Zabalist
ZabalistTexas Construction
๐Ÿ  Home
๐Ÿ“‹ Directory
๐Ÿ’Ž Pricing๐Ÿ“Š Data
Sign InCreate Account
Zabalist
ZabalistTexas Construction

The most comprehensive Texas construction intelligence platform. Search verified contractors, track permits, and explore projects across the state.

โœ“ Verified DataFree to Search

Directory

  • Contractors
  • Builders
  • Architects
  • Developers
  • Property Owners

Construction Data

  • Building Permits
  • State Projects
  • Site Plans
  • Texas RFPs & Bids
  • Browse by City
  • Browse by County

Free Tools

  • Contractor License Lookup
  • Permit Cost Estimator
  • Free Contractor Badges
  • About Zabalist
  • Contact Us

ยฉ 2026 Smart Austin LLC d/b/a Moon Sherpa Labs. All rights reserved.

TermsPrivacyCookiesDo Not SellAccessibilityDMCAData Sources
Data from verified public sources. Not affiliated with any government agency.
  1. Home
  2. /
  3. Projects
  4. /
  5. Williamson
Opening ~Dec 2026๐Ÿ“Review Complete๐Ÿ”ง Renovation/Alteration๐Ÿ’ต This project involves public funds, public land, or is a Federally funded roadway project.

Kitchen Replacement Project

300 WEST STREET S (410 S West Dr), Leander, TX 78641, Leander, TX, 78641
Construction50%

๐Ÿ“ŠProject Metrics

TDLR #TABS2026008502
$484K
Project Value
1,100
Square Feet
$440/sqft
Cost/SqFt
1 year
Duration
Registered:Dec 18, 2025
Start:Jan 14, 2026
Target:Dec 31, 2026
Remaining:195 days
๐Ÿ“

Review Complete

Design review complete, construction may proceed

Kitchen Replacement Project is a Renovation/Alteration project located at 300 WEST STREET S (410 S West Dr), Leander, TX 78641 in Leander, Texas. The project has an estimated value of $484K covering 1,100 sq ft. Leander Independent School District is the property owner and O'Connell Robertson is the design firm of record. The project was registered with TDLR on December 18, 2025.

๐Ÿ“‹Scope of Work

Replacement of existing walk in cooler / freezer AND/OR serving line equipment; associated mechanical, electrical and plumbing. Minor architectural patch & repair from associated equipment replacement.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
+35d
December 18, 2025
Review Complete
January 22, 2026
Construction Start
January 14, 2026
Expected Completion
December 31, 2026

๐Ÿ“…Project Timeline

Filed

Dec 18, 2025

Review Complete

Jan 22, 2026

Inspection Complete

Closed

35d

Review duration

๐Ÿ”—Related Projects

๐Ÿ‘คSame Owner

$596.3M total
Kitchen Replacement Project
Cedar Parkยท$484K
Kitchen Replacement Project
Cedar Parkยท$484K
Kitchen Replacement Project
Cedar Parkยท$484K

๐Ÿ›๏ธSame Design Firm

$16.5M total
Florence ISD CTE Meat Processing Lab
Florenceยท$1.3M
TCP Westwood
Houstonยท$300K
Westover Hills Baptist Hospital - Postpartum Finish Out
San Antonioยท$5.9M
Frost Brenham Financial Center
Brenhamยท$9.0M

๐Ÿ“„Related City Permits

Building permits found at or near this location

3000 CHERRYWOOD RD

Interior remodel including removing a wall in kitchen/dining/living room. Rerouting plumbing and electrical for kitchen where necessary as shown in plans. Bathrooms to be gutted and have new fixtures and tile. Revision to add MP completed on 5/6

ActiveMechanical PermitAddition and RemodelJun 2026
View Details
2026-056417 MP
๐Ÿ”งTIPPERS TOP NOTCH SERVICES LLC
300 W 6TH ST

FIFTH THIRD BANK-E01 ILLUMINATED WALL SIGN ON THE SOUTH ELEVATION LOCATED AT 300 W 6TH STREET.

ActiveElectrical PermitWallJun 2026
View Details
2026-075209 EP
300 WESTMORLAND DR

Express - Remove and dispose of existing roof covering and exterior siding. Re-roof 1300sqft using metal roofing over new synthetic underlayment. Re-side 1000 sqft with James Hardie fiber-cement siding over OSB sheathing. Total Project Scope includes like for like exterior weatherproofing with no structural wall relocations or changes to building footprint.

ActiveBuilding PermitRepairJun 2026
$1
View Details
2026-072015 BP
3004 WHITE ROCK DR

Interior Remodel - renovating the interior of the home to be an open format floor plan with the removal of the central wall. New drywall to be installed and patched in areas exceeding 120 linear feet plumbing fixtures moved from south wall to north wall in primary bathroom window replacement like for like in the entire home and a french door to window change in the primary bedroom (egress area but with no change to width). Gas line to shift from the west to south wall of the kitchen. Attached carport and wood deck to be removed.

FinalElectrical PermitAddition and RemodelJun 2026
View Details
2026-048967 EP
๐Ÿ”งDuhon Electric
3000 LITTLE DON DR

Install Irrigation System

ActivePlumbing PermitIrrigationJun 2026
View Details
2026-072943 PP

Quick Actions

View on TDLR
TDLR ID: TABS2026008502

Property Owner

๐Ÿ‘ค
LEANDER INDEPENDENT SCHOOL DISTRICT
Contact: Jeremy Wahlberg
70 projects ยท $596.3M
View company profile
204 W. South Street P.O. Box 218, leander, Texas 78646
(512) 570-0648

Design Firm

๐Ÿ›๏ธ
O'Connell Robertson
4 projects ยท $16.5M
View all projects
811 Barton Springs RD Suite 900, Austin, Texas 78704
512-478-7286

Registered Accessibility Specialist

๐Ÿ“‹
KATHY ANN,RILEY
RAS #254
1408 NORTHRIDGE DR, AUSTIN, TX 78723
(512) 762-6349

Explore Area

๐Ÿ™๏ธ
Leander
View city projects
๐Ÿ—บ๏ธ
Williamson County
View county projects
๐Ÿ“ฎ
ZIP 78641
View zip code projects

Find Professionals

๐Ÿ”จ
Contractors in Leander
Licensed contractors directory
๐Ÿ—๏ธ
Builders in Leander
Home & commercial builders
๐Ÿ“
Architects in Leander
Architecture & design firms

Get alerts for Williamson

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists
Explore All Projects