Kitchen Replacement Project
๐Project Metrics
TDLR #TABS2026008499Review Complete
Design review complete, construction may proceed
๐Scope of Work
Replacement of existing walk in cooler / freezer AND/OR serving line equipment; associated mechanical, electrical and plumbing. Minor architectural patch & repair from associated equipment replacement.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$1.9M total๐Related City Permits
Building permits found at or near this location
replace tub/shower
Tunnel under front bathroom and rear bathroom to replace cast iron pipe with pvc trenching line on side of home to install new sewer line to connect to existing sewer line in the front of the home
ePlan: Residential Expedited Review - New Pool
Replacement of complete existing central heat and air system with or without duct work
Install new 200 amp service for food truck.