Project intelligenceTDLR TABS2026008497Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Kitchen Replacement Project

2900 El Salido Pkwy, Cedar Park, TX, 78613

Opening ~Dec 2026Review Complete

Kitchen Replacement Project is a renovation/alteration project at 2900 El Salido Pkwy, Cedar Park, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $484K across about 1,100 sq ft.

Estimated project value
$484K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,100 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$440/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1 year
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 18, 2025378 days across supplied datesDec 31, 2026

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    27 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    7 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    344 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78613 (Cedar Park)

One email per change. Unsubscribe in one click. Privacy.

Kitchen Replacement Project is a Renovation/Alteration project located at 2900 El Salido Pkwy, Cedar Park, TX 78613 in Cedar Park, Texas. The project has an estimated value of $484K covering 1,100 sq ft. Leander Independent School District is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on December 18, 2025.

Frequently Asked Questions

What is Kitchen Replacement Project?

Kitchen Replacement Project is a renovation/alteration project at 2900 El Salido Pkwy in Cedar Park, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement of existing walk in cooler / freezer AND/OR serving line equipment; associated mechanical, electrical and plumbing. Minor architectural patch & repair from associated equipment replacement.

Is Kitchen Replacement Project open in Cedar Park?

Kitchen Replacement Project is still under construction in Cedar Park, TX, with an estimated completion of Dec 2026 according to its TDLR registration.

Where is Kitchen Replacement Project located?

Kitchen Replacement Project is located at 2900 El Salido Pkwy, Cedar Park, TX, 78613, in Williamson County.

Who is the owner or developer of Kitchen Replacement Project?

Leander Independent School District is the property owner/developer of record for Kitchen Replacement Project, per its TDLR project registration.

Who is the architect or design firm for Kitchen Replacement Project?

O'Connell Robertson is the design firm of record for Kitchen Replacement Project, according to its TDLR filing.

How much does Kitchen Replacement Project cost and how big is it?

Kitchen Replacement Project has an estimated construction value of $484K and approximately 1,100 square feet (about $440/sqft), based on its TDLR filing.

Scope of Work

Replacement of existing walk in cooler / freezer AND/OR serving line equipment; associated mechanical, electrical and plumbing. Minor architectural patch & repair from associated equipment replacement.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2900 El Salido Pkwy, Cedar Park, TX, 78613

Location by street address

Related City Permits

Building permits found at or near this location

2900-2915 OAKMONT BLVD

Install curb and gutter of 99 FT

ActiveDriveway / SidewalksNewSep 2026
View Details
2026-109787 DS
2900 SUNRIDGE DR BLDG 9

Pier installation to stabilize concrete pad.

ActiveBuilding PermitRemodelSep 2026
View Details
2026-113124 BP
Camp Facility Services
2900 SUNRIDGE DR BLDG 15

Pier installation to stabilize concrete pad. Existing multifamily.

ActiveBuilding PermitRemodelSep 2026
View Details
2026-113101 BP
Camp Facility Services
2900 WADSWORTH WAY

Replacement of complete existing central heat and air system with or without duct work

FinalMechanical PermitChange OutAug 2026
View Details
2026-098796 MP
Alamo Austin Air Conditioning & Heating Inc
2900 OLIVARIS BLVD BLDG CP13

ePlan: Expedited Review - New Carport (846 SF)

ActiveElectrical PermitNewJul 2026
View Details
2024-000521 EP
MSF Electric, Inc.

Watch all construction in 78613 (Cedar Park)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Cedar Park?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.