Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr in Brownsville, TX
Coffee Rd, b/w Paredes Line Rd to Woodway Dr, Brownsville, TX, 78521
Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr is a new construction project at Coffee Rd, b/w Paredes Line Rd to Woodway Dr, Brownsville, in Cameron County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Feb 2028. The project has an estimated value of $2.3M across about 35,000 sq ft.
- Estimated project value
- $2.3M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 35,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $66/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 3mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
23 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
228 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
457 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr
The City of Brownsville is preparing for significant infrastructure upgrades under the project titled Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr. This new construction project involves the installation of approximately 35,000 square yards of hot mix asphalt concrete pavement along the corridor between Paredes Line Road and Woodway Drive. The work is scheduled to finish in February 2028, following a construction start date of November 2026.
Project Scope and Scale
Beyond the primary pavement work, the filing details the addition of 10,000 square yards of sidewalk and shared use path, which will improve pedestrian and cyclist access along the route. The scope also includes 18,500 square feet of driveways and 12,500 linear feet of underground infrastructure improvements. With an estimated cost of $2,300,000, this project represents a major capital expenditure for the city, significantly exceeding the median estimated cost of $500,000 for similar new construction filings in Cameron County.
Halff serves as the design firm of record for this initiative. Their involvement ensures that the engineering standards meet the requirements for public funds and Federally funded roadway projects. The project is registered with TDLR, and plan review was completed in March 2026. This regulatory clearance allows the city to proceed with the scheduled construction activities later in the year.
The estimated cost per square foot is $66, which is below the county median of $98 for comparable projects. While the financial efficiency is notable, the scheduled build window of 457 days is longer than the county median of 252 days. This extended timeline reflects the complexity of coordinating utility improvements and large-scale pavement installation in a populated area of Brownsville.
Local Context
ZIP code 78521, where this project is located, has a population of about 87,860 people according to U.S. Census estimates. The median household income in this area is $41,276. The City of Brownsville has six other TDLR-registered projects totaling $7,113,417, indicating a broader pattern of infrastructure investment across the city. This project fits within that trend, aiming to enhance transportation reliability and safety for residents and commuters alike.
Isaac Ochoa is the registered accessibility specialist associated with this filing. His role ensures that the project meets the necessary standards for accessibility, a critical component for public infrastructure. The combination of roadway improvements, pedestrian pathways, and utility upgrades positions this project as a comprehensive enhancement to the Coffee Road corridor.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78521 (Brownsville)
One email per change. Unsubscribe in one click. Privacy.
Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr is a New Construction project located at Coffee Rd, b/w Paredes Line Rd to Woodway Dr, Brownsville, TX 78521 in Brownsville, Texas. The project has an estimated value of $2.3M covering 35,000 sq ft. City of Brownsville is the property owner and Halff is the design firm of record. The project was registered with TDLR on February 23, 2026.
Frequently Asked Questions
When will the Coffee Road project be completed?
Construction is scheduled to finish in February 2028, with work starting in November 2026.
Who is paying for this road improvement?
The City of Brownsville is the owner of record, and the project involves public funds.
Is the business open now?
This is a construction project, not a business. Work is scheduled to start in November 2026.
What is Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr?
Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr is a new construction project at Coffee Rd, b/w Paredes Line Rd to Woodway Dr in Brownsville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Install approximately 35,000 sq yds of hot mix asphalt concrete pavement, 10,000 sq yds of sidewalk/shared use path, 18,500 sq ft driveways and 12,500 linear ft of underground infrastructure improvements.
Is Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr open in Brownsville?
Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr is still under construction in Brownsville, TX, with an estimated completion of Feb 2028 according to its TDLR registration.
Where is Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr located?
Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr is located at Coffee Rd, b/w Paredes Line Rd to Woodway Dr, Brownsville, TX, 78521, in Cameron County.
Who is the owner or developer of Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr?
City of Brownsville is the property owner/developer of record for Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr, per its TDLR project registration.
Who is the architect or design firm for Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr?
Halff is the design firm of record for Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr, according to its TDLR filing.
How much does Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr cost and how big is it?
Coffee Rd Roadway, Drainage and Utility Improvements between Paredes Line Rd to Woodway Dr has an estimated construction value of $2.3M and approximately 35,000 square feet (about $66/sqft), based on its TDLR filing.
Scope of Work
Install approximately 35,000 sq yds of hot mix asphalt concrete pavement, 10,000 sq yds of sidewalk/shared use path, 18,500 sq ft driveways and 12,500 linear ft of underground infrastructure improvements.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Coffee Rd, b/w Paredes Line Rd to Woodway Dr, Brownsville, TX, 78521
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$8.9M totalWatch all construction in 78521 (Brownsville)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Brownsville?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.