure. The project, filed as the Kitchen Replacement Project, involves the replacement of existing walk-in coolers, freezers, and serving line equipment. This work includes associated mechanical, electrical, and plumbing updates, along with minor architectural patch and repair necessitated by the new equipment installation. The total estimated cost for this scope of work is $484,343.
The renovation covers 1,100 square feet of space at 2900 El Salido Pkwy, Cedar Park, TX 78613. Leander Independent School District is the owner of record for this Williamson County facility. O'Connell Robertson serves as the design firm of record, overseeing the technical aspects of the equipment replacement and system upgrades. The registered accessibility specialist for the project is Kathy Ann Riley.
Construction Timeline and Status
The project was registered with TDLR in December 2025. Plan review was completed in January 2026, and construction is scheduled to finish in December 2026, with work starting January 2026. The TDLR status for this filing is Review Complete. This timeline represents a scheduled build window of 351 days, which is longer than the county median of 92 days for similar renovation and alteration filings in Williamson County.
Financial and Regional Context
The estimated cost of $484,343 places this project above the median estimated cost of $250,000 for renovation and alteration filings in Williamson County. The cost per square foot is $440, which is above the county median of $95 per square foot. Leander Independent School District has six other TDLR-registered projects totaling $2,421,715, including similar kitchen replacement projects at Giddens, Faubion, and Steinar Ranch Elementary Schools, each with the same estimated cost and review complete status.
The design firm, O'Connell Robertson, has been involved in six other TDLR-registered projects totaling $40,984,222. These include large-scale developments such as Plaza Verde in San Angelo and Lasa HS in Austin. The project utilizes public funds, consistent with its status as a school district facility. The surrounding area, ZIP code 78613, has a population of about 89,162 and a median household income of $120,829, according to U.S. Census ACS 2023 five-year estimates.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78613 (Cedar Park)
One email per change. Unsubscribe in one click. Privacy.
Kitchen Replacement Project is a Renovation/Alteration project located at 2900 El Salido Pkwy, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $484K covering 1,100 sq ft. Leander Independent School District is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on December 18, 2025.
Frequently Asked Questions
When is the Cypress Elementary kitchen renovation scheduled to finish?
Construction is scheduled to finish in December 2026. Work started in January 2026 following the completion of plan review in the same month.
Who is the owner of the Cypress Elementary School project?
Leander Independent School District is the owner of record for this renovation project located in Cedar Park, Texas.
What specific equipment is being replaced in the kitchen?
The project involves replacing existing walk-in coolers, freezers, and serving line equipment, including associated mechanical, electrical, and plumbing systems.
How much does this renovation cost compared to other local projects?
The estimated cost is $484,343, which is above the median estimated cost of $250,000 for renovation filings in Williamson County.
Is the Cypress Elementary School building open to the public?
The TDLR record tracks construction status, not business operations. Construction is scheduled to finish in December 2026, but the record does not specify public access dates.
What is Kitchen Replacement Project?
Kitchen Replacement Project is a renovation/alteration project at 2900 El Salido Pkwy in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement of existing walk in cooler / freezer AND/OR serving line equipment; associated mechanical, electrical and plumbing. Minor architectural patch & repair from associated equipment replacement.
Is Kitchen Replacement Project open in Cedar Park?
Kitchen Replacement Project is still under construction in Cedar Park, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is Kitchen Replacement Project located?
Kitchen Replacement Project is located at 2900 El Salido Pkwy, Cedar Park, TX, 78613, in Williamson County.
Who is the owner or developer of Kitchen Replacement Project?
Leander Independent School District is the property owner/developer of record for Kitchen Replacement Project, per its TDLR project registration.
Who is the architect or design firm for Kitchen Replacement Project?
O'Connell Robertson is the design firm of record for Kitchen Replacement Project, according to its TDLR filing.
How much does Kitchen Replacement Project cost and how big is it?
Kitchen Replacement Project has an estimated construction value of $484K and approximately 1,100 square feet (about $440/sqft), based on its TDLR filing.
Scope of Work
Replacement of existing walk in cooler / freezer AND/OR serving line equipment; associated mechanical, electrical and plumbing. Minor architectural patch & repair from associated equipment replacement.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2900 El Salido Pkwy, Cedar Park, TX, 78613
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$596.3M totalRelated City Permits
Building permits found at or near this location
8 x 15 Pool with Autofill and NG Heater
Overview Provide dedicated GFCI protected branch circuit for business neon pole sign. Install wire raceway in hard pipe for entirety of run from exterior panel on Salado St. to sign location on Rio Grande. Details Install IMC on back of lower concrete block wall which runs across restaurants outdoor garden area. Transition to Schedule 80 PVC for approx 20ft under gravel garden pedestrian entrance and then transition back to IMC for remainder of run along block wall terminating at lockable NEMA 3 non-fused disconnect within sight of sign. Sign and pole and equipment will be grounded and bonded per requirements of NEC 600.7. All raceways installed per City and NEC code requirements; terminations will be torqued per manufacturers specifications.
BASE: Installing a backup battery system and additional meter socket.
8 x 15 Pool with Autofill and NG Heater
Install curb and gutter of 99 FT
Watch all construction in 78613 (Cedar Park)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Cedar Park?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.